Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

  • 1.) dial:
    3 KB (474 words) - 17:13, 24 February 2017
  • Tuesday, December 1, 2015<br>
    2 KB (371 words) - 17:13, 2 December 2015
  • The meeting will be at 1:00pm in Cebaf Center F326. 1.) dial:
    4 KB (649 words) - 12:38, 14 March 2017
  • 2 KB (366 words) - 17:13, 24 February 2017
  • Next Meeting: January 15, 2009 @ 1:30 p.m.
    7 KB (1,169 words) - 17:12, 24 February 2017
  • Next Meeting: February 5, 2009 @ 1:30 p.m. 1 month. Roger is aware of this and will start on the board redesign
    9 KB (1,429 words) - 17:13, 24 February 2017
  • == Sweep Magnet #1 (primary sweeping magnet collimator cave) == Image:PDV2.JPG|end view 1
    1 KB (207 words) - 12:38, 14 March 2017
  • Friday, May 1, 2009<br>
    1 KB (182 words) - 12:39, 14 March 2017
  • 0 B (0 words) - 13:19, 9 December 2011
  • ##* Newer version of subversion: 1.4 vs. 1.1 on the old server ...sion server. It will be a new virtual machine running subversion 1.4 vs. 1.1 on the old server. The new version will allow locking of tagged releases: i
    8 KB (1,188 words) - 21:54, 31 March 2015
  • - Plans for Phase 1 and Phase 2 soldering: The Phase 1 soldering will be
    11 KB (1,872 words) - 17:13, 24 February 2017
  • the Phase 1 board stuffing. Kim will be following up on this. We are
    8 KB (1,282 words) - 17:13, 24 February 2017
  • 7 KB (1,164 words) - 17:13, 24 February 2017
  • 4 KB (645 words) - 18:26, 29 January 2016
  • 2 KB (402 words) - 18:28, 14 January 2016
  • April 1, 2010 FDC meeting boards to the film. Need one good trained person to do this job. 1.3cm hole in
    3 KB (377 words) - 17:13, 24 February 2017
  • Wednesday, December 1, 2010<br> 1:30 pm EST<br>
    5 KB (785 words) - 23:31, 31 March 2015
  • Tuesday, June 1, 2010<br> # [[GlueX Offline Meeting, June 1, 2010#News from IU|News from IU]]
    8 KB (1,316 words) - 16:44, 24 February 2017
  • Friday, October 1, 2010<br> ...000 V of 124 ps. All resolutions quoted are for (t<sub>2</sub>&minus;t<sub>1</sub>)/2.
    3 KB (409 words) - 04:56, 1 April 2015
  • Friday, April 1, 2011<br>
    2 KB (285 words) - 17:07, 24 February 2017
  • Wednesday, June 1, 2011<br> 1:30 pm EDT<br>
    6 KB (1,003 words) - 17:23, 31 March 2015
  • Thursday, September 1, 2011<br>
    2 KB (260 words) - 17:02, 24 February 2017
  • ** +1-866-740-1260 : US and Canada ** +1-303-248-0285 : International
    5 KB (754 words) - 17:12, 24 February 2017
  • 438 B (47 words) - 17:10, 30 November 2011
  • 9:30 AM Thurs 1-Dec-2011 CC L207 Thurs 1-Dec-2011 9:30am CC L207
    4 KB (604 words) - 07:12, 1 April 2015
  • Thursday, December 1, 2011
    884 B (124 words) - 04:56, 1 April 2015
  • [[Level 1 Group Members]] === Level 1 Trigger Goal ===
    4 KB (510 words) - 17:24, 30 July 2018
  • Wednesday February 1, 2012 at 11:00am ## Simon reported that currently about 1/2 of the reconstruction time is spent in the vertex section of the code---D
    6 KB (985 words) - 17:13, 24 February 2017
  • ...nstallation. Next cell (for third package): wire frame was laminated, type-1 cathode ready, working on the flaps for the type-2 cathode. For the nex wir ...mp is supposed to operate at ~100psi. The coolant (Fluorinert) is heavier (1.73g/cm^3) than watter.
