Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • ** [[GlueX-Collaboration-May-2024 | May 2024 Meeting]] * [[Hall-D Weekly Meeting | GlueX Biweekly Meetings]]
    10 KB (1,163 words) - 10:53, 18 April 2024
  • May 2022 [[Tracking-5-12-2022|(12)]] May 2021 [[meetings-5-20-2021|(20)]]
    16 KB (1,785 words) - 16:56, 15 April 2023
  • * [[GlueX Software Meeting, May 6, 2024 | May 6, 2024]] * [[GlueX Software Meeting, April 22, 2024 | April 22, 2024]]
    21 KB (1,819 words) - 10:07, 3 May 2024
  • ...of Zoom meetings on the private Wiki] and select the GlueX/Hall D Biweekly Meeting link at the top of the list. == Meeting Agendas and Notes ==
    4 KB (435 words) - 11:27, 1 May 2024
  • == Meeting Time and Place == The meeting will be on Wednesday April 30, 2014 at 11:15am EDT.
    2 KB (249 words) - 10:51, 31 March 2015
  • ** We held our first controls meeting, see [http://www.jlab.org/Hall-D/software/wiki/index.php/Controls Controls * Review of minutes from [[OWG Meeting 13-Apr-2011 | 13-Apr-2011]] meeting
    5 KB (852 words) - 17:54, 31 March 2015
  • ...DB/0007/000784/001/SiPM-Status-200703.pdf Zisis talk] at the collaboration meeting (p 5, 1x1 mm<sup>2</sup> SiPM ...r 2 larger PDE. We have heard that CPTA technology is primitive, and that may be so, but then it should not be difficult to reproduce their performance i
    4 KB (617 words) - 12:39, 14 March 2017
  • # Review minutes from [[April 17, 2007 Software]] meeting # Software/Calorimetry meeting schedule
    3 KB (474 words) - 17:13, 24 February 2017
  • * [[May 2007 PID Workshop]] ** [[Neutral Particle PID May 2007]]
    4 KB (536 words) - 12:39, 14 March 2017
  • # Review minutes from [[May 1, 2007 Software]] meeting We ''may'' have a VRVS connection depending if the equipment is in good working orde
    4 KB (725 words) - 17:13, 24 February 2017
  • This meeting page is retained as an historical record. ...ting in January, 2022 there is a [[Tagged Beam Group Biweekly Meetings|new meeting page]].
    3 KB (435 words) - 06:50, 19 January 2022
  • === [[GlueX Offline Meeting, June 15, 2010|June 15, 2010]] === # Bring up DAQ software release method at an online meeting. -> Elliott
    2 KB (295 words) - 17:51, 29 November 2019
  • ...g/wiki/index.php/Run_Coordination_Meetings:_Fall_2015_Run run coordination meeting pages]) ...sioning. Meanwhile, we may parasitically conduct tagger detector tests. We may also have the beam available, typically during the night, to conduct our ow
    14 KB (2,187 words) - 16:28, 26 November 2018
  • ''<font color=red>Meeting Time: 11:00 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    5 KB (708 words) - 12:38, 14 March 2017
  • ...te? Concept by Regina/JLav Engineers. A supporting (honeycomb-type) frame may be needed to keep the SiPMs against the BCAL; spring loaded pressure action ** Jan 31: At the collaboration meeting the question was raised as to whether Peltier junctions could (should?) be
    6 KB (894 words) - 12:38, 14 March 2017
  • *[[Tracking-5-12-2022| May 12]] May 2021 [[meetings-5-20-2021|(20)]]
    15 KB (1,677 words) - 16:13, 30 March 2023
  • * Winter 2024 Meeting [[GlueX-Collaboration-Feb-2024 |Collaboration Meeting]]
    8 KB (752 words) - 11:10, 17 April 2024
  • * The meeting will be held at 10:00 EST (9:00 CST) #* ''Reviewers'': Two reviewers are in the process of being contacted. There may be a third. The 12 GeV management will send them the terms of reference.
    4 KB (603 words) - 17:00, 24 February 2017
  • The meeting will be at 11:00am in Cebaf Center F324-325. We will attempt an ESNet connection for this meeting using the following number:
    8 KB (1,388 words) - 12:38, 14 March 2017
  • System & Integration Review - 7-9 May 2008 [http://www.jlab.org/Hall-D/software/wiki/index.php/Subsystem_Review R > [[F1TDC-V2 Meetings|F1TDC-V2 Meeting Minutes]]
    10 KB (1,242 words) - 10:59, 20 December 2019
  • The May 2008 Hall D Subsystem Review will cover all aspects of Hall D that have not Current planning is for a 1 1/2 day meeting the week of 7-May, with no parallel sessions. This will be a combined Hall D and Hall B revi
    7 KB (978 words) - 12:39, 14 March 2017
  • == GlueX Collaboration Meeting == May 8, 9 an 10, 2008 at Jefferson Lab
    5 KB (586 words) - 12:40, 14 March 2017
  • * The meeting will be held at 10:30 am ET # [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?)
