Fabricated modules:
 
Fabricated modules:
 +
 +
[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/Crystal_inventory_06_23.xlsx Final inventory of fabricated modules ]
 +
  
 
:: - [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf  CRYTUR ]
 
:: - [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf  CRYTUR ]

Revision as of 20:26, 6 August 2023

Task list

Main fabrication steps

Construction schedule

Fabricated modules (pre-production)

Fabricated modules:

Final inventory of fabricated modules


- CRYTUR
- SICCAS
-Statistics per week

Summer Students (2022)

Wrapped CRYTUR crystals (2022)

Parts for module fabrication

Removing SICCAS crystals from CCAL


Procedures:


Assembled modules


Operational Safety Procedure (OSP)