Pages with the most revisions

From GlueXWiki
Jump to: navigation, search

Showing below up to 250 results in range #51 to #300.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. GlueX-Collaboration-May-2010‏‎ (160 revisions)
  2. Naomi‏‎ (157 revisions)
  3. RunPeriod-2021-09 Validation‏‎ (155 revisions)
  4. SRC/CT Physics Analysis‏‎ (154 revisions)
  5. GlueX-Collaboration-May-2019‏‎ (153 revisions)
  6. BCAL Readout‏‎ (152 revisions)
  7. GlueX-Collaboration-Oct-2013‏‎ (151 revisions)
  8. GlueX-Collaboration-May-2020‏‎ (149 revisions)
  9. Photon Beam‏‎ (147 revisions)
  10. Run Coordination Meetings:Fall2017 Spring2018 Run‏‎ (146 revisions)
  11. GlueX-Collaboration-Feb-2012‏‎ (142 revisions)
  12. Analysis Actions‏‎ (141 revisions)
  13. GlueX-Collaboration-Sep-2010‏‎ (140 revisions)
  14. Run Planning Meeting Notes, June 30 - July 06, 2022‏‎ (140 revisions)
  15. Run Coordination Meetings: Spring 2016 Run‏‎ (139 revisions)
  16. GlueX-Collaboration-June-2018‏‎ (139 revisions)
  17. Run Planning Meeting Notes, July 21- July 27, 2022‏‎ (138 revisions)
  18. Run Coordination Meetings:Fall2019 Run‏‎ (138 revisions)
  19. Run Coordination Meetings: Fall 2014‏‎ (135 revisions)
  20. Run Planning Meeting Notes, February 9 - February 15, 2023‏‎ (133 revisions)
  21. Deprecated: Action Items From Hall D Offline Meetings‏‎ (133 revisions)
  22. Instrumentation Publications‏‎ (133 revisions)
  23. Run Planning Meeting Notes, October 7 - October 13, 2021‏‎ (131 revisions)
  24. Testing ECAL modules‏‎ (130 revisions)
  25. SiPM Database‏‎ (130 revisions)
  26. Guide to Using Git‏‎ (129 revisions)
  27. Double Regge Exchange Meeting‏‎ (128 revisions)
  28. GlueX-Collaboration-Oct-2016‏‎ (128 revisions)
  29. Run Coordination Meetings:Spring2023‏‎ (128 revisions)
  30. GlueX-Collaboration-Oct-2015‏‎ (127 revisions)
  31. GlueX-Collaboration-Feb-2019‏‎ (127 revisions)
  32. GlueX-Collaboration-Feb-2014‏‎ (126 revisions)
  33. Using the Grid‏‎ (126 revisions)
  34. Software‏‎ (126 revisions)
  35. FA125 firmware check‏‎ (125 revisions)
  36. GlueX-Collaboration-Sep-2018‏‎ (124 revisions)
  37. CPP and NPP Readiness Review‏‎ (123 revisions)
  38. GlueX-Collaboration-Feb-2017‏‎ (123 revisions)
  39. GlueX-Collaboration-Jan-2011‏‎ (123 revisions)
  40. Run Planning Meeting Notes, February 16 - February 22, 2023‏‎ (122 revisions)
  41. Run Planning Meeting Notes, Novemver 17 - Novemver 23, 2022‏‎ (121 revisions)
  42. GlueX Analysis Software‏‎ (121 revisions)
  43. GlueX-Collaboration-Feb-2015‏‎ (119 revisions)
  44. CDC algo‏‎ (119 revisions)
  45. Weekly Analysis Meetings‏‎ (118 revisions)
  46. Electronics Trigger Meetings‏‎ (118 revisions)
  47. GlueX-Collaboration-May-2014‏‎ (117 revisions)
  48. CPP and NPP Run Conditions‏‎ (117 revisions)
  49. Run Coordination Meetings:Summer2021‏‎ (116 revisions)
