- #*Design: Eric's May 3<sup>rd</sup> note was discussed and Regina approved the design (the2 KB (254 words) - 11:45, 19 May 2006
- ''Attendees'': Alex Dzierba, Paul S., Matt, Eric S. (Indiana), David L., Elliott (JLab), George, Mauricio, Zisis (Regina)4 KB (752 words) - 22:43, 23 May 2006
- ''Attendees'': Alex, Chris, Eric (Indiana), David L., Elliott, Elton (JLab), Curtis (CMU), George, Rafael, Z ...ight guides (LGs): they were 4cm whereas IU thought they'd be 1.5 inches. Eric will check all tolerances and make sure all is ok. Pictures of the cart w7 KB (1,214 words) - 16:57, 6 July 2006
- <tr><td>Eric Scott</td><td>Mechanical</td><td>June 12-16</td><td>Matt Shephard</td></tr>763 B (124 words) - 10:28, 21 July 2006
- * ''Tentative dates for IU personnel:'' Eric (Aug. 20 - Aug.27)6 KB (1,040 words) - 21:11, 23 August 2006
- ...e Kashy we need one day to uncrate, prepare, and then rig into the alcove (Eric). Then we will set up to take cosmics for at least two weeks (Zisis). - H-B will arrange for surveying marks on floor and wall (Dave). Eric will verify this is acceptable.3 KB (536 words) - 08:51, 11 July 2006
- ''Attendees'': Matt, Eric (Indiana), David L., Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, ...ds re craning, alignment, surveying to the engineers as soon as possible. Eric will review the issue of extending the plate into the alcove for a smoooth6 KB (970 words) - 09:25, 11 July 2006
- ...crane, etc, esp. requests for H-B technician time (Elliott with help from Eric,Zisis) - equipment will arrive at JLab towards the end of Aug (Zisis, Eric)3 KB (503 words) - 08:26, 11 July 2006
- ''Attendees'': Matt (Cornell), Eric (Indiana), David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zis ...o machine parts for the cart. The rest of the work continues at Indiana. Eric is working on a design for the underlying plate, to allow the cart and leg3 KB (464 words) - 15:44, 12 July 2006
- Report on meeting between Elliott, Eric, Dave Kashy, and Doug Tilles: ...(Dave). There should be no interference between it and the BCAL (Eric). Eric also verified there is no interference between the BCAL and the handrails o2 KB (376 words) - 13:27, 13 July 2006
- ...fts cart assembly (estimated at 1,700 lbs.) onto platform using straps and Eric will prepare it to receive the carriage assembly.5 KB (794 words) - 15:38, 27 July 2006
- ...uld allow the BCAL/carriage to swing without having to adjust the cables. Eric, please comment on how long you think the cables need to be once they reach2 KB (341 words) - 14:03, 19 July 2006
- ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafa #* ''Indiana:'' Eric has communicated with all machine shops and work is proceeding as expected.4 KB (607 words) - 17:17, 19 July 2006
- ...direction, as expected. A thin mu-metal foil is therefore required, since Eric Scott has measured residual magnitization in the stell inserts surrounding1 KB (205 words) - 00:00, 18 July 2007
- :Eric Scott5 KB (860 words) - 14:07, 22 September 2006
- - all work is on schedule (Doug, Eric). Eric will ship 16-Aug for arrival around 21-Aug. He will be here when everythin - Cannot connect anything to handrails (Bert). Doug will install Eric's kill switch on the veto/bpm stand at the entrance to the platform. 110V2 KB (344 words) - 13:19, 20 July 2006
- ''Attendees'': Eric (Indiana), Elton, David, Alex (JLab), George, Blake, Rafael, Zisis (Regina) ...2" thick x 30" x 120") from 'Mu Metal' and it will be drop shipped to IU. Eric will remeasure the field once he gets this material and makes a single mu-m4 KB (618 words) - 11:43, 1 August 2006
- ...ana:'' IU, CMU and FSU machine shops are done (see [[Optical Assembly]]). Eric is away this week but the cart will be assembled and load tested. The ligh # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu4 KB (585 words) - 10:54, 6 August 2006
- [[Image:Cart_crane.jpg|thumb|400px|left|Eric placing the carriage on top of the cart. (August 11)]]1 KB (197 words) - 10:53, 13 August 2006
- Participants: Elton, David L, Dave K, Doug, Matt, Eric2 KB (288 words) - 17:10, 10 August 2006
- ...ics.indiana.edu/~mashephe/bcal_mov/translate.mov Translate (868 KB)]: Here Eric is sliding the carriage back and forth. The carriage is loaded with 2500 p2 KB (377 words) - 19:31, 13 August 2006
- ''Attendees'': Eric (Indiana), Matt (Cornell), Alex, Elton, David, Elliott, Dan Sober, Simon (J3 KB (432 words) - 18:49, 16 August 2006
- # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu3 KB (453 words) - 18:53, 16 August 2006
