Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • ...ttendance: Elliott W, Carl T, David L, Dave A, Vardan G, Simon T, Elke A, Elton S, Mark I, Chris C, Fernando B, Mark T, Tanest C, Bill G, Jeff W, Armenak S Elke and Elton emphasized it is important to distinguish between true design goals, i.e. t
    5 KB (870 words) - 13:55, 27 August 2007
  • ...Elliott W, Fernando B, Vardan G, Carl T, David L, Dave A, Elke A, Simon T, Elton S, Graham H, Dave D. ...one-page document listing online design goals and requirements (thanks to Elton for pushing this). It will list the basic rate and other performance requi
    5 KB (864 words) - 13:55, 27 August 2007
  • ...meet them. A complete set of experiment design goals has been compiled by Elton in GlueX-doc-866 in the [http://portal.gluex.org DocDB].
    7 KB (1,032 words) - 13:29, 12 May 2008
  • [[Online_Design_Goals]] and Elton's Hall D Design Goal document (GlueX-doc-866 in the [http://portal.gluex.or (Elton suggests creating a table of configurations needed...ejw, 14-Aug-2007)
    8 KB (1,148 words) - 09:30, 9 July 2008
  • ...ndees: David L.(chair), Mike W., Mark I., Elliott W., Simon T., Eugene C., Elton S.,
    4 KB (605 words) - 09:33, 20 August 2007
  • Attendees: Simon T., David L.(chair), Mark I., Elton S., Elliott W., Mike W. # Elton suggested we look at the event size as an action item. It was agreed that t
    3 KB (503 words) - 10:32, 22 August 2007
  • In attendance: Simon T, Fernando B, Chris C, Dave A, Elke A, Eugene C, Elton S, David L, Graham H, Elliott W, Gerard V (by phone).
    7 KB (1,172 words) - 13:50, 25 September 2007
  • * At the meeting a barrel PID working group was established. Elton will chair the group, the other members are Eugene, Beni, Mihajlo, Matt B.
    3 KB (459 words) - 08:53, 31 August 2007
  • * Present: Richard J., Brendan P., Curtis M., Alex B., Eugene C., James M., Elton S., Alex S., Michael D., Tim W., Alex D., Nathan S., Eugene C., Franz K., a
    844 B (123 words) - 13:32, 5 January 2015
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=2618 Calibration Constants] (Elton) ''Attendees: Will L., Will M. (CMU), Elton, Mark D., David (JLab), Christina, George (Athens), Tegan, Ahmed, Zisis (Re
    8 KB (1,292 words) - 16:48, 24 February 2017
  • Attendees: David L. (chair), Elke A., Mark I., Elliott W., Simon T., Elton S., Dennis W.
    3 KB (402 words) - 11:37, 14 September 2007
  • Attendees: E.Wolin, David L, Dave A, Graham H, Carl T, Elton S, Elke A, Chris C, Fernando B, Dave D, Walt M. By phone Matt S, Beni Z, G
    6 KB (888 words) - 12:38, 14 March 2017
  • * Time windows - Elliott will talk with Elton and other detector folks.
    4 KB (703 words) - 11:10, 5 May 2008
  • ** ''Elton, Smith'': Notes on Hall D Tagger Review 4/30/07 (and Franz' additions)
    12 KB (2,033 words) - 17:13, 24 February 2017
  • ** ''Elton, Smith'': Notes on Hall D Tagger Review 4/30/07 (and Franz' additions)
    12 KB (2,046 words) - 22:10, 14 October 2007
  • :: [https://logbooks.jlab.org/entry/3360082 Elton studies]
    162 B (23 words) - 10:27, 16 November 2015
  • ## π<sup>0</sup> calibration. (Elton S.) 8h <span style="color:red">Need the luminosity, detector and trigger sp *12h. Elton S.
    14 KB (2,187 words) - 16:28, 26 November 2018
  • Online: Kathryn, George Lolos, Zisis, Andrei, Elton, Elke, George Biallas, Chuck, Tim, Christine, Pavols, George Voulgaris. ** Next week: George and Christina will send Elton specifications already written as a basis for the document. (See also one o
    6 KB (894 words) - 12:38, 14 March 2017
  • :* Elton has posted a new note with plots of the magnetic field in the regions where them to Elton.
    5 KB (858 words) - 10:36, 14 November 2007
  • ...year, Thursday mornings at 11am EST works for Indiana, Athens, Regina and Elton. FSU has not replied yet. We will revise this time in early 2008.