    3 KB (385 words) - 17:12, 24 February 2017
  • * May 2008 Collaboration Meeting ...ontent in the three attachments below was presented by the Athens group on May 5, 2008.
    4 KB (503 words) - 13:25, 6 December 2017
  • ...ing.ppt my talk on Tagging Near the Endpoint at the May 2008 collaboration meeting], the Hall D tagger acceptance extends up to 11.7 GeV. Right now we are mo ...h each, so the actual standard deviation is more like 4-5 MeV. However we may have trouble proving that we can calibrate the absolute energy in the micro
    9 KB (1,425 words) - 12:39, 14 March 2017
  • * The meeting will be held at 10:30 am ET # Previous minutes: [[May 5, 2008 Calorimetry]]
    1 KB (159 words) - 17:11, 24 February 2017
  • FDC Weekly Meeting Date: May 29, 2008
    15 KB (2,462 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: June 19, 2008 @ 1:30 p.m.
    8 KB (1,388 words) - 17:13, 24 February 2017
  • * [https://april.aps.org/ APS April Meeting], Sacramento, CA and Virtual, 3-6 April 2024 ...vanced Tools for Hadron Spectroscopy (PWA13/ATHOS8)], Williamsburg, VA, 28 May - 1 June 2024
    42 KB (5,494 words) - 09:48, 23 April 2024
  • FDC Weekly Meeting Next Meeting: July 3, 2008 @ 1:30 p.m.
    10 KB (1,617 words) - 17:13, 24 February 2017
  • * The meeting will be held at 10:30 am ET ...Matt indicated that fits to the multiple layers and position determination may not have been used in these studies. In any case, the optimal algorithms to
    7 KB (1,029 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: July 17, 2008 @ 1:30 p.m.
    12 KB (1,986 words) - 17:00, 24 February 2017
  • FDC Weekly Meeting Next Meeting: July 24, 2008 @ 1:30 p.m.
    13 KB (2,200 words) - 17:12, 24 February 2017
  • * The meeting will be held at 10:30 am ET #** Elton: Optimum granuarity for SiPMs may be closer to 4x4 (instead of 6x4). George agreed, indicating simulation of
    8 KB (1,223 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: July 31, 2008 @ 1:30 p.m.
    17 KB (2,825 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: August 14, 2008 @ 1:30 p.m.
    19 KB (3,165 words) - 17:13, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    13 KB (1,745 words) - 12:39, 14 March 2017
  • FDC Weekly Meeting Next Meeting: August 28, 2008 @ 1:30 p.m.
    16 KB (2,702 words) - 17:14, 24 February 2017
  • FDC Weekly Meeting Next Meeting: September 11, 2008 @ 1:30 p.m.
    13 KB (2,115 words) - 17:12, 24 February 2017
  • FDC Weekly Meeting Next Meeting: September 25, 2008 @ 1:30 p.m.
    14 KB (2,272 words) - 17:12, 24 February 2017
  • ...d that when we lift the middle magnet yoke plate off the vacuum chamber we may have difficulties. He recommended foreseeing some jacks to help at the star ...the pair spectrometer vacuum chamber top and bottom plates from iron. This may be cheaper than bolting plates onto the pole and will reduce the pole gap.
    10 KB (1,378 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: October 2, 2008 @ 1:30 p.m.
    17 KB (2,787 words) - 17:14, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    7 KB (948 words) - 12:40, 14 March 2017
  • == GlueX Collaboration Meeting == <font size="+1">May 11, 12 and 13, 2009 at Jefferson Lab CC F326</font>
    8 KB (1,006 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: October 9, 2008 @ 1:30 p.m.
    13 KB (2,198 words) - 16:53, 24 February 2017
  • FDC Weekly Meeting Next Meeting: October 16, 2008 @ 1:30 p.m.
    12 KB (1,907 words) - 16:53, 24 February 2017
  • FDC Weekly Meeting Next Meeting: October 23, 2008 @ 1:30 p.m.
    12 KB (2,060 words) - 17:12, 24 February 2017
  • ...ew of minutes from [[OWG meeting 3-Oct-2008 | 3-Oct-2008]] meeting (29-Oct meeting was canceled) * Report from EPICS collaboration meeting (Padua) and PCaPAC conference (Ljubljana) (see [https://halldweb.jlab.org/d
    5 KB (841 words) - 17:14, 24 February 2017
  • !width="450"| Meeting ...ttp://www.aps.org/meetings/april/index.cfm American Physical Society April Meeting] || Salt Lake City, UT, 2016 April 16-19 || Matthew&nbsp;Shepherd || [https
    14 KB (1,602 words) - 17:13, 24 February 2017
  • =Items for followup from Feb 19 meeting= #* Blake was not available and no simulation meeting this week.
    5 KB (711 words) - 17:13, 24 February 2017

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)