- '''These numbers will be checked and further refined by Eric, a week before the run.''' In the interim, the H-B engineers will move a l40 KB (6,903 words) - 11:09, 31 March 2015
- In attendance: Elliott, Elton, Dave Kashy, Eric Scott, Doug Tilles - cart, etc. should arrive Monday. Eric will be here for installation.1 KB (181 words) - 09:13, 29 August 2006
- ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael (JLab), Franz ( ...cabled, and the entire setup is covered with a layer of Tedlar. Kudos to Eric & IU for a phenomenal job on the cart, carriage and installation and to the5 KB (932 words) - 10:04, 8 September 2006
- ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael, Simon, Alex (J ...tatus Quo:'' The BPM stand is 1/2 done. The crash-button post is pending; Eric can do it when he arrives if not done before.4 KB (686 words) - 10:41, 8 September 2006
- - Eric will arrive at JLab 18-Sep.1 KB (196 words) - 08:52, 11 September 2006
- ''Attendees'': Alex, Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael, Simon (JLab),3 KB (449 words) - 13:49, 18 September 2006
- #* Zisis will contact Eric Scott to see if the two can recreated the lost position measurements of the3 KB (545 words) - 02:51, 1 April 2015
- ..., construction, and calibration see Eric Pooser's dissertation<ref>Pooser, Eric J., "The GlueX Start Counter & Beam Asymmetry <math>\Sigma</math> in Single3 KB (374 words) - 11:39, 13 September 2023
- ..._archives/HALLD/halld-controls/CURRENT/msg00048.html What's our need? from Eric Scott]2 KB (193 words) - 16:46, 3 April 2008
- ...2015 Summer Collaboration Meeting || Newport News, VA, 2015 July 17-18 || Eric Pooser || [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=214 KB (1,602 words) - 17:13, 24 February 2017
- ...t?docid=2958 Updates on pη' and the π<SUP>0</SUP> beam asymmetry] - Eric Pooser9 KB (1,147 words) - 12:39, 14 March 2017
- * Eric Pooser, <b>Ph.D. Thesis</b>, Florida International University, Supervisor:11 KB (1,567 words) - 14:17, 16 May 2024
- *<font color=blue><i>Hybrid Mesons</i>, Curtis A. Meyer and Eric Swanson, Progress in Particle and Nuclear Physics <b>82</b>, 21 (2015), [ht15 KB (2,319 words) - 12:21, 29 July 2021
- # Start Counter Status: Werner Boeglin/Eric Pooser * '''FIU''': Werner Boeglin, Eric Pooser4 KB (673 words) - 17:23, 31 March 2015
- Werner reported that Eric Pooser has started a TDR contribution for the start counter.3 KB (502 words) - 14:09, 21 April 2016
- ''Attendees: Werner, Joerg, Eric, Mahmoud (FIU), Will M. (CMU), Tegan, Zisis (Regina)" ...o eta-gg, eta->pi+pi-, clear peak in simulations, but broad. 9GeV gammas. Eric looks at pi+pi-g so far, harder to analyze.4 KB (565 words) - 19:35, 8 February 2016
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann ...m; it looks like a loose connection between the ST-1 and ST-2 boards. Also Eric could not see output on the FADC scalers. He thought this might be related2 KB (284 words) - 14:50, 3 December 2015
- ...ldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1683 Timing Studies] - Eric Pooser9 KB (1,174 words) - 12:39, 14 March 2017
- ** Eric Pooser: graduate student, working on prototype hardware studies2 KB (392 words) - 21:54, 31 March 2015
- # Start Counter News: Werner, Lei, Eric * '''FIU''': Werner Boeglin, Lei Guo, Eric Pooser3 KB (549 words) - 17:01, 24 February 2017
- # Start Counter News: Werner, Lei, Eric * Eric Pooser has started looking at a new amplifer that should have higher bandwi2 KB (258 words) - 07:03, 1 April 2015
- ...C Summer Collaboration Meeting, Jefferson Lab, July 18, 2015, presented by Eric Pooser. ...b.jlab.org/doc-private/DocDB/ShowDocument?docid=2880 GlueX Start Counter], Eric Pooser77 KB (10,281 words) - 10:24, 23 April 2024
- # Start Counter News: Werner, Lei, Eric * Werner and Eric have looked at a new fast shaping amplifier. It looks good so far. They wil4 KB (571 words) - 06:07, 1 April 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann * Eric has finished writing his thesis!3 KB (476 words) - 12:38, 14 March 2017
- * '''FIU''': Lei Guo, Eric Pooser * Eric is finishing building the dark box that will house the scintillator and lon2 KB (294 words) - 06:58, 1 April 2015
- * '''FIU''': Werner Boeglin, Lei Guo, Eric Pooser4 KB (614 words) - 23:47, 31 March 2015
- * '''FIU''': Mahmoud Kamel, Eric Pooser There was one round of pedestal adjustment for the FADCs early in the run by Eric and Sergey Furletov. Nothing has been done since. Beni advocates doing anot4 KB (642 words) - 17:00, 24 February 2017