    4 KB (586 words) - 17:12, 24 February 2017
  • #** Elton suggested we use 200 ps for mip timing resolution. Note from cosmics: sigma
    4 KB (570 words) - 17:00, 24 February 2017
  • # Agree on a set of specifications for the tagger hodoscopes for Elton's spec document.
    7 KB (1,082 words) - 13:27, 18 January 2008
  • Attendees: (IU) Alex, Mihajlo (UofR) George, Andrei (Athens) Christine (JLab) Elton, Tim, Carl.<br> Zisis was not online. Elton took minutes.<br>
    5 KB (699 words) - 17:05, 24 February 2017
  • Attendees: Elliott W, Dave A, Chris C, Fernando B, Mark I, Elton S, Dave D, Ed J, Carl T, Simon T.
    4 KB (638 words) - 12:39, 14 March 2017
  • ** 09:45 Upcoming Reviews (30 min) Elton Smith * Session Ib Infrastructure and Beam --- Chair Elton Smith
    4 KB (618 words) - 17:00, 24 February 2017
  • #** [http://clasweb.jlab.org/elton/halld/plot_guide.ps Histogram Output] Attendees: Alex, Matt, Beni, Mihajlo (Indiana), Elton, Tim (JLab), Elke (DESY), George, Zisis (Regina)
    4 KB (603 words) - 17:00, 24 February 2017
  • Attendees: Elke, Elton, Tim, Fernando (JLab), Curtis (CMU), George, Andrei, Zisis (Regina) #* Elton deferred the bulk of the presentation on his light guide studies until the
    5 KB (707 words) - 18:29, 15 April 2008
  • * 3:00 SiPMs - George, Zisis, Carl, Richard, Elton, Fernando
    933 B (107 words) - 17:05, 24 February 2017
  • ...ivingston, Yang Guangliang, Richard Jones, Elke Aschenauer, Tim Whitlatch, Elton Smith.
    12 KB (1,897 words) - 23:39, 28 January 2008
  • Attendees: David L.(chair), Simon T., Eugene C., Elton S., Mark I., Elke A.
    4 KB (614 words) - 13:58, 8 February 2008
  • Attendees: Matt Bickley, Simon T, Mark I, Elton S, Chris C, Elke A, David L, Graham H, Alex S, Vardan G, Dave A, Elliott W
    4 KB (629 words) - 15:10, 27 February 2008
  • ...r, Brian, Elke, Kim, Chuck, Fernando, Curtis, Yves, Paul, Matt, Bill, Tim, Elton, Gerard
    11 KB (1,865 words) - 16:44, 8 February 2008
  • Attendees: Dave A, Elke A, Elton S, Alex S, Vardan G, Carl T, Simon T, Fernando B, Elliott W.
    4 KB (603 words) - 18:06, 29 February 2008
  • Participants: Daniel, Elke, Sasha, Mark, Elton, Simon, Curtis, David, Tim
    2 KB (348 words) - 10:45, 16 February 2008
  • # [[DC and PID Review]] Schedule for preparations (Elton) @JLab: David L., Elton S., Tim W., Paul E., Simon T., Alex S., Mark I., Dan C.
    8 KB (1,388 words) - 12:38, 14 March 2017
  • ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1001 Talk 6] 4:30 pm Elton ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1001 Talk 6] 4:30 pm Elton
    5 KB (628 words) - 17:13, 24 February 2017
  • # [[DC and PID Review]] Schedule for preparations (Elton)
    2 KB (257 words) - 12:31, 29 February 2008
  • Online: George, Zisis, Andrei, Mihajlo, Alex, Fernando, Carl, Tim, Elton, Elke <br> Notes by Elton <br>
    4 KB (550 words) - 17:13, 24 February 2017
  • Attendees: E.Wolin, Chris C, Fernando B, Simon T, Elton S, Carl T, David L, Alex S, Dave D, Ben R, Ed J, Eugene C, Elke A, Vardan G
    3 KB (548 words) - 17:08, 31 March 2008
  • Attending: UR Zisis, George, Andrei, JLab: Fernando, Tim, Jim, Stewart, Elke, Elton, Carl, Eugene. <br> ...ential) responses and will be provided to members of the evaluation board (Elton, Carl, Stepan Stepanyan, George).
    4 KB (625 words) - 16:51, 24 February 2017
  • ...ex S, Carl T, Ben R, Graham H, Elke A, Dave D, Chris C, Fernando B, Jim S, Elton S. * Elton says the cost for heat exchangers is included in the infrastructure budget.
