Search results

From GlueXWiki
Jump to: navigation, search
  • #*Design: Eric's May 3<sup>rd</sup> note was discussed and Regina approved the design (the
    2 KB (254 words) - 11:45, 19 May 2006
  • ''Attendees'': Alex Dzierba, Paul S., Matt, Eric S. (Indiana), David L., Elliott (JLab), George, Mauricio, Zisis (Regina)
    4 KB (752 words) - 22:43, 23 May 2006
  • ''Attendees'': Alex, Chris, Eric (Indiana), David L., Elliott, Elton (JLab), Curtis (CMU), George, Rafael, Z ...ight guides (LGs): they were 4cm whereas IU thought they'd be 1.5 inches. Eric will check all tolerances and make sure all is ok. Pictures of the cart w
    7 KB (1,214 words) - 16:57, 6 July 2006
  • <tr><td>Eric Scott</td><td>Mechanical</td><td>June 12-16</td><td>Matt Shephard</td></tr>
    763 B (124 words) - 10:28, 21 July 2006
  • * ''Tentative dates for IU personnel:'' Eric (Aug. 20 - Aug.27)
    6 KB (1,040 words) - 21:11, 23 August 2006
  • ...e Kashy we need one day to uncrate, prepare, and then rig into the alcove (Eric). Then we will set up to take cosmics for at least two weeks (Zisis). - H-B will arrange for surveying marks on floor and wall (Dave). Eric will verify this is acceptable.
    3 KB (536 words) - 08:51, 11 July 2006
  • ''Attendees'': Matt, Eric (Indiana), David L., Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, ...ds re craning, alignment, surveying to the engineers as soon as possible. Eric will review the issue of extending the plate into the alcove for a smoooth
    6 KB (970 words) - 09:25, 11 July 2006
  • ...crane, etc, esp. requests for H-B technician time (Elliott with help from Eric,Zisis) - equipment will arrive at JLab towards the end of Aug (Zisis, Eric)
    3 KB (503 words) - 08:26, 11 July 2006
  • ''Attendees'': Matt (Cornell), Eric (Indiana), David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zis ...o machine parts for the cart. The rest of the work continues at Indiana. Eric is working on a design for the underlying plate, to allow the cart and leg
    3 KB (464 words) - 15:44, 12 July 2006
  • Report on meeting between Elliott, Eric, Dave Kashy, and Doug Tilles: ...(Dave). There should be no interference between it and the BCAL (Eric). Eric also verified there is no interference between the BCAL and the handrails o
    2 KB (376 words) - 13:27, 13 July 2006
  • ...fts cart assembly (estimated at 1,700 lbs.) onto platform using straps and Eric will prepare it to receive the carriage assembly.
    5 KB (794 words) - 15:38, 27 July 2006
  • ...uld allow the BCAL/carriage to swing without having to adjust the cables. Eric, please comment on how long you think the cables need to be once they reach
    2 KB (341 words) - 14:03, 19 July 2006
  • ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafa #* ''Indiana:'' Eric has communicated with all machine shops and work is proceeding as expected.
    4 KB (607 words) - 17:17, 19 July 2006
  • ...direction, as expected. A thin mu-metal foil is therefore required, since Eric Scott has measured residual magnitization in the stell inserts surrounding
    1 KB (205 words) - 00:00, 18 July 2007
  • :Eric Scott
    5 KB (860 words) - 14:07, 22 September 2006
  • - all work is on schedule (Doug, Eric). Eric will ship 16-Aug for arrival around 21-Aug. He will be here when everythin - Cannot connect anything to handrails (Bert). Doug will install Eric's kill switch on the veto/bpm stand at the entrance to the platform. 110V
    2 KB (344 words) - 13:19, 20 July 2006
  • ''Attendees'': Eric (Indiana), Elton, David, Alex (JLab), George, Blake, Rafael, Zisis (Regina) ...2" thick x 30" x 120") from 'Mu Metal' and it will be drop shipped to IU. Eric will remeasure the field once he gets this material and makes a single mu-m
    4 KB (618 words) - 11:43, 1 August 2006
  • ...ana:'' IU, CMU and FSU machine shops are done (see [[Optical Assembly]]). Eric is away this week but the cart will be assembled and load tested. The ligh # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu
    4 KB (585 words) - 10:54, 6 August 2006
  • [[Image:Cart_crane.jpg|thumb|400px|left|Eric placing the carriage on top of the cart. (August 11)]]
    1 KB (197 words) - 10:53, 13 August 2006
  • Participants: Elton, David L, Dave K, Doug, Matt, Eric
    2 KB (288 words) - 17:10, 10 August 2006
  • ...ics.indiana.edu/~mashephe/bcal_mov/translate.mov Translate (868 KB)]: Here Eric is sliding the carriage back and forth. The carriage is loaded with 2500 p
    2 KB (377 words) - 19:31, 13 August 2006
  • ''Attendees'': Eric (Indiana), Matt (Cornell), Alex, Elton, David, Elliott, Dan Sober, Simon (J
    3 KB (432 words) - 18:49, 16 August 2006
  • # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu
    3 KB (453 words) - 18:53, 16 August 2006
  • '''These numbers will be checked and further refined by Eric, a week before the run.''' In the interim, the H-B engineers will move a l
    40 KB (6,903 words) - 11:09, 31 March 2015
  • In attendance: Elliott, Elton, Dave Kashy, Eric Scott, Doug Tilles - cart, etc. should arrive Monday. Eric will be here for installation.