    4 KB (754 words) - 19:30, 5 January 2012
  • ...on the third. First wire frame strung today, two end windows and one type-1 cathodes ready, working on two type-3 cathodes and started type-2. Dark cur
    4 KB (699 words) - 18:19, 12 January 2012
  • ...he wires. Could be also some garbage on the pulley or on the rod. One type-1 cathode is ready, two type-3 waiting for the daughter cards to be glued. Wi ...or the wires, and two cable types for the cathodes with 4 connectors: type-1 6 inches apart and type-2 5-8.5-4 inches distance between
    4 KB (651 words) - 17:51, 19 January 2012
  • 1:30 PM Wed 1-Feb-2012 CC F326 1:30 PM Wed 29-Feb-2012 CC F326 ('''Feb 29!''')
    5 KB (719 words) - 06:20, 1 April 2015
  • ...stringing, wire board #23 was laminated. Cathodes: the two type-3 two tyoe-1 and one type-2 ready. ...ber: you can apply the minimal threshold of 500nA and even if it trips at 1-2uA it is safe. There are CAEN modules (A1550) with the same connector conf
    5 KB (817 words) - 19:59, 26 January 2012
  • 3 KB (444 words) - 18:44, 1 March 2012
  • Thursday, March 1, 2012<br> * Tim proposed lengthening the long scintillators by 1 cm, so that the edges protrude another 0.5 cm. This is to make the clamp sh
    3 KB (530 words) - 17:13, 24 February 2017
  • March 1, 2012 FDC meeting ...air the oxygen in the chamber will be 10^4 cm^3. At 200 cm^3/min flow and 1% oxygen in the exhaust will have 2 cm^3/min oxygen. so it will take ~100 ho
    4 KB (660 words) - 17:22, 31 March 2015
  • ** +1-866-740-1260 : US and Canada ** +1-303-248-0285 : International
    4 KB (661 words) - 18:02, 31 March 2015
  • Friday June 1, 2012 at 8:15am
    1 KB (174 words) - 07:47, 1 June 2012
  • * +1-866-740-1260 : US+Canada * +1-303-248-0285 : International
    408 B (51 words) - 09:50, 1 June 2012
  • ** Dial: 1 888 240 2560 (US or Canada only)
    1 KB (163 words) - 17:04, 31 January 2016
  • Wednesday August 1, 2012 at 11:00am
    638 B (84 words) - 10:14, 1 August 2012
  • 1:30 PM Wed 1-Aug-2012 CC F326 1:30 PM Wed 15-Aug-2012 CC F326
    4 KB (624 words) - 05:48, 1 April 2015
  • 548 B (68 words) - 14:20, 5 August 2012
  • 3 KB (527 words) - 10:15, 2 November 2012
  • Thursday, November 1, 2012<br>
    786 B (102 words) - 06:26, 1 April 2015
  • November 1, 2012 FDC meeting ...ded to take it from JLab and use it at Blue Crab to start testing package #1. We expect to have Ar bottle soon, to be used at JLab.
    3 KB (582 words) - 02:07, 1 April 2015
  • 1 KB (154 words) - 13:48, 5 November 2012
  • ...e bottom of the second package) and it can't be done now. If needed (still 1% of the sensitive area) can be done during the summer. CDC has not been tur
    4 KB (640 words) - 18:23, 8 January 2016
  • ...challenge/01/conditions/data_challenge_1.html Condition for Data Challenge 1] *:* 3.1 billion good events produced
    814 B (98 words) - 11:35, 31 March 2015
  • 2 KB (281 words) - 15:08, 18 December 2012
  • - Picture done before Christmas of the the packages #4,1,3 (front to back) is linked above. Now we have also the colling loops insta ...t for the corrosion problem''' to appear when using EPDM+Viton: '''2.6 (-1.1/+2.4) years'''.
    5 KB (918 words) - 02:09, 1 April 2015
  • ...the second (last production) package are ready. Redundant components: type-1 cathode #71 ready, working on three more cathodes. Starting next week Tina ...es we anticipated having 7 of them, three of which with high dark current ~1 uA but stable, that probably can be fixed. Eugene agreed to build 6 spare c
    5 KB (800 words) - 17:39, 30 January 2013
  • ...o gas leakage was found. Changing the manifold to the one used in package #1 didn't affect the pressure. ...ugh cathode frames except that one has to be converted from type 2 to type 1, i.e. milling the O-ring groove. Dave: we will need also two spacer rings a
    6 KB (972 words) - 04:15, 1 April 2015
  • ...now with 2150V/-500V and one HV channel tripped (C3HV4). The current was ~1.7 uA but went down to ~0.7uA on this channel and is stable. - The plans is to finish with the testing of package #4 and bring package #1 to EEl126 on Monday.