    4 KB (632 words) - 12:40, 14 March 2017
  • Online: Elton, Elke, Tim, Richard, Zisis, Matt, Alex, Christina, Carl
    7 KB (1,115 words) - 16:51, 24 February 2017
  • Attendees: Elliott W, Simon T, Elton S, Alex S, Fernando B, Mark I, Dave D, Chris C, Jim S, Eugene C.
    3 KB (430 words) - 08:18, 15 April 2008
  • ...is C, Eugene C, Mark I, David L, Graham H, Ed J, Carl T, Vardan G, Elke A, Elton S, Hai D, Alex S, Jim S, Fernando B.
    3 KB (518 words) - 15:49, 30 May 2008
  • Online: Elton, Beni, Tim, Richard, Curtis, Zisis, Andrei, George, Christina, George V., P #* George and Elton will work together on the fiber specs to include the testing protocol.
    3 KB (498 words) - 16:58, 24 February 2017
  • #* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
    974 B (123 words) - 15:35, 30 April 2008
  • #* [[Private:Fiber Specs | Fiber Specifications]] (Elton) Participants: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George
    3 KB (385 words) - 17:12, 24 February 2017
  • Attendees: David L., Matt S., Elton S., Alex S., Elliott W., Simon T., Mark I., Beni Z.
    4 KB (540 words) - 09:19, 27 May 2008
  • #* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
    1 KB (159 words) - 17:11, 24 February 2017
  • ...W, David L, Beni Z, Alex S, Simon T, Carl T, Ben R, Mark I, Chris C, Ed J, Elton S, Vardan G. ...ge are labeled "PED deliverable." Much discussion about what this means. Elton told us these are not the same as R&D deliverables, which are carefully tra
    6 KB (941 words) - 12:48, 2 June 2008
  • Elton Smith, Jim Stewert, Mark Ito, David Lawrence, Simon Taylor and Dan Carmen.
    3 KB (423 words) - 07:50, 5 June 2008
  • Participants: Elton, Beni, Elke, Tim, Matt, Zisis, Andrei, George ...on (Matt will coordinate with Blake). Regina to summarize GlueX-doc-659. Elton has lost enthusiasm for Planacons (low gain, reliability, etc...).
    3 KB (451 words) - 22:32, 22 June 2008
  • ...dy: tradeoff between PDE and nose for mesh ones, and other simulations by Elton.
    2 KB (336 words) - 17:13, 24 February 2017
  • *** [[Elton Smith - The 12 GeV JLab Upgrade Project]], Proceedings [https://halldweb.jl
    42 KB (5,494 words) - 09:48, 23 April 2024
  • Participants: JLab: Fernando, Tim, Elke, Elton, Beni, Sasha; UofR: Zisis, Andrei; IU: Matt. #* Elton reviewed the draft document and results of light collection for various lig
    7 KB (1,029 words) - 17:13, 24 February 2017
  • ...M., Mark I., Simon T., Sebastien P., Beni Z., Elliott W., Elke A., Jim S., Elton S., Eugene C., Alex S.
    3 KB (416 words) - 11:13, 7 July 2008
  • Attendees: David L. (chair), Mark I., Alke A., Elton S., Simon T., Beni Z., Jim S., Alex S.
    3 KB (551 words) - 17:22, 22 July 2008
  • Attending: UofR: George, Zisis, IU: Matt, Mihajlo, JLab: Elton, Beni, Elke, Fernando; Athens: Christina #** Elton asked about the considerations for less granularity in the outer section.
    8 KB (1,223 words) - 12:38, 14 March 2017
  • ...avid L. (chair), Simon T., Beni Z., Elke A., Sascha S., Mark I., Herun Y., Elton S., Jim S., Eugene C.
    4 KB (649 words) - 12:38, 14 March 2017
  • ## Time-walk parameterization (Elton) ''Attendees: Elton, Simon, Mark, David (JLab), Curtis, Mike, Will (CMU), George (Athens), Sean
    8 KB (1,237 words) - 12:40, 14 March 2017
  • Present:Alex B., Alexandre D., David L., Curtis M., Matt S., Elton S., Alex. S.
    5 KB (771 words) - 12:38, 14 March 2017
  • Attendees: Fernando B, Jim S, Simon T, Elke A, Carl T, Chris C, Elton S, Herun Y, Mark I, Graham H, Ben R, Abhishek G, Beni Z, Elliott W.