    1 KB (181 words) - 09:13, 29 August 2006
  • ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael (JLab), Franz ( ...cabled, and the entire setup is covered with a layer of Tedlar. Kudos to Eric & IU for a phenomenal job on the cart, carriage and installation and to the
    5 KB (932 words) - 10:04, 8 September 2006
  • ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael, Simon, Alex (J ...tatus Quo:'' The BPM stand is 1/2 done. The crash-button post is pending; Eric can do it when he arrives if not done before.
    4 KB (686 words) - 10:41, 8 September 2006
  • - Eric will arrive at JLab 18-Sep.
    1 KB (196 words) - 08:52, 11 September 2006
  • ''Attendees'': Alex, Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael, Simon (JLab),
    3 KB (449 words) - 13:49, 18 September 2006
  • #* Zisis will contact Eric Scott to see if the two can recreated the lost position measurements of the
    3 KB (545 words) - 02:51, 1 April 2015
  • ..., construction, and calibration see Eric Pooser's dissertation<ref>Pooser, Eric J., "The GlueX Start Counter & Beam Asymmetry <math>\Sigma</math> in Single
    3 KB (374 words) - 11:39, 13 September 2023
  • ..._archives/HALLD/halld-controls/CURRENT/msg00048.html What's our need? from Eric Scott]
    2 KB (193 words) - 16:46, 3 April 2008
  • ...2015 Summer Collaboration Meeting || Newport News, VA, 2015 July 17-18 || Eric Pooser || [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2
    14 KB (1,602 words) - 17:13, 24 February 2017
  • ...t?docid=2958 Updates on p&eta;' and the &pi;<SUP>0</SUP> beam asymmetry] - Eric Pooser
    9 KB (1,147 words) - 12:39, 14 March 2017
  • * Eric Pooser, <b>Ph.D. Thesis</b>, Florida International University, Supervisor:
    11 KB (1,567 words) - 14:17, 16 May 2024
  • *<font color=blue><i>Hybrid Mesons</i>, Curtis A. Meyer and Eric Swanson, Progress in Particle and Nuclear Physics <b>82</b>, 21 (2015), [ht
    15 KB (2,319 words) - 12:21, 29 July 2021
  • # Start Counter Status: Werner Boeglin/Eric Pooser * '''FIU''': Werner Boeglin, Eric Pooser
    4 KB (673 words) - 17:23, 31 March 2015
  • Werner reported that Eric Pooser has started a TDR contribution for the start counter.
    3 KB (502 words) - 14:09, 21 April 2016
  • ''Attendees: Werner, Joerg, Eric, Mahmoud (FIU), Will M. (CMU), Tegan, Zisis (Regina)" ...o eta-gg, eta->pi+pi-, clear peak in simulations, but broad. 9GeV gammas. Eric looks at pi+pi-g so far, harder to analyze.
    4 KB (565 words) - 19:35, 8 February 2016
  • * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann ...m; it looks like a loose connection between the ST-1 and ST-2 boards. Also Eric could not see output on the FADC scalers. He thought this might be related
    2 KB (284 words) - 14:50, 3 December 2015
  • ...ldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1683 Timing Studies] - Eric Pooser
    9 KB (1,174 words) - 12:39, 14 March 2017
  • ** Eric Pooser: graduate student, working on prototype hardware studies
    2 KB (392 words) - 21:54, 31 March 2015
  • # Start Counter News: Werner, Lei, Eric * '''FIU''': Werner Boeglin, Lei Guo, Eric Pooser
    3 KB (549 words) - 17:01, 24 February 2017
  • # Start Counter News: Werner, Lei, Eric * Eric Pooser has started looking at a new amplifer that should have higher bandwi
    2 KB (258 words) - 07:03, 1 April 2015
  • ...C Summer Collaboration Meeting, Jefferson Lab, July 18, 2015, presented by Eric Pooser. ...b.jlab.org/doc-private/DocDB/ShowDocument?docid=2880 GlueX Start Counter], Eric Pooser
    77 KB (10,281 words) - 10:24, 23 April 2024
  • # Start Counter News: Werner, Lei, Eric * Werner and Eric have looked at a new fast shaping amplifier. It looks good so far. They wil
    4 KB (571 words) - 06:07, 1 April 2015
  • * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann * Eric has finished writing his thesis!