    5 KB (876 words) - 19:44, 31 March 2015
  • 2 KB (244 words) - 11:22, 8 February 2013
  • 44 B (3 words) - 10:44, 15 February 2013
  • Friday, March 1, 2013 at 1:30 PM
    3 KB (474 words) - 17:12, 24 February 2017
  • Friday March 1,2013 at 8:15am * Solenoid power up - #1 priority - expected date - Mar 8, 2013
    867 B (120 words) - 09:00, 1 March 2013
  • 93 B (17 words) - 12:29, 1 March 2013
  • Wednesday, May 1, 2013<br> 1:30 pm EDT<br>
    4 KB (600 words) - 15:57, 31 March 2015
  • practically pull of something like a 1% absolute rate measurement for muon pairs.
    2 KB (392 words) - 08:16, 2 May 2013
  • 4 KB (632 words) - 16:39, 9 May 2013
  • Thursday, August 1, 2013<br> * Gain balancing procedure implemented in code and tested. takes 1/2 hour for 5000 events and is repeated about 6 -7 times at different HV set
    2 KB (273 words) - 01:06, 1 April 2015
  • 2 KB (272 words) - 12:59, 1 October 2013
  • #* Dial: 1 888 240 2560 (US or Canada only)
    2 KB (234 words) - 16:15, 30 November 2015
  • Friday November 1, 2013 at 1:30pm # ) SeeVogh: A conference has been booked under "GlueX PID Upgrade" from 1:00pm until 3:00pm (EDT).
    497 B (72 words) - 04:46, 31 October 2013
  • Friday November 1, 2013. * +1-866-740-1260 : US+Canada
    4 KB (568 words) - 17:13, 24 February 2017
  • ...We saw signals from all the HV sectors. Two of the HV channels in package 1(C1+HV3 and C4+HV2) were tripping every several hours (at +1600V). Another f
    3 KB (554 words) - 23:59, 31 March 2015
  • 4 KB (734 words) - 23:41, 31 March 2015
  • ...Bull this means we have ~0.5 GPM water flow, while it is recommended to be 1.3 GPM to have smaller temperature difference. Bill is looking for a flow me
    7 KB (1,144 words) - 01:06, 1 April 2015
  • ...l Tuesday (1/21). One HV channel has a current oscillating between 0.5 and 1 uA, indicating some small discharging every 10-15 min, but never trips. On
    5 KB (941 words) - 00:08, 1 April 2015
  • 6 KB (1,024 words) - 21:45, 31 March 2015
  • 139 B (24 words) - 10:36, 14 March 2014
  • 9:30AM Thurs 1-May-2014 CC A110
    617 B (78 words) - 09:36, 1 May 2014
  • May 1, 2014 FDC+CDC meeting
    4 KB (686 words) - 06:05, 1 April 2015
  • Thursday, May 1, 2014<br> *# Dial-in: +1 408 740 7256 or +1 888 240 2560 (US or Canada only) ([http://bluejeans.com/numbers other phone
    3 KB (477 words) - 06:26, 1 April 2015
  • Friday August 1, 2014 at 8:15am
    794 B (121 words) - 17:54, 31 March 2015
  • Friday, August 1, 2014<br> 1.30 pm, EDT<br>
    753 B (101 words) - 10:27, 31 March 2015
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    3 KB (490 words) - 17:02, 24 February 2017
  • ** Dial: 1 888 240 2560 (US or Canada only)
    2 KB (340 words) - 14:01, 31 March 2015
  • The meeting will be on Monday December 1, 2014 at 11:30am EDT. #* US or Canada: +1 408 740 7256 or
    1 KB (188 words) - 17:13, 24 February 2017
  • 5 KB (786 words) - 00:26, 1 April 2015
  • 18 B (1 word) - 10:28, 12 January 2015
  • ...timate!!! From the vapor pressure estimations we get the same order of 0.5-1% alcohol. Since the pressure in the alcohol bubbler varies between 7-12psi - Lubomir simulated with Garfield the effect of adding 1% propanol to the standard gas of 40/60 Ar/CO2. From the attached plots one