  50. RunPeriod-2019-01 Validation‏‎ (116 revisions)
  51. Level-1 Trigger‏‎ (116 revisions)
  52. Offline Monitoring Data Validation PrimEx‏‎ (116 revisions)
  53. GlueX Tutorial 2022‏‎ (115 revisions)
  54. 2022 Data Production‏‎ (115 revisions)
  55. Offline Software News Archive‏‎ (115 revisions)
  56. Run Planning Meeting Notes, June 23 - June 29, 2022‏‎ (115 revisions)
  57. GlueX-Collaboration-Feb-2013‏‎ (114 revisions)
  58. Nov 3-5, 2009 Calorimetry‏‎ (113 revisions)
  59. Eta Decay Width Measurements via Primakoff Effect‏‎ (113 revisions)
  60. Offline Monitoring Data Validation‏‎ (113 revisions)
  61. CDC recent run drift times‏‎ (113 revisions)
  62. Run Coordination Meetings:Summer2020‏‎ (112 revisions)
  63. GlueX-Collaboration-Oct-2012‏‎ (112 revisions)
  64. Run Coordination Meetings: Spring run‏‎ (112 revisions)
  65. Mattione Update 09042013‏‎ (112 revisions)
  66. Fiber Test Stand at JLAB‏‎ (111 revisions)
  67. Mattione Update 04212014‏‎ (111 revisions)
  68. GlueX-Collaboration-Feb-2020‏‎ (111 revisions)
  69. GlueX-Collaboration-Jun-2013‏‎ (110 revisions)
  70. Private:Trigger Types‏‎ (109 revisions)
  71. Analysis DReaction‏‎ (109 revisions)
  72. Studies of the Newport XPS controller by Vanik‏‎ (108 revisions)
  73. Run Planning Meeting Notes, Mar 29-Apr 4, 2018‏‎ (108 revisions)
  74. GlueX-Collaboration-Sep-2009‏‎ (107 revisions)
  75. GlueX-Collaboration-Jun-2012‏‎ (107 revisions)
  76. LE algo‏‎ (107 revisions)
  77. GlueX-Collaboration-May-2021‏‎ (107 revisions)
  78. Summer 2013 Manpower Contributions‏‎ (106 revisions)
  79. GlueX-Collaboration-Oct-2014‏‎ (106 revisions)
  80. RunPeriod-2018-01 Validation‏‎ (104 revisions)
  81. GlueX-Collaboration-Sep-2011‏‎ (104 revisions)
  82. Offline HOWTO List‏‎ (104 revisions)
  83. GlueX-Collaboration-Oct-2019‏‎ (103 revisions)
  84. Run Planning Meeting Notes, Mar 1-Mar 7, 2018‏‎ (103 revisions)
  85. GlueX Physics Quark Model‏‎ (103 revisions)
  86. Experiment Readiness Review 2020‏‎ (103 revisions)
  87. GlueX-Collaboration-May-2017‏‎ (103 revisions)
  88. PMT & Divider‏‎ (102 revisions)
  89. Run Planning Meeting Noters, November 9- November 16, 2022‏‎ (102 revisions)
  90. Online Major Milestones‏‎ (102 revisions)
  91. Run Coordination Meetings:Summer2022‏‎ (101 revisions)
  92. Run Planning Meeting Notes, September 17 - 21, 2020‏‎ (101 revisions)
  93. RunPeriod-2022-05 Validation‏‎ (101 revisions)
  94. Run Coordination Meetings:Spring2019 Run‏‎ (101 revisions)
  95. Online task list for 2011‏‎ (101 revisions)
  96. Noise studies‏‎ (100 revisions)
  97. Run Planning Meeting Notes, November 24 - November 30, 2022‏‎ (100 revisions)
  98. Oct 15, 2008 Calorimetry‏‎ (99 revisions)
  99. GlueX-Collaboration-May-2009‏‎ (99 revisions)
  100. Run Coordination Meetings: Fall 2016 Run‏‎ (99 revisions)
  101. GlueX-Collaboration-Oct-2017‏‎ (99 revisions)