    3 KB (476 words) - 12:38, 14 March 2017
  • * '''FIU''': Lei Guo, Eric Pooser * Eric is finishing building the dark box that will house the scintillator and lon
    2 KB (294 words) - 06:58, 1 April 2015
  • * '''FIU''': Werner Boeglin, Lei Guo, Eric Pooser
    4 KB (614 words) - 23:47, 31 March 2015
  • * '''FIU''': Mahmoud Kamel, Eric Pooser There was one round of pedestal adjustment for the FADCs early in the run by Eric and Sergey Furletov. Nothing has been done since. Beni advocates doing anot
    4 KB (642 words) - 17:00, 24 February 2017
  • * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser
    3 KB (516 words) - 01:50, 1 April 2015
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Lei Guo, Eric Pooser Eric has been looking at more of the scintillator pieces from Plastic Craft. The
    3 KB (448 words) - 20:17, 31 March 2015
  • * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser Eric showed several views of possible positions for the 4x4 SiPM arrays with res
    3 KB (536 words) - 06:05, 1 April 2015
  • # Test re-polished counter. -> Eric Pooser
    3 KB (554 words) - 04:15, 1 April 2015
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric re-measured the two "good" scintillators after re-polishing by Plastic craf
    3 KB (473 words) - 21:27, 31 March 2015
  • ...dweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2075 Start Counter] --- Eric Pooser
    10 KB (1,216 words) - 12:38, 14 March 2017
  • * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser
    3 KB (348 words) - 06:10, 1 April 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric gave the report.
    4 KB (668 words) - 00:43, 1 April 2015
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser
    4 KB (557 words) - 22:03, 31 March 2015
  • * '''FIU''': Puneet Khetarpal, Eric Pooser
    2 KB (276 words) - 22:03, 31 March 2015
  • ...ab.org/doc-private/DocDB/ShowDocument?docid=2172 Start Counter Update] --- Eric Pooser
    8 KB (1,048 words) - 12:39, 14 March 2017
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric presented the current ideas on the mechanical assembly of the final detecto
    2 KB (327 words) - 18:23, 31 March 2015
  • * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser Eric did not receive the model of the counter from Chuck. Chuck will re-send.
    2 KB (321 words) - 06:42, 1 April 2015
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric has done a single photo-electron measurement on a tube to determine its gai
    3 KB (535 words) - 23:31, 31 March 2015
  • * '''FIU''': Werner Boeglin, Puneet Khertarpal, Eric Pooser Eric went through an abridged version of the presentation he gave for the CEO of
    3 KB (488 words) - 14:52, 31 March 2015
  • * '''FIU''': Eric Pooser Eric gave a report.
    4 KB (707 words) - 22:25, 31 March 2015
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser ...t at Eljen. Chuck has talked to the guy at Eljen who will run our project. Eric has also contacted Robert McNeal about plan to have Eljen do the bending.
    2 KB (376 words) - 18:23, 31 March 2015
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=2423 Start Counter Status] - Eric Pooser
    10 KB (1,265 words) - 12:39, 14 March 2017
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=2322 Start Counter Update] - Eric Pooser
    10 KB (1,327 words) - 12:38, 14 March 2017
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric is in contact with Chuck Hurlbut at Eljen and Robert McNeal (at McNeal) and
    3 KB (403 words) - 23:40, 31 March 2015
  • * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric is doing wrapping tests with the old McNeal bars. He will try lots of combi
    3 KB (442 words) - 21:45, 31 March 2015
  • * '''FIU''': Eric Pooser Eric got feedback from Fernando Barbosa; he should include the attenuation in th
    4 KB (612 words) - 02:24, 1 April 2015
  • ...r 4: Start Counter Calibration'' in Eric Pooser's dissertation<ref>Pooser, Eric J., "The GlueX Start Counter & Beam Asymmetry <math>\Sigma</math> in Single
    10 KB (1,598 words) - 13:24, 27 March 2024
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric reports that he re-did the gain measurement and indeed the &times;5 amplifi
    4 KB (583 words) - 06:51, 1 April 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric reported that Eljen has finished manufacturing five counters with a precisi
    3 KB (516 words) - 15:50, 31 March 2015
  • * '''FIU''': Eric Pooser ...ceived. McNeal is waiting for a PO before starting machining the counters. Eric is monitoring the situation.