    4 KB (652 words) - 06:05, 1 April 2015
  • ...bubbler. If roughly estimate the alcohol consumptions it must be closer to 1%. ...are statistically very similar. The channels with correction coefficients >1 (assumed to be "bad") show some differences (up to 50%) when using the two
    4 KB (700 words) - 17:22, 31 March 2015
  • ...Garfield describes very well the measurements, except in the region of 0.5-1.5 mm which can't be fixed by changing only the AR/CO2 ratio, i.e. the alcoh
    7 KB (1,100 words) - 03:38, 1 April 2015
  • Wednesday, April 1, 2015<br> 1:30 pm EDT<br>
    5 KB (796 words) - 19:35, 2 April 2015
  • #REDIRECT [[GlueX Offline Meeting, April 1, 2015]]
    50 B (5 words) - 10:59, 1 April 2015
  • Friday, May 1, 2015<br> 1.30 pm, EDT<br>
    4 KB (620 words) - 18:46, 7 May 2015
  • Wednesday, July 1, 2015<br> #* Dial: 1 888 240 2560 (US or Canada only)
    8 KB (1,280 words) - 17:34, 14 July 2015
  • '''Time:''' 1:30pm-2:30pm #* US or Canada: +1 408 740 7256 or
    5 KB (794 words) - 15:15, 1 July 2015
  • 333 B (59 words) - 09:24, 1 July 2015
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    2 KB (349 words) - 17:13, 24 February 2017
  • #* Dial: 1 888 240 2560 (US or Canada only) # [[Media:Michael Roberts - Presentation 10-1-15.pdf]] Gas Gain (Michael)
    2 KB (250 words) - 15:49, 1 October 2015
  • Thursday, October 1, 2015<br>
    2 KB (231 words) - 12:38, 14 March 2017
  • October 1, 2015 Drift Chamber meeting
    3 KB (490 words) - 16:53, 24 February 2017
  • Wednesday, June 1, 2016<br> #* Dial: 1 888 240 2560 (US or Canada only)
    5 KB (751 words) - 17:13, 24 February 2017
  • '''Room:''' '''<font size="+1">CC F326</font>''' #* US or Canada: +1 408 740 7256 or
    5 KB (852 words) - 17:09, 1 June 2016
  • #* Dial: 1 888 240 2560 (US or Canada only) ** Using long threaded rod with thread pitch that is multiple of 1/10"
    4 KB (627 words) - 19:32, 5 July 2016
  • Friday, July 1, 2016<br> 1 pm, EDT<br>
    1,009 B (141 words) - 12:59, 1 July 2016

Page text matches

  • *[[Level-1 Trigger]] <td width=150 bgcolor="#e0e0f0"><font size="+1">[[Meetings]]</font></td>
    10 KB (1,470 words) - 16:57, 28 March 2024
  • * K<sub>L</sub> [https://www.jlab.org/conferences/kl2016/ Workshop] February 1-3, 2016. mini-Proceedings [https://arxiv.org/pdf/1604.02141v1.pdf].
    10 KB (1,163 words) - 10:53, 18 April 2024
  • * <b>Talk 1</b>GlueX-doc-1003 [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument
    4 KB (510 words) - 14:52, 18 August 2023
  • [[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=528&version=1 GlueX Note 528]] . 1.0GeV pi+ particles isotropically in hdgeant and fitting the resulting track
    4 KB (738 words) - 17:13, 24 February 2017
  • ...ched). I've also overlaid the beam spot size in z for both the 2.6 mm and 1.0 mm collimator. I calculate this as (spot size) / ( sqrt(12) * sin( theta spot diameter = 1.9 cm
    5 KB (863 words) - 17:14, 24 February 2017
  • ...Doc 4294]][[https://inspirehep.net/literature?sort=mostrecent&size=25&page=1&q=refersto%3Arecid%3A1798503 Citations]].
