Difference between revisions of "Follow up on the Hodoscope Fabrication Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Meeting Agenda)
 
(5 intermediate revisions by 3 users not shown)
Line 40: Line 40:
 
:* [[Media:HV_Prep.docx‎ | Preparing cables]] (Nathan/Natalie)
 
:* [[Media:HV_Prep.docx‎ | Preparing cables]] (Nathan/Natalie)
 
:* Soldering dividers/amplifiers/cables (Nick/Chris)
 
:* Soldering dividers/amplifiers/cables (Nick/Chris)
:* Check Assembly performance
+
:* [https://userweb.jlab.org/~fklein/TAGH_pmt_tests.pdf Check Assembly performance]
 
:** Gain  
 
:** Gain  
 
:** High-rate performance
 
:** High-rate performance
Line 46: Line 46:
  
 
:2.  Counter Fabrication  ( <ins> Work performed at CUA </ins> )
 
:2.  Counter Fabrication  ( <ins> Work performed at CUA </ins> )
:* Inspection (measurement) of scintillators and light guides. Record parameters (work performed at JLab/CUA).
+
:* [https://userweb.jlab.org/~fklein/TAGH_counter_inspection.pdf Inspection (measurement) of scintillators and light guides]. Record parameters (work performed at JLab/CUA).
 
:* [[Media:D00000-19-01-P002.docx | Gluing PMTs to light guides (gluing fixture, joint inspection)]]
 
:* [[Media:D00000-19-01-P002.docx | Gluing PMTs to light guides (gluing fixture, joint inspection)]]
 
:* [[Media:D00000-19-01-P003.docx | Partial wrapping of light guides and  PMTs]]
 
:* [[Media:D00000-19-01-P003.docx | Partial wrapping of light guides and  PMTs]]
Line 54: Line 54:
 
:3.  Counter Installation  ( <ins>  Work performed at JLab  </ins> )
 
:3.  Counter Installation  ( <ins>  Work performed at JLab  </ins> )
 
:* [[Media:tagger hodoscope support frame installation views.docx | Support frame design and installation overview (with survey plan)]]
 
:* [[Media:tagger hodoscope support frame installation views.docx | Support frame design and installation overview (with survey plan)]]
:* [[File:PROTECTIVE COVER CONCEPT.PNG.ogg | Protective cover concept]]
+
:* [[Media:PROTECTIVE COVER CONCEPT.PNG | Protective cover concept]]
 
:* Final bench tests (HV, electronics)
 
:* Final bench tests (HV, electronics)
 
:* Installation of mounting frames in the tagger hall
 
:* Installation of mounting frames in the tagger hall
::* Installation procedures
+
::* [[Media:TAGH_Installation_Procedures.docx | Installation procedures]]
::* Final Tests (cosmics, radioactive source)
+
::* Final Tests and Calibration (radioactive source)
 
* Review Technical Documents
 
* Review Technical Documents
 
** Construction Plan
 
** Construction Plan
Line 69: Line 69:
 
(use gluex account to access files)
 
(use gluex account to access files)
  
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Tagging_hodoscope-Construction_Plan.pdf Construction Plan]
+
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Tagging_hodoscope-Construction_Plan.pdf Construction Plan]
  
 
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Tagging_hodoscope-QA_Plan.pdf Quality Assurance and Acceptance Test Plan]  
 
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Tagging_hodoscope-QA_Plan.pdf Quality Assurance and Acceptance Test Plan]  

Latest revision as of 10:53, 30 September 2013

Date and Time

10:00 am, September 30, 2013, room L207

Video Connection information if needed

JLab Conference Room L207

  • ESNET and EVO session
  • Phone only if requested:
    • +1-866-740-1260 : US
    • access code: 3421244# (remember the "#"). Phone line by request only.

Participants

CUA

  • Franz Klein (Professor of Physics)

JLab reviewers

  • Fernando Barbosa (Hall D eletrical engineer)
  • Eugene Chudakov (Hall D group leader)
  • William Crahen (Hall D engineer)
  • Glenn Young (Associate Project Manager for Physics)
  • Mark Ito (Hall D Staff)
  • Bruce Lenzer (JLab ESH&Q)
  • Vladimir Popov (JLab, ESH)
  • Elton Smith (Hall D Staff)
  • Alexander Somov (Hall D Staff, SOTR)
  • Timothy Whitlatch (Hall D engineer)
  • Jarrod Fitzpatrick (CFO)

Topics/Issues that need discussion/resolution

Documents on the Hodoscope Construction

Meeting Agenda

  1. Fabricating/Checking PMT assemblies ( Work performed at JLab )
2. Counter Fabrication ( Work performed at CUA )
3. Counter Installation ( Work performed at JLab )
  • Review Technical Documents
    • Construction Plan
    • Testing procedures
    • Quality Assurance Plans and Acceptance Test Plans
    • Documentation and Travelers
    • Personnel training

Contract Related Documents

(use gluex account to access files)

Construction Plan

Quality Assurance and Acceptance Test Plan

Statement of Work

Personnel Training

Quality Assurance Checklist