Difference between revisions of "Meetings"
From GlueXWiki
(→Running) |
(→Running) |
||
Line 116: | Line 116: | ||
=== Running === | === Running === | ||
− | * [[Run Coordination Meetings:Fall2019 Run]] | + | * [[Run Coordination Meetings:Fall2019 Run|Run Coordination Meetings: Fall2019 / Spring2020 Run]] |
* [[Run Coordination Meetings:Spring2019 Run]] | * [[Run Coordination Meetings:Spring2019 Run]] | ||
* [[Run Coordination Meetings:Fall2018 Run]] | * [[Run Coordination Meetings:Fall2018 Run]] |
Revision as of 10:18, 7 January 2020
Contents
[hide]Communication
|
GlueX General Meetings
GlueX Bi-Weekly Meetings |
GlueX-Collaboration-Meetings |
Collaboration Board |
GlueX Special Meetings
Working Group Meetings
Calorimetry
- Calorimetry Meetings
- BCAL Commissioning
- BCAL Reconstruction
- Calorimetry F250 Firmware
- Calorimetry Archives
Electronics
Engineering
- FCAL Insert Design Meetings
- GlueX/Hall-D Installation Meetings
- JLAB Engineering Design and Fab meeting
- BCAL Installation Schedule
Offline Software
- GlueX Offline Software Meetings
- GlueX Calibration Working Group Meetings
- GlueX Data Challenge Meetings
- GlueX Software Review Meetings
- February 2009 Tutorial
- GlueX Analysis Workshop 2013 (Report on the Wokshop)
- GlueX Physics Workshop 2016
- GlueX Containers Meetings
- HDGeant4 Meetings
Online Systems
Particle ID
- PID Working Group
- Time-of-Flight
- Start Counter
- DIRC Meetings
- PID Progress
- May 2007 PID Workshop
- July 2007 PID Workshop
- TRD
Photon Beam and Tagger
Physics
Production and Analysis Meetings Private | Old Production & Analysis Meetings |
Old Physics Simulation Meetings | |
Physics Working Group Meetings Private | Old Physics Working Group Meetings |
Amplitude Analysis Working Group- Private | |
Eta and Eta-prime and related analyses - Private | |
Dilepton Working Group - Private | |
Hyperon Working Group- Private | Old Hyperon Informal Working Group |
PrimEx-Eta Weekly Meeting- Private | |
KL Proposal - Private | |
Practice Talks |
Running
- Run Coordination Meetings: Fall2019 / Spring2020 Run
- Run Coordination Meetings:Spring2019 Run
- Run Coordination Meetings:Fall2018 Run
- Run Coordination Meetings:Fall2017 Spring2018 Run
- Run Coordination Meetings: Spring 2017 Run
- Run Coordination Meetings: Fall 2016 Run
- Run Coordination Meetings: Spring 2016 Run
- Run Coordination Meetings: Fall 2015 Run
- Run Coordination Meetings: Spring 2015 run
- Key Performance Parameters
- Post-Thanksgiving Running (Fall 2014)
- Run Coordination Meetings: Fall 2014 run
Solenoid
Target
Tracking
- New Tracking Meetings
- Historical Meetings
Level-1 Trigger
Level-3 Trigger
Trigger/DAQ/Monitoring/Controls
- Online Working Group Meetings
- Agendas and Minutes for Controls meetings
- Trigger Working Group Meetings
- Subsystems Review
- GlueX Online Workshop July 2009 at CNU
- 12 GeV Trigger/Online Workshop July 2010 at CNU
GlueX Physics Meetings
- Photon-hadron physics with the GlueX detector at JLab (Program) (2008).
- KL Workshop February 1-3, 2016. mini-Proceedings [1].
- Nuclear Photoproduction with GlueX April 28-29, 2016.
- The May Physics / Analysis Workshop May 2016.
- YSTAR Workshop November 16-17, 2016. mini-Proceedings [2].
- HIPS [3] February 6-7, 2017.
- Joint GlueX-PANDA Workshop [4] May 3-5, 2019
- Two-Meson Photoproduction Workshop, September 18, 2019
Other GlueX/HallD Meetings
- GlueX/Primex Meetings
- π polarizability Meetings
- JEF Meetings
- GlueX/IHEP Meetings
- PrimEx-Eta Weekly Meeting
Chronological list of meetings and workshops
- Meetings 2000-2007 (some links are lost)