    2 KB (295 words) - 08:31, 21 August 2023
  • ...s set to "0", then every trigger is accepted. When the prescale is set to "1", then every other trigger is read. When the prescale is set to "2", then e Slot 0 Slot 1 Slot 2 Slot 3 Slot 4
    16 KB (2,552 words) - 15:46, 1 October 2015
  • ...linearity over the range of photon energies from 137 to 653 MeV (see Table 1). ...0) of 1.5 cm. Each layer of the module to be tested has 96 SciFi's spaced 1.38 mm apart (center-to-center) and the layers are such that they do not pre
    40 KB (6,903 words) - 11:09, 31 March 2015
  • 2334 Sep24 15:07 -1.2cm (nominal center), trigger bit 4. 2335 Sep24 17:33 1.0 Z=-97.8cm (beam closer to South end),
    10 KB (1,209 words) - 06:05, 1 April 2015
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    6 KB (925 words) - 14:54, 19 November 2015
  • ...solution (along wires) ~120 microns; wire resolution ~110 microns (between 1 and 4.5 mm from the wire). ...sure the FDC preamp+cable response function (last plot). The gain is about 1.8mV/fC. When compared with the fADC amplitude it saturates in a different w
    4 KB (617 words) - 19:28, 19 November 2015
  • January 2023 [[Tracking-1-5-2023|(5)]] [[Tracking-1-19-2023|(19)]] September 2022 [[Tracking-9-1-2022|(1)]] [[Tracking-9-15-2022|(15)]]
    16 KB (1,785 words) - 16:56, 15 April 2023
  • * [[GlueX Software Meeting, September 1, 2020 | September 1, 2020]] * [[GlueX Offline Meeting, June 1, 2018|June 1, 2018]]
    21 KB (1,819 words) - 10:07, 3 May 2024
  • D. Lawrence 1/18/07 Finished Converting to Wiki <br> M. Ito 1/5/10 Added HDDS to list of 3rd party software <br>
    22 KB (3,180 words) - 07:16, 30 September 2014
  • * [[March 1, 2023 Calorimeter]] 11:00 am ET * [[February 1, 2023 Calorimeter]] 11:00 am ET
    17 KB (1,332 words) - 12:57, 23 April 2024
  • *[[2022-12-01| December 1]] *[[2021-07-01 | July 1]]
    4 KB (435 words) - 11:27, 1 May 2024
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    2 KB (249 words) - 10:51, 31 March 2015
  • ...495, also as GlueX-doc-239. It looks reasonable to extend this sum from n=1,36 for all readouts in the beam test. Beam spot also plays a role here. ...= \frac{a}{\sqrt{E}} \oplus b</math>, with a being around 5% and b around 1%, consistent among the three analyses, and independent of incident angle. C
    5 KB (723 words) - 10:41, 31 March 2015
  • * [[Media:TAGGER_INTERFACE_DWG_SHT_1.pdf | Tagger interface drawing sheet 1]] * [[Image:Glue X Coil -1 Leak Check.xls.pdf | Leak test of Solenoid Coil #1]]
    997 B (137 words) - 07:21, 5 June 2020
  • <tr><td bgcolor="#e0e0f0">[[Sweep Magnet 1|Sweep Magnet 1]]</td></tr>
    3 KB (477 words) - 10:35, 24 March 2022
  • ...tio of 80:1</u>. The electronic noise on the signal was on the level of 0.1&nbsp;pA. The signal disappeared immediately during beam interruptions, so ...y in Hall B during the current test run at 10&nbsp;nA corresponds to about 1% of the nominal GlueX operating intensity. If the Hall B beam spot on the
    6 KB (1,048 words) - 12:38, 14 March 2017
  • [[Image:Fcal_cw_test-1.jpg|400px|Production Cockroft-Walton Bases]]
    344 B (51 words) - 09:40, 3 July 2012
  • 1:30 PM Wed 27-Apr-2011 CC F326 1:30 PM Wed 25-May-2011 CC F326
    5 KB (852 words) - 17:54, 31 March 2015
  • ...'s measurements. The ratio is approximately 2. Therefore, the expected PDE@1.2V for the C20 is about 8.5/2 = 4.2. Carl measured it to be 4.4 &plusmn; 0. '''Conclusion:''' At the operating point of about 1.2 V above breakdown, the PDE for the C20 (1mm2, 17% fill factor) SiPM is ab
    4 KB (617 words) - 12:39, 14 March 2017
  • 1.) dial:
    3 KB (474 words) - 17:13, 24 February 2017
  • ...s://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=819 BCAL Module 1 Specs]
    4 KB (536 words) - 12:39, 14 March 2017
  • ...ee ticks used by single factory.</s><ref>This changed appeared in jana 0.6.1</ref> ...w 3rd parties to build using it.</s><ref>This changed appeared in jana 0.6.1</ref>
    17 KB (2,874 words) - 21:04, 29 November 2019
  • ...nergy resolution|Regina stand-alone BCal Monte Carlo simulation]] (ReSAM) [1],
    2 KB (360 words) - 17:00, 24 February 2017
  • # Review minutes from [[May 1, 2007 Software]] meeting 1.) dial:
    4 KB (725 words) - 17:13, 24 February 2017