    4 KB (641 words) - 14:13, 13 August 2008
  • and I also had a discussion with Elton and Simon and with Tim. I think
    19 KB (3,165 words) - 17:13, 24 February 2017
  • ....org/doc-private/DocDB/DisplayMeeting?sessionid=170 '''Tracking'''] Chair: Elton Smith
    13 KB (1,745 words) - 12:39, 14 March 2017
  • ...ens: Christina, George, Pavlos; UofR: Zisis, George, Kathryn, Blake; JLab: Elton, Beni, Tim, Fernando; IU: Matt, Mijahlo, Claire Tareert; FIU: Werner. ...lute light from the laser, but noise pick up from the laser was a problem. Elton indicated that a full shield was necessary to shield the laser. Method for
    6 KB (808 words) - 17:13, 24 February 2017
  • ....org/doc-private/DocDB/ShowDocument?docid=1083 Toy model for bcal timing] (Elton) #* Specifications for Lead procurement (Elton and George)
    8 KB (1,135 words) - 17:12, 24 February 2017
  • Attendees: David L.(chair), Elton S., Elliott W., Sascha S., Mark I., Herun Y., Simon T., Beni Z.
    3 KB (442 words) - 10:42, 18 August 2008
  • Attendees: Simon T, Herun Y, Elton S, Carl T, Beni Z, Alex S, Jim S, Fernando B, David L, Mark I, Ed J, Elke A
    4 KB (579 words) - 15:47, 25 August 2008
  • Attendees: Elliott W, Graham H, Simon T, Dave D, Elton S, David L, Mark I, Alex S, Dave A, Carl T, Vardan G, Beni Z, Jim S.
    2 KB (295 words) - 14:07, 10 September 2008
  • Attending: JLab: Elton, Elke, Tim, Beni; Santa Maria: Will at CERN; UofR: Zisis, Blake, Kathryn, S
    4 KB (621 words) - 14:23, 15 September 2008
  • Attending: JLab: Elton, Beni, Elke; Athens: Christina; UofR: Zisis, George, Andrei, Stamatis; Sant # Announcements (Elton and Elke)
    5 KB (762 words) - 17:15, 29 September 2008
  • Attending:JLab: Fernando, Beni, Elton, Elke, Tim; Santa Maria: Serguei; UofR: Zisis, Andrei, Stamatis, Blake, Geo ...the e-mail be converted to a wiki page for ease of updates and tracking. (Elton agreed, see [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| Outcome]]).
    5 KB (760 words) - 13:39, 24 October 2008
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=1196 BCAL Construction] --- Elton Smith
    7 KB (948 words) - 12:40, 14 March 2017
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=1245 Status of the MOUs] -- Elton Smith ...b.org/doc-private/DocDB/ShowDocument?docid=1247 Update on Bcal readout] -- Elton Smith
    8 KB (1,006 words) - 12:38, 14 March 2017
  • In attendance: Curtis M., Elton S., Elke A., Simon T., Beni Z., David L. # We will meet on Wednesday (Oct. 1) at 13:00 so Mark and Elton can present some results from work they have recently done.
    3 KB (503 words) - 10:12, 12 November 2008
  • * Jefferson Lab: Elke A., Mark I, David L., Elton S. and Beni Z. ...-1126 [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1126 Elton Smith]
    2 KB (366 words) - 17:13, 24 February 2017
  • Attendees: Elliott W, Simon T, Alex S, David L, Mark I, Elke A, Beni Z, Elton S, Ben R, Jim S, Herun Y, Ed J, Fernando B, Hai D, Chris C, Abhishek G, Var
    3 KB (439 words) - 16:09, 16 October 2008
  • * Update of CDC tracking studies (Elton)
    507 B (71 words) - 12:35, 6 October 2008
  • #* Elton Smith, Hall D scientist # <strike> Start construction MOU based on template </strike> (Elton and Elke).
    19 KB (3,007 words) - 17:13, 24 February 2017
  • ...ward_a_decision_for_Bcal_Readout | Add roadmap for Bcal Roadmap to wiki]] (Elton) ...s; IU: Matt, Claire, Brad (studying radiation on blocks); JLab: Beni, Tim, Elton, Elke; USM: Will
    9 KB (1,401 words) - 07:00, 28 October 2008
  • ...ward_a_decision_for_Bcal_Readout | Add roadmap for Bcal Roadmap to wiki]] (Elton)
    2 KB (244 words) - 17:12, 24 February 2017
  • ...ward_a_decision_for_Bcal_Readout | Add roadmap for Bcal Roadmap to wiki]] (Elton) ....jlab.org/elton/talks/Sadigov_talk-Beaune-05.pdf],[http://clasweb.jlab.org/elton/talks/CMS_APD_for_CLAS_1.pptx]
    6 KB (892 words) - 17:14, 24 February 2017
  • ...George, Andrei, Dan, Keith, Alberta - Gilbert, Jan, Richard, JLAB - Elke, Elton, Tim''
    6 KB (985 words) - 08:59, 4 December 2008
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=1130 Lead Specification] (Elton) ...ing: Athens: George Voulgaris, Christina; JLab: Tim, Fernando, Beni, Elke, Elton; FSU: Alex; UofR: Blake, Zisis, George, Andrei; IU: Matt (please add others
    5 KB (719 words) - 17:08, 24 February 2017
  • Attendees: Elliott W, Beni Z, Elton S, Fernando B, Elke A, Chris C, Carl T, Simon T, Dave A, Mark I, Dave D.
