File list
From GlueXWiki
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
08:04, 23 March 2012 | Recognizing Stroke.pdf (file) | 5 KB | 1 | ||
09:55, 28 November 2011 | Tagger steel1.jpg (file) | 8 KB | Tagger forgings close up | 1 | |
10:39, 25 July 2016 | ABC.pdf (file) | 11 KB | 1 | ||
07:35, 14 June 2018 | DIRC Water PS1 Form.pdf (file) | 12 KB | 1 | ||
08:46, 7 May 2020 | CPP Procurement schedule.docx (file) | 13 KB | rough guess at FY2020 procurements | 1 | |
09:55, 28 November 2011 | Tagger steel.jpg (file) | 13 KB | steel forgings with annealing oven | 1 | |
07:47, 8 May 2020 | Rolf's guidance.docx (file) | 14 KB | 1 | ||
14:33, 23 May 2013 | Target latest FMEA.pdf (file) | 14 KB | 1 | ||
10:45, 16 March 2012 | Time charges.pdf (file) | 14 KB | lates time charges for Hall D technical staff | 1 | |
09:05, 22 November 2013 | Hall D Tasks-1.pdf (file) | 16 KB | 1 | ||
07:52, 13 March 2014 | Hall D Tasks mar13 2014.pdf (file) | 16 KB | 1 | ||
07:42, 28 March 2014 | Hall D Tasks mar28 2014.pdf (file) | 16 KB | 1 | ||
12:34, 24 March 2021 | Lead joint side.pdf (file) | 17 KB | CPP US lead absorber side view | 1 | |
14:43, 12 May 2020 | Physics mtg 12May.png (file) | 18 KB | Rolf's resumption info | 1 | |
11:16, 30 September 2019 | Radiall connector.pdf (file) | 19 KB | HV cable connector 48 pin | 1 | |
12:51, 23 February 2012 | SAD Installation1.pdf (file) | 21 KB | 1 | ||
07:58, 6 May 2020 | Beam Resumption plan.docx (file) | 21 KB | Mark's written plan for resuming beam operations if needed | 1 | |
10:34, 23 April 2024 | CPS Absorber cooling 8 offset holes 2.pdf (file) | 26 KB | 1 | ||
06:45, 13 May 2020 | Beam Resumption plan tw.docx (file) | 28 KB | mark ups | 1 | |
07:37, 14 June 2018 | DIRC Water System stored energy.pdf (file) | 28 KB | 1 | ||
07:58, 1 August 2014 | Hall D Tasks Jul 24 2014.pdf (file) | 31 KB | 1 | ||
10:32, 23 April 2024 | CPS Absorber cooling 8 offset holes.pdf (file) | 31 KB | 1 | ||
14:26, 23 May 2013 | Target FMEA.pdf (file) | 33 KB | 1 | ||
14:02, 7 February 2020 | TaggerVac.png (file) | 33 KB | Tagger turbo excursion | 1 | |
10:11, 21 April 2014 | Target labor.pdf (file) | 34 KB | 1 | ||
11:05, 15 March 2013 | Mar 2013 Install Schedule.pdf (file) | 35 KB | 1 | ||
13:52, 5 April 2022 | Adj Lead.png (file) | 35 KB | 2 | ||
14:58, 24 September 2019 | Acrylic sheet.pdf (file) | 38 KB | 1/2"sheet with bevelled edges | 1 | |
10:42, 29 July 2019 | 32x32 crystal matrix 2D layout.pdf (file) | 38 KB | 32x32 | 3 | |
10:46, 29 July 2019 | 40x40 crystal matrix 2D layout.pdf (file) | 39 KB | 40x40 | 1 | |
13:54, 21 April 2022 | TAC-3x3.png (file) | 40 KB | 1 | ||
08:06, 16 November 2022 | FCAL2 lv,board.pdf (file) | 41 KB | 1 | ||
08:10, 28 May 2013 | Quench plot zoom.pdf (file) | 43 KB | 1 | ||
16:39, 28 May 2013 | Quench plot zoom.png (file) | 43 KB | 1 | ||
11:58, 1 April 2008 | Gluex Detector Tasks 4-1-08.doc (file) | 45 KB | Task tracked by Hall D engineering for each piece of the detector | 1 | |
09:06, 28 February 2014 | Hall D Tasks mar 2014.pdf (file) | 46 KB | 1 | ||
09:08, 17 January 2014 | Hall D Tasks-2.pdf (file) | 46 KB | 1 | ||
15:24, 30 January 2020 | G10 PMT Capture plate.pdf (file) | 46 KB | G10 | 1 | |
15:53, 28 May 2008 | Gluex Detector Tasks 5-28-08.doc (file) | 47 KB | ongoing status of mechanical designs | 1 | |
15:57, 28 May 2008 | Gluex Detector Tasks 5-20-08.doc (file) | 47 KB | 1 | ||
08:22, 10 February 2012 | Floor-plan 4th floor.pdf (file) | 47 KB | ARC building plan for engineering | 1 | |
12:28, 12 April 2013 | Tagger mapping.jpg (file) | 47 KB | 1 | ||
15:23, 30 January 2020 | Upstream plate.pdf (file) | 48 KB | brass module plate | 1 | |
12:34, 24 March 2021 | Lead joints.pdf (file) | 48 KB | cpp US lead absorber | 1 | |
10:17, 30 July 2019 | Cooling-compression Iso.jpg (file) | 50 KB | cooling plate | 1 | |
07:51, 27 September 2013 | 2013 Safety.pdf (file) | 50 KB | 1 | ||
12:47, 6 May 2009 | Tapered crimp pin.pdf (file) | 54 KB | 2 | ||
15:23, 30 January 2020 | Jacking plate.pdf (file) | 55 KB | brass | 1 | |
10:54, 8 February 2013 | Target calcs2.pdf (file) | 60 KB | 1 | ||
11:57, 16 June 2020 | CPP Procurement Priorities.docx (file) | 61 KB | Plan for installing 2021 spring | 1 |
First page |
Previous page |
Next page |
Last page |