  • * [[Level-1 Trigger]]
    4 KB (507 words) - 13:09, 8 July 2021
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    3 KB (426 words) - 17:13, 24 February 2017
  • * [[OWG Meeting 1-Jun-2016 | 1-Jun-2016]] * [[OWG Meeting 1-Jul-2015 | 1-Ju1-2015]]
    8 KB (746 words) - 09:18, 5 March 2018
  • ...dered for reducing the amount of material seen by forward-going particles [1,2]. These ideas have recently coalesced into one concrete proposal from th [[Image:radlen-img.gif|thumb|right|Figure 1: Cut view through the axis of the GlueX detector, showing the downstream en
    5 KB (708 words) - 12:40, 14 March 2017
  • May 29, 2007, Calorimetry meeting, 1:00 PM EDT [[Image:ReSAM samfrac 1.gif|thumb|100px|left|'Low Energy MC SF Resolution']]
    4 KB (640 words) - 17:12, 24 February 2017
  • * [[PID Day 1 Notes]]
    6 KB (746 words) - 12:40, 14 March 2017
  • ...parallel to the floor). The counters were 10cm wide and ~40 cm long, and ~1/4" thick. Unfortunately we did not take and pictures of the setup. The
    2 KB (299 words) - 11:33, 31 March 2015
  • The default step size set for materials when AUTO is off is 1 cm. This default is assigned in the hdds-geant TRIG 1
    9 KB (1,354 words) - 13:55, 13 November 2012
  • ...note2.pdf Gluex-doc-827-v3]: sampling fraction fluctuations from 10 MeV to 1 GeV (See Fig. 12 and 13)
    857 B (110 words) - 12:38, 14 March 2017
  • Note that allotted times are very generous. ''Speakers should plan on using 1/2 of the time for a presentation. The remainder can be used for additional ** 12:30 - 1:30: Lunch
    3 KB (335 words) - 12:40, 14 March 2017
  • 1.) dial: ...population of the phase space in the region of &theta;=1<sup>o</sup> and p=1 GeV/c.
    3 KB (443 words) - 12:40, 14 March 2017
  • #** US or Canada: +1 408 740 7256 or #** US or Canada: +1 888 240 2560
    3 KB (435 words) - 06:50, 19 January 2022
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    8 KB (1,292 words) - 16:48, 24 February 2017
  • === [[GlueX Offline Meeting, June 1, 2010|June 1, 2010]] === === [[GlueX Offline Meeting, December 1, 2009|December 1, 2009]] ===
    2 KB (295 words) - 17:51, 29 November 2019
  • 1.) dial:
    6 KB (888 words) - 12:38, 14 March 2017
  • 1.) dial:
    680 B (87 words) - 12:38, 14 March 2017
  • ...ontrol the magnet deformation within limit when the magnet is operating at 1.5 T? **## Yang: Gap will be reduced at 1.8T relative to the 1.5 T operation. Can the gap change be accomodated in the design? Sergei: Pol
    12 KB (2,033 words) - 17:13, 24 February 2017
  • 1.) dial:
    1 KB (136 words) - 12:40, 14 March 2017
  • *# Dec. 7th-8th Electron/Photon beam restoration (1 days) ...ted time: typically, we will do trigger study and take trigger data during 1.5 shift (the second half of the swing shift and during owl shift).
    14 KB (2,187 words) - 16:28, 26 November 2018
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    5 KB (708 words) - 12:38, 14 March 2017
  • ** Dec 1: for Hall D engineering to develop this concept. This will include the conc ** Dec 1: To provide a concept for matching the light guides (LGs) to the trapezoida
    6 KB (894 words) - 12:38, 14 March 2017
  • {| border="1" cellpadding="2" {| border="1" cellpadding="2"
    9 KB (1,235 words) - 12:39, 14 March 2017
  • *[[Tracking-1-19-2023| Jan 5]] *[[Tracking-1-19-2023| Jan 19]]
    15 KB (1,677 words) - 16:13, 30 March 2023
  • ...of December 3. Other arrays and improvements will be tested next. Phase-1 closure report is aimed for before Xmas. The current arrays will not allow
    4 KB (586 words) - 17:12, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (570 words) - 17:00, 24 February 2017
  • ...of December 3. Other arrays and improvements will be tested next. Phase-1 closure report is aimed for before Xmas. The current arrays will not allow
    4 KB (512 words) - 17:14, 24 February 2017
  • 1.) dial:
    957 B (122 words) - 12:38, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (699 words) - 17:05, 24 February 2017
  • 1.) ESNET: 8242553 +1-800-377-8846 : US
    2 KB (333 words) - 17:12, 24 February 2017
  • 1) dial:<br> +1-800-377-8846 : US<BR>
    4 KB (638 words) - 12:39, 14 March 2017
  • ** 1:15 Status of simulation (25) --- Richard ** 1:45 Offline Sofware Status (15) --- David L.
