Difference between revisions of "Meetings"
From GlueXWiki
(→Running) |
(→Working Group Meetings) |
||
Line 41: | Line 41: | ||
== Working Group Meetings == | == Working Group Meetings == | ||
− | ===Calorimetry=== | + | === Calorimetry === |
* [[Calorimetry Meetings]] | * [[Calorimetry Meetings]] | ||
* [[BCAL Commissioning]] | * [[BCAL Commissioning]] | ||
Line 47: | Line 47: | ||
* [[Calorimetry Archives]] | * [[Calorimetry Archives]] | ||
− | ===Electronics=== | + | === Electronics === |
* [[Electronics_Trigger_Meetings|Trigger Meetings]] | * [[Electronics_Trigger_Meetings|Trigger Meetings]] | ||
* [[Electronics Workshops/Pre-meetings|Workshops/Pre-meetings]] | * [[Electronics Workshops/Pre-meetings|Workshops/Pre-meetings]] | ||
* [[fADC FPGA Programming Meetings]] | * [[fADC FPGA Programming Meetings]] | ||
− | ===Engineering=== | + | === Engineering === |
* [[GlueX/Hall-D Installation Meetings]] | * [[GlueX/Hall-D Installation Meetings]] | ||
* [[JLAB Engineering Design and Fab meeting]] | * [[JLAB Engineering Design and Fab meeting]] | ||
* [[BCAL Installation Schedule]] | * [[BCAL Installation Schedule]] | ||
− | ===Offline Software=== | + | === Offline Software === |
* [[GlueX Offline Software Meetings]] | * [[GlueX Offline Software Meetings]] | ||
* [[GlueX Calibration Working Group Meetings]] | * [[GlueX Calibration Working Group Meetings]] | ||
Line 65: | Line 65: | ||
* [[GlueX Analysis Workshop 2013]] ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2272 Report] on the Wokshop) | * [[GlueX Analysis Workshop 2013]] ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2272 Report] on the Wokshop) | ||
− | ===Online Systems=== | + | === Online Systems === |
* [[Trigger/DAQ/Monitoring/Controls Meetings|Online Working Group Meetings]] | * [[Trigger/DAQ/Monitoring/Controls Meetings|Online Working Group Meetings]] | ||
Line 76: | Line 76: | ||
* [[July 2007 PID Workshop]] | * [[July 2007 PID Workshop]] | ||
− | ===Photon Beam and Tagger=== | + | === Photon Beam and Tagger === |
* [[Tagged Beam Group Biweekly Meetings|Biweekly Meetings]] | * [[Tagged Beam Group Biweekly Meetings|Biweekly Meetings]] | ||
* [[Special meeting on TAGM 4/28/2014|Special meeting on TAGM construction issues 4/28/2014]] | * [[Special meeting on TAGM 4/28/2014|Special meeting on TAGM construction issues 4/28/2014]] | ||
* [[Preparations for Internal Photon Beam Commissioning]] | * [[Preparations for Internal Photon Beam Commissioning]] | ||
− | ===Physics=== | + | === Physics === |
* [[Physics Working Group Meetings]] | * [[Physics Working Group Meetings]] | ||
* [[Physics Simulation Meetings]] | * [[Physics Simulation Meetings]] | ||
Line 87: | Line 87: | ||
=== Running === | === Running === | ||
− | * [https:// | + | * [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Fall_run Run Coordination Meetings: Fall 2014 run] |
* [https://hdops.jlab.org/wiki/index.php/Post-thanksgiving_period Post-Thanksgiving Running (Fall 2014)] | * [https://hdops.jlab.org/wiki/index.php/Post-thanksgiving_period Post-Thanksgiving Running (Fall 2014)] | ||
* [[Key Performance Parameters]] | * [[Key Performance Parameters]] | ||
− | * [https:// | + | * [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_run Run Coordination Meetings: Spring 2015 run] |
− | ===Solenoid=== | + | === Solenoid === |
* [[Solenoid Meetings]] | * [[Solenoid Meetings]] | ||
− | ===Target=== | + | === Target === |
* [[GlueX Target Meetings]] | * [[GlueX Target Meetings]] | ||
− | ===Tracking=== | + | === Tracking === |
* [[Tracking Meetings]] | * [[Tracking Meetings]] | ||
* [[FDC Meetings]] | * [[FDC Meetings]] | ||
* [[DC and PID Review]] | * [[DC and PID Review]] | ||
− | ===Trigger/DAQ/Monitoring/Controls=== | + | === Trigger/DAQ/Monitoring/Controls === |
* [[Trigger/DAQ/Monitoring/Controls Meetings|Online Working Group Meetings]] | * [[Trigger/DAQ/Monitoring/Controls Meetings|Online Working Group Meetings]] | ||
* [[Controls_Meetings | Agendas and Minutes for Controls meetings]] | * [[Controls_Meetings | Agendas and Minutes for Controls meetings]] |
Revision as of 11:13, 27 February 2015
Contents
Communication
|
GlueX General Meetings
GlueX Bi-Weekly Meetings |
GlueX-Collaboration-Meetings |
Collaboration Board |
GlueX Special Meetings
Working Group Meetings
Calorimetry
Electronics
Engineering
- GlueX/Hall-D Installation Meetings
- JLAB Engineering Design and Fab meeting
- BCAL Installation Schedule
Offline Software
- GlueX Offline Software Meetings
- GlueX Calibration Working Group Meetings
- GlueX Data Challenge Meetings
- GlueX Software Review Meetings
- February 2009 Tutorial
- GlueX Analysis Workshop 2013 (Report on the Wokshop)
Online Systems
Particle ID
- Time-of-Flight
- Start Counter
- GlueX Upgrade PID Meetings
- PID Progress
- May 2007 PID Workshop
- July 2007 PID Workshop
Photon Beam and Tagger
- Biweekly Meetings
- Special meeting on TAGM construction issues 4/28/2014
- Preparations for Internal Photon Beam Commissioning
Physics
Running
- Run Coordination Meetings: Fall 2014 run
- Post-Thanksgiving Running (Fall 2014)
- Key Performance Parameters
- Run Coordination Meetings: Spring 2015 run
Solenoid
Target
Tracking
Trigger/DAQ/Monitoring/Controls
- Online Working Group Meetings
- Agendas and Minutes for Controls meetings
- Trigger Working Group Meetings
- Subsystems Review
- GlueX Online Workshop July 2009 at CNU
- 12 GeV Trigger/Online Workshop July 2010 at CNU
GlueX Physics Meetings
- Photon-hadron physics with the GlueX detector at JLab (Program)