Difference between revisions of "BCAL Construction"

From GlueXWiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 28: Line 28:
 
* [[Beam/Cosmics Tests]]
 
* [[Beam/Cosmics Tests]]
 
* [https://halldweb.jlab.org/DocDB/0008/000804/005/BCAL06analysis2.pdf  Analysis of the BCAL Hall-B Beam test GlueX-Doc 804-v5]
 
* [https://halldweb.jlab.org/DocDB/0008/000804/005/BCAL06analysis2.pdf  Analysis of the BCAL Hall-B Beam test GlueX-Doc 804-v5]
 
=Calibration=
 
* [[BCAL Calibration]]
 
  
 
= Installation =
 
= Installation =
Line 58: Line 55:
  
 
* [[BCAL LED Installation Photos]]
 
* [[BCAL LED Installation Photos]]
 +
 +
=Calibration=
 +
* [[BCAL Calibration]]
 +
 +
=Start up Checks=
 +
 +
* [[BCAL Startup Checkout List 2014]]
 +
*[[BCAL Preparations for spring 2016]]
  
 
= Monte Carlo =
 
= Monte Carlo =
Line 66: Line 71:
 
* [[BCAL Threshold Calculation]]
 
* [[BCAL Threshold Calculation]]
 
* [[PID Studies]]
 
* [[PID Studies]]
 
=Start up Checks=
 
 
* [[BCAL Startup Checkout List 2014]]
 
*[[BCAL Preparations for spring 2016]]
 
  
 
= Archives =
 
= Archives =

Latest revision as of 17:56, 2 February 2022

BCAL.png

BCAL Web Sites

  • BCAL Information, Photos, Movies and History (construction project at Regina) web site (Public)
  • BCAL Construction Documents web site (Private)

Design and Construction Meetings

BCAL Construction and Mechanical Issues

Light Guides

Scintillation Fibers

Beam tests

Installation

Readout

DAQ

Monitoring

Calibration

Start up Checks

Monte Carlo

Archives

GlueX-notes: 985, 986, 987 and 989 document the Barrel Calorimeter as per the February 2008 Calorimeter Review.