    3 KB (440 words) - 11:34, 17 December 2008
  • ## Kuraray Visit (Elton) Attending: JLab:Elton, Fernando, Tim; UofR: Andrei, Blake, George, Zisis; USM: Will; IU: Matt.
    5 KB (692 words) - 16:26, 22 December 2008
  • Attendees: Elliott W, Simon T, Chris C, Elton S, Jim S, Alex S, Dave L, Dave A, Carl T, Vardan G.
    3 KB (447 words) - 16:19, 8 January 2009
  • In attendance: Elliott W, Dave L, Beni Z, Chris C, Alex S, Elton S, Simon T, Jim S, Elke A, Graham H, Dave A, Vardan G, Carl T.
    2 KB (339 words) - 17:22, 21 January 2009
  • ## Magnetic Field Update (Elton) Attending: JLab: Beni, Elton, Fernando; UofR: Zisis, Blake, George, Andrei; IU: Claire, Ryan, Matt, Brad
    4 KB (576 words) - 17:14, 24 February 2017
  • David Lawrence, Elton Smith, Simon Taylor, Mark Ito, Tim Witlach, Beni
    4 KB (662 words) - 09:47, 20 January 2009
  • Attendees: David L. (chair), Elton S., Simon T., Mark I., Alex S. It was briefly discussed and then agreed to follow Elton's suggestion that the number schemes used for the individual detector syste
    3 KB (488 words) - 14:09, 11 February 2009
  • ...., Alexandre D., Alex B., Alex S., Dan S., Kei M., Franz K., Eugene C, and Elton S.
    1 KB (150 words) - 12:44, 9 November 2015
  • ..., Pedro, Edward, Manuel, Alam; UofR: George, Andrei, Kathryn, Zisis; JLab: Elton, Elke, Eugene, Fernando, Beni, Tim; IU: Matt, Mihajlo, John, Joe, Claire, R ...omments and feedback. Suggestions for tools for studying light collection. Elton, Matt and Zisis to send information regarding tools which have been used fo
    4 KB (557 words) - 17:04, 24 February 2017
  • ''Attendees: Alberta - Jim, Gilbert, Jan, Richard, JLAB - Elke, Elton, Tim, Regina - Zisis, George, Dan, Keith'' ...can, that supplied lead for the prototype modules, is one of the vendors. Elton and George have completed and signed the lead spec document. First article
    5 KB (818 words) - 16:44, 24 February 2017
  • ...Meeting] || Santa Fe, Oct. 28-31 || Alexander Barnes<br> Simon Taylor<br> Elton Smith<br> Will McGinley<br> Michael Staib || || ...S Topical Group on Hadron Physics (GHP)] || Denver, CO, 2013 Apr. 10-12 || Elton Smith || [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=21
    14 KB (1,602 words) - 17:13, 24 February 2017
  • # <strike>Elton, Matt and Zisis to send information regarding tools which have been used fo ''Attendees: Elton, Tim, Beni, Carl (JLab), Matt (Indiana), Hayk + 4 students (USM), Andrei, B
    5 KB (740 words) - 16:54, 24 February 2017
  • # Path to repository for GEANT3 routines (Elton): ...are stored under svn at svn ls https://halldsvn.jlab.org/repos/trunk/home/elton/geantguide The original code came from Blake (UofR) and modified to suit my
    8 KB (1,267 words) - 17:13, 24 February 2017
  • ...alldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1214 GlueX-doc-1214](Elton) ''Attendees: Elton, Tim, Beni, Eugene, Fernando (JLab), Ashot (), Matt, Claire, Ryan, Mijahlo
    5 KB (711 words) - 17:13, 24 February 2017
  • ...I, Chris C, Simon T, Jeff W, Eugene C, Beni Z, Fernando B, Alex S, Dave D, Elton S, Dave A.
    3 KB (508 words) - 17:14, 24 February 2017
  • ##* Elton proposed to use Delta T < 0.1 degC as a goal for a cooling and/or temp stab
    4 KB (680 words) - 09:48, 1 April 2009

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)