GlueX Logo

Document List by Topic

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Planning and sub-topics are available:
(List events on Planning)

GlueX-doc-# Title Author(s) Topic(s) Last Updated
4901-v2 The GlueX Experiment: (part 1) A Short History of GlueX Curtis A. Meyer Planning
Collaboration
General Content
09 Oct 2023
5832-v2 Task list of the FCAL2 installation Arshak Asaturyan et al. Planning
Infrastructure
JEF Physics
Detector Hardware
23 Nov 2022
5445-v1 Optimization of empty target running Eugene Chudakov General
09 Feb 2022
5079-v3 Response to the ERR for E12-13-008/E12-13-008A Mark Ito et al. Planning
General
Project Status
Reviews
24 May 2021
4724-v3 PrimEx overview and preparation for 2021 Alexander Somov GlueX Experiment
Planning
22 Oct 2020
4483-v3 Preparation for PrimEx run in 2021 Alexander Somov Planning
Detector Hardware
13 May 2020
4183-v2 Offsite Processing of GlueX Raw Data in 2019 Alexander Austregesilo et al. Production
General
Computing
03 Oct 2019
3870-v11 Future Physics in Hall D with the GlueX Detector GlueX Collaboration et al. GlueX Experiment
Planning
GlueX Physics
19 Apr 2019
3413-v1 Fall 17/Spring 18 run preparation and run plan Alexandre Deur Planning
12 Oct 2017
2442-v1 Hall D/GlueX Technical Design Report GlueX Collaboration Planning
Photon Beam
Rates, Trigger and DAQ
Electronics
Engineering
GlueX Physics
Superconducting Solenoid
General Theory
Computing
Partial Wave Analysis
Monte Carlo
Design Report
Detector Hardware
13 Dec 2016
3004-v1 Online/L3 Status David Lawrence DAQ
General
Online
08 May 2016
2956-v1 Preparation for the Pion Polarizability Experiment Rory Miskimen General
FCAL
Upgrades
19 Feb 2016
641-v1 Update on the BCAL Simulation and Reconstruction Codes Mauricio Barbi et al. Event Generator
Test Beam
Scintillating Fibers
simulations
General
Presentation
Reconstruction
Beam Test
BCAL
11 Sep 2013
1982-v1 Summary of the Upgrade Workshop Curtis A. Meyer Planning
21 May 2012
1721-v1 Plan for Monitoring Histogram System in Hall-D David Lawrence et al. Monitoring/Calibration
General
Computing
24 May 2011
1200-v2 BCAL Developments Zisis Papandreou Readout
Mechanical
Fibers
BCAL
23 Jun 2010
831-v1 FADC-250 Cable Diagram Mark Taylor Frontend
Electronics
Electrical
Electrical
14 Jun 2007
707-v1 Reconstruction Software Studies to be Done for CD-2 David Lawrence Acceptance
General
General
General
Reconstruction
26 Oct 2006
624-v3 The First Two Years of GlueX Physics Curtis A. Meyer General
PWA
Analysis
28 Apr 2006
632-v2 Electronics Status Report for April 2006 Collaboration Meeting Paul Smith Trigger
DAQ
Mechanical
Engineering
Frontend
Presentation
Data Rates
Electronics
Tagger Rates
Electrical
Electrical
Beam Test
26 Apr 2006
524-v4 GlueX Electronics Status and Plan Paul Smith Overview
Design Report
Engineering
Communications
Frontend
Electronics
General
Electrical
Electrical
26 Apr 2006
413-v13 GlueX Electronics Crates and Racks Paul Smith Integration
Communications
Frontend
Electronics
Electrical
Electrical
26 Apr 2006
571-v1 Budget Justification for the CDC 3-Year R&D Effort Curtis A. Meyer Test Beam
General
Budget
Tracking
CDC
Beam Test
12 Dec 2005
567-v2 Summary of GlueX Beam Test Discussions Elton Smith Test Beam
30 Nov 2005

Number of documents found: 24

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.43 usr + 0.09 sys = 0.52 CPU)