    2 KB (371 words) - 07:03, 1 April 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric reports that the test stand design is done and is in the hands of the machi
    3 KB (408 words) - 23:41, 31 March 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser ...l start soon. They have asked for updated drawings of scintillator pieces. Eric will contact them and check progress.
    3 KB (388 words) - 06:05, 1 April 2015
  • ...Ito (chair), David Lawrence, Paul Mattione, Curtis Meyer, Sandy Philpott, Eric Pooser, Nathan Sparks, Justin Stevens, Simon Taylor
    6 KB (948 words) - 18:26, 3 February 2016
  • * '''FIU''': Eric Pooser Eric described the five new counters from Eljen/McNeal. He has tested all five.
    3 KB (544 words) - 20:53, 31 March 2015
  • # remeasure scintillation bars delayed till Eric is back
    3 KB (461 words) - 20:17, 31 March 2015
  • * '''FIU''': Lei Guo, Eric Pooser Eric told us that the test stand will be ready by September 9th at the latest. T
    3 KB (409 words) - 06:35, 1 April 2015
  • * '''FIU''': Eric Pooser ...September, but the counters will be far from ready for a full-system test. Eric mentioned that he has had some email dialogue with Fernando on this already
    3 KB (534 words) - 17:22, 31 March 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric gave us an update.
    5 KB (833 words) - 00:14, 1 April 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric has started picking up the simulation projects that Puneet was working on,
    2 KB (365 words) - 22:50, 31 March 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser * Eric has been browsing the McMaster catalog for parts for the assembly jig.
    3 KB (433 words) - 20:46, 31 March 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser ...urlbut at the DNP meeting last week. Eljen has already started production. Eric estimates that they will receive everything from Eljen/McNeal in about ten
    4 KB (587 words) - 01:50, 1 April 2015
  • Eric (Start Counter): Construction still underway.
    5 KB (818 words) - 06:26, 1 April 2015
  • * '''FIU''': Eric Pooser
    2 KB (277 words) - 05:58, 1 April 2015
  • Start Counter: (Eric) nothing to report regarding installation; some delay in production from El
    4 KB (683 words) - 11:35, 31 March 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric gave the report.
    3 KB (491 words) - 18:44, 31 March 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser ...cember 16. They have arrived, but status of work is unknown at this point. Eric has been trying to get some information on that.
    3 KB (433 words) - 04:25, 1 April 2015
  • ...Beni, Eugene, Mark, David L., Mark D. (JLab); Curtis (CMU); Justin (MIT); Eric (FIU)
    3 KB (416 words) - 16:29, 31 March 2015
  • ...id L., Sergey F., Mike S. (JLab); Matt S. (IU); Curtis, Paul, Naomi (CMU); Eric (FIU); Justin (MIT)
    9 KB (1,425 words) - 17:12, 24 February 2017
  • * '''FIU''': Werner Boeglin, Eric Pooser Eric reported news from McNeal that the 50 pieces of scintillator received from
    4 KB (623 words) - 18:17, 31 March 2015
  • <td> Eric Pooser</td>
    2 KB (283 words) - 10:25, 20 August 2014
  • * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann ...art-counter have been retracted from the bore. When they are re-installed, Eric will go though the Hot Checkout procedure. He did a similar some weeks ago
    2 KB (347 words) - 15:48, 3 December 2015
  • * '''FIU''': Werner Boeglin, Eric Pooser ...the TDR contribution went out. Mark has some comments that he will send to Eric.
    5 KB (807 words) - 22:47, 31 March 2015
  • Attending: Sean, Amiran (NU); Mark, Simon, Eugene, Beni, David L. (JLab); Eric (FIU) #* Eric has been working on the simulation code for the start counter, and is devel
    2 KB (364 words) - 16:29, 31 March 2015
  • ...ean (NU); Simon, Paul M., Mark I., David L., Luke, Alex B., Justin (JLab); Eric, Mahmoud (FIU); Curtis, Will, Naomi (CMU); Matt S. (IU); Cristiano (MIT)
    7 KB (1,106 words) - 17:13, 24 February 2017

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)