Difference between revisions of "BCAL"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
* [[BCAL Reconstruction]]
 
* [[BCAL Reconstruction]]
  
== BCAL Construction and Mechanical Issues ==
+
= BCAL Construction and Mechanical Issues =
 
* [[BCAL Mechanical Meetings]]
 
* [[BCAL Mechanical Meetings]]
 
* [http://kronos.phys.uregina.ca/~zisis/travellers/BCALConstruction.htm BCAL Construction Travelers] (private)
 
* [http://kronos.phys.uregina.ca/~zisis/travellers/BCALConstruction.htm BCAL Construction Travelers] (private)
Line 18: Line 18:
 
* [[BCAL_Pb_Sheet_Widths Revised]]
 
* [[BCAL_Pb_Sheet_Widths Revised]]
  
== Light Guides ==  
+
= Light Guides =  
  
 
* [[Media:BCAL LIGHTGUIDE LOCATION.pdf | Location of Light Guide Positions on Module Face]]
 
* [[Media:BCAL LIGHTGUIDE LOCATION.pdf | Location of Light Guide Positions on Module Face]]
Line 26: Line 26:
 
== [[Scintillation Fibers BCAL | Scintillation Fibers]]==
 
== [[Scintillation Fibers BCAL | Scintillation Fibers]]==
  
== Beam tests ==
+
=Beam tests =
 
* [[Beam/Cosmics Tests]]
 
* [[Beam/Cosmics Tests]]
 
* [http://argus.phys.uregina.ca/gluex/DocDB/0008/000804/005/BCAL06analysis2.pdf  Analysis of the BCAL Hall-B Beam test GlueX-Doc 804-v5]
 
* [http://argus.phys.uregina.ca/gluex/DocDB/0008/000804/005/BCAL06analysis2.pdf  Analysis of the BCAL Hall-B Beam test GlueX-Doc 804-v5]
Line 57: Line 57:
 
** See [https://mailman.jlab.org/pipermail/halld-cal/2012-May/000588.html e-mail with comments]
 
** See [https://mailman.jlab.org/pipermail/halld-cal/2012-May/000588.html e-mail with comments]
  
== Monte Carlo ==
+
= Monte Carlo =
 
* [[BCAL Reconstruction Software]]
 
* [[BCAL Reconstruction Software]]
 
* [[BCAL Stand-Alone Monte Carlo - energy resolution]]
 
* [[BCAL Stand-Alone Monte Carlo - energy resolution]]
Line 68: Line 68:
  
 
* [[BCAL Startup Checkout List 2014]]
 
* [[BCAL Startup Checkout List 2014]]
 
= Action Item Tracker =
 
*[[Bcal Action Item Tracker]]
 
  
 
= Archives =
 
= Archives =
Line 81: Line 78:
 
* [[Testing Page for Experiment Procedures for the Base Equipment in Hall ]]
 
* [[Testing Page for Experiment Procedures for the Base Equipment in Hall ]]
 
* [[Primer for shift takers DRAFT]]
 
* [[Primer for shift takers DRAFT]]
 +
*[[Bcal Action Item Tracker]]

Revision as of 08:43, 8 January 2016

BCAL.png

BCAL Web Sites

  • BCAL Information, Photos, Movies and History web site (Public)
  • BCAL Construction Documents web site (Private)

Meetings

BCAL Construction and Mechanical Issues

Light Guides

Scintillation Fibers

Beam tests

Monitoring

Installation

DAQ

Readout

Monte Carlo

Start up Activities

Archives

GlueX-notes: 985, 986, 987 and 989 document the Barrel Calorimeter as per the February 2008 Calorimeter Review.