File list
From GlueXWiki
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
12:36, 8 November 2007 | Residuals.pdf (file) | 331 KB | talk on FDC residuals for 2007-11-09 software meeting | 1 | |
13:32, 7 December 2007 | Trackplans.pdf (file) | 363 KB | talk on tracking plans | 1 | |
12:48, 12 December 2007 | Tracksoft.pdf (file) | 66 KB | view on tracking | 1 | |
11:15, 30 April 2008 | E787 triumf drift chamber.pdf (file) | 987 KB | NIM paper for UTC | 1 | |
11:17, 30 April 2008 | UTC Foil.pdf (file) | 458 KB | BNL E787 Tech Note on UTC foil fabrication | 1 | |
13:33, 15 July 2008 | Rss.gif (file) | 644 B | RSS icon | 1 | |
16:03, 27 February 2009 | Tutorial tracking mmi.pdf (file) | 923 KB | 2 | ||
10:41, 5 March 2009 | Fitter summary.pdf (file) | 157 KB | 1 | ||
13:40, 9 March 2009 | Eff vs p vs theta.gif (file) | 18 KB | partial plot, Dave's code only | 1 | |
13:21, 23 March 2009 | Pulls resids.pdf (file) | 320 KB | 1 | ||
15:07, 18 May 2009 | Work disk estimate.png (file) | 4 KB | 1 | ||
11:40, 7 October 2009 | 6 GeV Offline Computing.xls (file) | 24 KB | spreadsheet of BIA activities for Offline Computing | 1 | |
13:03, 3 March 2010 | Electronics Start Counter.png (file) | 336 KB | diagram of electronics chain for the start counter, from Fernando | 1 | |
13:04, 3 March 2010 | Electronics Time of Flight.png (file) | 349 KB | diagram of the electronics chain for the Time-of-Flight, from Fernando | 1 | |
15:11, 10 May 2010 | Bee Buzzing Sound.mp3 (file) | 3 KB | buzz | 1 | |
10:48, 24 May 2010 | Gasparian GlueX Phys meeting May 24 2010.ppt (file) | 460 KB | 1 | ||
13:36, 4 October 2010 | IMG 0905.JPG (file) | 69 KB | ugly mug | 1 | |
18:08, 18 November 2010 | Ccdb01.png (file) | 24 KB | ccdb before | 1 | |
18:08, 18 November 2010 | Ccdb02.png (file) | 20 KB | ccdb after | 1 | |
11:19, 22 December 2010 | ETC target 21dec10.xlsx (file) | 12 KB | Proposed changes, Excel spreadsheet | 1 | |
11:26, 22 December 2010 | 12 Gev 1552 20Dec2010 PMC.pdf (file) | 35 KB | baseline as of Dec. 20, 2010, target only | 1 | |
15:52, 2 February 2011 | 2011-02-02 13.58.15.jpg (file) | 869 KB | tour of hall | 1 | |
16:34, 3 March 2011 | TOF install concept.png (file) | 164 KB | TOF installation concept from Tim's Installation Review talk, February 2009. | 1 | |
12:45, 13 April 2011 | Online.png (file) | 28 KB | database schema for online conditions | 1 | |
13:30, 30 June 2011 | LightGuideMountConcept.pdf (file) | 11 KB | Conceptual drawing of light guide and tube support from Ian Winger of FSU. | 1 | |
09:52, 19 July 2011 | TOF mu metal test.xlsx (file) | 70 KB | Time-of-flight magnetic shielding test, mu metal only. | 1 | |
09:53, 19 July 2011 | TOF Mag shield data-mu metal plus steel.xlsx (file) | 112 KB | Time-of-flight magnetic shielding test, mu metal with steel. From Tim Whitlatch. | 1 | |
10:25, 19 July 2011 | H10534MOD DWG 100514.pdf (file) | 79 KB | Electrical schematic and mechanical drawing of Hamamatsu H10534MOD phototube and base. | 1 | |
10:32, 19 July 2011 | LightGuideDimensions.pdf (file) | 11 KB | Mechanical drawing, TOF light guide. From Ian Winger. | 1 | |
09:15, 27 July 2011 | Tof720.pptx (file) | 575 KB | 3D conceptual drawing of the time-of-flight from Chuck Hutton as of July 20, 2011. | 1 | |
15:39, 9 August 2011 | IMG 1824.jpg (file) | 780 KB | Photo new bend-cut machined light guide for the TOF from Paul Eugenio. | 1 | |
10:47, 11 August 2011 | Tof.png (file) | 3 KB | sketch of one layer of TOF, from tof.fig | 1 | |
14:45, 17 August 2011 | H10534.pdf (file) | 49 KB | Hamamatsu H10534, base schematic, mechanical dimensions, no dynode output | 1 | |
11:32, 2 September 2011 | Tof geometry issues.pdf (file) | 456 KB | from Chuck, issues with the geometry, his email | 1 | |
11:31, 19 September 2011 | R10533 tentative data sheet (June 2009).pdf (file) | 101 KB | specifications from Hamamatsu, tube used in the H10534 | 1 | |
16:21, 30 September 2011 | Target Review.pptx (file) | 1.27 MB | Jim Fochtman's presentation at the 9/29/11 target design review | 1 | |
10:17, 18 October 2011 | Splitter & Inverter.pdf (file) | 96 KB | schematic of splitters built for FSU | 1 | |
11:17, 6 December 2011 | Start counter.png (file) | 12 KB | shows 30-fold segmentation | 3 | |
11:47, 6 December 2011 | Sc drawing.pdf (file) | 740 KB | from Chuck | 1 | |
12:10, 6 December 2011 | Sym 30 front combined.png (file) | 21 KB | for thumbnail | 1 | |
12:10, 6 December 2011 | Sym 30 front combined.pdf (file) | 115 KB | from Werner, SiPM concept | 1 | |
12:14, 6 December 2011 | Sc drawing.png (file) | 14 KB | lower resolution | 2 | |
20:57, 16 January 2012 | Start counter chuck.png (file) | 31 KB | image from the pptx file | 1 | |
09:59, 16 May 2012 | Sc sipm board.png (file) | 16 KB | for the start counter, with the SiPM's | 1 | |
10:00, 16 May 2012 | Sc sipm preamp board.png (file) | 13 KB | for the start counter, preamp and other electronics for the read-out of the SiPM's | 1 | |
13:20, 10 July 2012 | Sc prototype board.jpg (file) | 56 KB | 1 | ||
13:28, 10 July 2012 | Sc prototype cable.jpg (file) | 50 KB | 1 | ||
09:27, 3 August 2012 | D00000-01-01-2000.png (file) | 14 KB | thumbnail png of start counter scintillator drawing | 1 | |
14:29, 3 August 2012 | Tof schedule project.png (file) | 24 KB | thumbnail for tof schedule | 1 | |
14:29, 3 August 2012 | 12GeV WBS 15231 Mark 03 Aug2012 PMC.pdf (file) | 54 KB | from baseline as of 8/3/12 | 1 |
First page |
Previous page |
Next page |
Last page |