    4 KB (618 words) - 17:00, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (603 words) - 17:00, 24 February 2017
  • * 1:00 Data Format & Rates - Ed, Gerard, David Abbott, Elliott * '''1:50 Break'''
    933 B (107 words) - 17:05, 24 February 2017
  • ...ia:Counter_table_2017(b).xlsx|Refined hodoscope counter positions, updated 1/2017]] - Dan Sober ...dia:Counterbounds2017(b).xlsx|Updated hodoscope energy bin bounds, updated 1/2017]] - Dan Sober
    3 KB (433 words) - 21:36, 5 February 2020
  • ...%20OD.pdf|Tagger engineering drawing D000000202-1006-A TUBE ASSY 2.75 CF X 1.25 TUBE OD.pdf]] ..._interfaceD00000-19-00-3001_SHT1.pdf Tagger magnet critical interfaces sht 1], Feb. 23, 2009.
    3 KB (465 words) - 14:44, 23 March 2016
  • * [[collimatorMtgs-1-14-2013|January 14, 2013]] [[file:active_collimator_installed_5mm_hole.jpg|photo 1 of active collimator installed in the 5mm collimator position]]
    6 KB (981 words) - 15:28, 21 July 2020
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    1 KB (148 words) - 12:39, 14 March 2017
  • # choice of photon energy in the range 6 - 12 GeV [1] # duty factor >90% at 500 MHz beam pulse repetition rate [1]
    3 KB (379 words) - 11:38, 8 February 2013
  • <br/>Figure 1. CAD model of the Newport crystal goniometer</td>
    2 KB (238 words) - 11:22, 15 March 2016
  • ...ustbunny.physics.indiana.edu/~dzierba/CDR_Calorimeter/dzierba_cal_rev Talk 1] 8:00 am Alex
    4 KB (522 words) - 12:38, 14 March 2017
  • ...wing proposal from our collaborators at CHESS was discussed at our meeting 1/17/2008. # What minimum size is required? <br><font color="blue"> I would say around 1 mm. Bigger samples (3 to 5 mm) are more convenient to work with.</font>
    3 KB (426 words) - 10:44, 29 November 2011
  • ...irements of the GlueX experiment outlined in the Conceptual Design Report [1] and the expected capabilities of the 12 GeV CEBAF accelerator, as estimate ...nswer to need 1. The essential results from [2] are shown below in Tables 1 and 2. In answer to need 2, the CASA group has developed a set of ''Expect
    9 KB (1,420 words) - 12:38, 14 March 2017
  • ::: - production (1 - 2 night shifts) ::: - production at low luminosity with the FDC switched on (1 - 2 night shifts for both the FDC alignmnent and FCAL MIP triggers)
    2 KB (245 words) - 11:00, 14 December 2015
  • Tuesday, December 1, 2015<br>
    2 KB (371 words) - 17:13, 2 December 2015
  • ....e. the microscope covers the energy range 8.1&lt;E<sub>&gamma;</sub>&lt;9.1 GeV. ...idths were calculated such that the typical rate per counter is limited to 1-4 MHz at 10<sup>8</sup> &gamma;/sec on target.
