Search results

From GlueXWiki
Jump to: navigation, search
  • #*Design: Eric's May 3<sup>rd</sup> note was discussed and Regina approved the design (the
    2 KB (254 words) - 11:45, 19 May 2006
  • ''Attendees'': Alex Dzierba, Paul S., Matt, Eric S. (Indiana), David L., Elliott (JLab), George, Mauricio, Zisis (Regina)
    4 KB (752 words) - 22:43, 23 May 2006
  • ''Attendees'': Alex, Chris, Eric (Indiana), David L., Elliott, Elton (JLab), Curtis (CMU), George, Rafael, Z ...ight guides (LGs): they were 4cm whereas IU thought they'd be 1.5 inches. Eric will check all tolerances and make sure all is ok. Pictures of the cart w
    7 KB (1,214 words) - 16:57, 6 July 2006
  • <tr><td>Eric Scott</td><td>Mechanical</td><td>June 12-16</td><td>Matt Shephard</td></tr>
    763 B (124 words) - 10:28, 21 July 2006
  • * ''Tentative dates for IU personnel:'' Eric (Aug. 20 - Aug.27)
    6 KB (1,040 words) - 21:11, 23 August 2006
  • ...e Kashy we need one day to uncrate, prepare, and then rig into the alcove (Eric). Then we will set up to take cosmics for at least two weeks (Zisis). - H-B will arrange for surveying marks on floor and wall (Dave). Eric will verify this is acceptable.
    3 KB (536 words) - 08:51, 11 July 2006
  • ''Attendees'': Matt, Eric (Indiana), David L., Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, ...ds re craning, alignment, surveying to the engineers as soon as possible. Eric will review the issue of extending the plate into the alcove for a smoooth
    6 KB (970 words) - 09:25, 11 July 2006
  • ...crane, etc, esp. requests for H-B technician time (Elliott with help from Eric,Zisis) - equipment will arrive at JLab towards the end of Aug (Zisis, Eric)
    3 KB (503 words) - 08:26, 11 July 2006
  • ''Attendees'': Matt (Cornell), Eric (Indiana), David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zis ...o machine parts for the cart. The rest of the work continues at Indiana. Eric is working on a design for the underlying plate, to allow the cart and leg
    3 KB (464 words) - 15:44, 12 July 2006
  • Report on meeting between Elliott, Eric, Dave Kashy, and Doug Tilles: ...(Dave). There should be no interference between it and the BCAL (Eric). Eric also verified there is no interference between the BCAL and the handrails o
    2 KB (376 words) - 13:27, 13 July 2006
  • ...fts cart assembly (estimated at 1,700 lbs.) onto platform using straps and Eric will prepare it to receive the carriage assembly.
    5 KB (794 words) - 15:38, 27 July 2006
  • ...uld allow the BCAL/carriage to swing without having to adjust the cables. Eric, please comment on how long you think the cables need to be once they reach
    2 KB (341 words) - 14:03, 19 July 2006
  • ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafa #* ''Indiana:'' Eric has communicated with all machine shops and work is proceeding as expected.
    4 KB (607 words) - 17:17, 19 July 2006
  • ...direction, as expected. A thin mu-metal foil is therefore required, since Eric Scott has measured residual magnitization in the stell inserts surrounding
    1 KB (205 words) - 00:00, 18 July 2007
  • :Eric Scott
    5 KB (860 words) - 14:07, 22 September 2006
  • - all work is on schedule (Doug, Eric). Eric will ship 16-Aug for arrival around 21-Aug. He will be here when everythin - Cannot connect anything to handrails (Bert). Doug will install Eric's kill switch on the veto/bpm stand at the entrance to the platform. 110V
    2 KB (344 words) - 13:19, 20 July 2006
  • ''Attendees'': Eric (Indiana), Elton, David, Alex (JLab), George, Blake, Rafael, Zisis (Regina) ...2" thick x 30" x 120") from 'Mu Metal' and it will be drop shipped to IU. Eric will remeasure the field once he gets this material and makes a single mu-m
    4 KB (618 words) - 11:43, 1 August 2006
  • ...ana:'' IU, CMU and FSU machine shops are done (see [[Optical Assembly]]). Eric is away this week but the cart will be assembled and load tested. The ligh # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu
    4 KB (585 words) - 10:54, 6 August 2006
  • [[Image:Cart_crane.jpg|thumb|400px|left|Eric placing the carriage on top of the cart. (August 11)]]
    1 KB (197 words) - 10:53, 13 August 2006
  • Participants: Elton, David L, Dave K, Doug, Matt, Eric
    2 KB (288 words) - 17:10, 10 August 2006

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)