    3 KB (397 words) - 21:00, 25 January 2017
  • 1.) dial:
    856 B (109 words) - 12:40, 14 March 2017
  • ...he level required to maintain the polarization at the coherent peak within 1% of its value at nominal alignment while running at beam currents ''I<sub>e ...el required to maintain the tagging efficiency at the coherent peak within 1% of its value at nominal alignment while running at ''I<sub>e</sub>'' > 100
    6 KB (960 words) - 18:02, 27 May 2015
  • {| border=1 ...tion by weigth (Web) || align=center | 55% PbO, 38% SiO2, 5% K2O, 1% Na2O
    2 KB (346 words) - 13:59, 9 February 2018
  • ...), pi2(1670), pi1(1600)] [[http://www.jlab.org/Hall-D/software/wiki/images/1/1d/Multi-res_plots.pdf pdf file]] 1.) dial:
    8 KB (1,388 words) - 12:38, 14 March 2017
  • ...[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1003 Talk 1] 10:00 am Curtis ##* Talk 15 1:00pm Eugene
    5 KB (628 words) - 17:13, 24 February 2017
  • ...unter_mounted_to_the_liquid_H2_target_assembly.png|thumb|upright=1.0| Fig. 1: The GlueX Start Counter mounted to the liquid H2 target assembly<ref name=
    3 KB (374 words) - 11:39, 13 September 2023
  • 1. Design, procure and commission all the electronics instrumentation by work > '''ASIC''' - GAS-1 Description, Tests, Status & Plans [https://halldweb.jlab.org/doc-private/D
    10 KB (1,242 words) - 10:59, 20 December 2019
  • Current planning is for a 1 1/2 day meeting the week of 7-May, with no parallel sessions. This will be a ** Dial +1-800-377-8846 : US
    7 KB (978 words) - 12:39, 14 March 2017
  • * The meeting will be held at 1:00 pm ET (11:00 am MST) ** +1-800-377-8846 : US
    4 KB (550 words) - 17:13, 24 February 2017
  • * The meeting will be held at 1:00 pm ET (11:00 am MST) ** +1-800-377-8846 : US
    4 KB (625 words) - 16:51, 24 February 2017
  • * Seems like one day is too short, likely will go with a 1 1/2 day review. ...halldweb.jlab.org/DocDB/0010/001017/001/HallD_Level_1_OverviewV2.pdf level 1 trigger] and send him comments.
    4 KB (632 words) - 12:40, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    7 KB (1,115 words) - 16:51, 24 February 2017
  • See Dave Doughty's note on the Level 1 trigger design on the GlueX DocDB: [https://halldweb.jlab.org/DocDB/0010/00
    2 KB (254 words) - 12:40, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    3 KB (498 words) - 16:58, 24 February 2017
  • JANA (>=0.4.1) comes with a command-line utility called ''jgeomread'' that can used ...into multiple values using a delimiter (''e.g. for attributes like X_Y_Z="1 2 3"'')
    15 KB (2,369 words) - 08:50, 5 June 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    3 KB (385 words) - 17:12, 24 February 2017
  • [[Image:scale_em_rate.jpg|thumb|right|Fig. 1. Scale factor for the EM background rate as function of the ...threshold of generated bremsstrahlung photons. The scale factor equals to 1 at E_gamma = 0.12 GeV,
    6 KB (956 words) - 14:47, 14 April 2022
  • ...[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1043 Level 1 Trigger Simulation] ...m_Review_May08/Final_Talks/W7-HallD%20System%20&%20Infrastructure%20Review-1.ppt Electronics]
    3 KB (472 words) - 12:40, 14 March 2017
  • * [[Software and Computing Review 7]] (Feb 1,2) * [[Experimental Readiness Review]] JLab, July 1-2, 2014
    4 KB (465 words) - 12:27, 3 January 2024
  • - Discussing without Bill the protective covers: aluminum 1/8" thick. Eugene asked why they are so thick so we can't use iron source. L
    4 KB (603 words) - 16:15, 2 November 2011
  • ...MeV (new value). The immediate demand is to satisfy the requirement of 0.1% absolute energy calibration for the Primex experiment. More generally, it ...on absolute polarization determination''' - changed from 2% (old value) to 1% (new value). The 2% value was based on having only the spectral shape ana
    9 KB (1,425 words) - 12:39, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    1 KB (159 words) - 17:11, 24 February 2017
  • Next Meeting: June 5, 2008 @ 1:30 p.m. - IUCF provided a report of the results of the Phase 1 wire winding.
    15 KB (2,462 words) - 17:13, 24 February 2017
  • * Z = -1 cm, 0 cm, 1 cm, (3 cm) * Y = -1 cm, 0 cm, 1 cm, (3 cm)
    1 KB (235 words) - 04:25, 1 April 2015
  • ** Area of the output of the WC (1.2 cm2) reduces the readout by 4cm2/1.2cm2 = 3.3. inner 111.6 cm2 24 SiPM (circle) 1.13cm2 27.1 cm2 0.24
    4 KB (565 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    2 KB (336 words) - 17:13, 24 February 2017

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)