  102. Run Planning Meeting Notes, January 26 - February 1, 2023‏‎ (99 revisions)
  103. GlueX-Collaboration-Feb-2022‏‎ (98 revisions)
  104. Real Gamma GDH Experiment (REGGE)‏‎ (98 revisions)
  105. Run Planning Meeting Notes, Feb 12-Feb 28, 2018‏‎ (97 revisions)
  106. SRC@GlueX‏‎ (97 revisions)
  107. Run Planning Meeting Notes, August 27-September 2, 2020‏‎ (97 revisions)
  108. GlueX-Collaboration-May-2016‏‎ (97 revisions)
  109. Run Planning Meeting Notes, September 22 - September 28, 2022‏‎ (96 revisions)
  110. Spring 2019 DIRC Commissioning‏‎ (95 revisions)
  111. Run Table‏‎ (95 revisions)
  112. PrimEx (informal) Calibration & Analysis Meeting‏‎ (95 revisions)
  113. BCAL Beam Tests 2012‏‎ (95 revisions)
  114. BCAL Reconstruction‏‎ (94 revisions)
  115. Run Planning Meeting Notes, September 3 - 9, 2020‏‎ (93 revisions)
  116. SiPM electrical and cooling‏‎ (93 revisions)
  117. GlueX-Collaboration-May-2015‏‎ (93 revisions)
  118. GlueX-Collaboration-Feb-2016‏‎ (93 revisions)
  119. Primer for shift takers DRAFT‏‎ (93 revisions)
  120. Follow up on the Hodoscope Fabrication Readiness Review‏‎ (91 revisions)
  121. SRC FCAL time/energy calibrations‏‎ (91 revisions)
  122. GlueX-Collaboration-Jan-2010‏‎ (90 revisions)
  123. May 2008 Subsystem Review‏‎ (89 revisions)
  124. Run Planning Meeting Notes, Dec 5-Dec 11, 2019‏‎ (89 revisions)
  125. Run Planning Meeting Notes, August 25 - August 31, 2022‏‎ (89 revisions)
  126. Run Planning Meeting Notes, Nov 1-Nov 8, 2018‏‎ (88 revisions)
  127. Online Design Goals‏‎ (88 revisions)
  128. Calibration Challenge‏‎ (88 revisions)
  129. PAC Proposals‏‎ (87 revisions)
  130. GlueX-Collaboration-Oct-2020‏‎ (87 revisions)
  131. GlueX-Collaboration-May-2023‏‎ (87 revisions)
  132. Theses‏‎ (87 revisions)
  133. GlueX-Collaboration-Jan-2009‏‎ (87 revisions)
  134. 2012 Software Review‏‎ (87 revisions)
  135. Solenoid Coil Test Weekly meetings‏‎ (87 revisions)
  136. Offline Monitoring Data Validation CPP‏‎ (87 revisions)
  137. Analysis shift‏‎ (87 revisions)
  138. Beam Commissioning Plan‏‎ (86 revisions)
  139. GlueX Physics Photoproduction‏‎ (85 revisions)
  140. SRC/CT Good Run Selection‏‎ (85 revisions)
  141. Getting Started At GlueX‏‎ (84 revisions)
  142. GlueX Physics‏‎ (84 revisions)
  143. CDC B field‏‎ (84 revisions)
  144. Run Planning Meeting Notes, September 23 - September 29, 2021‏‎ (84 revisions)
  145. Preparation for 2021 Run‏‎ (84 revisions)
  146. GlueX-Collaboration-Feb-2018‏‎ (84 revisions)
  147. Run Planning Meeting Notes, Apr12-Apr 18, 2018‏‎ (84 revisions)
  148. 2020 Data Production‏‎ (84 revisions)
  149. GlueX-Collaboration-Feb-2024‏‎ (83 revisions)
  150. Beam Test Run Plan‏‎ (83 revisions)
  151. ReactionFilter‏‎ (82 revisions)
  152. GlueX PID Bi-Weekly Meetings‏‎ (81 revisions)
  153. Run Planning Meeting Notes, Feb 23- Mar 1, 2017‏‎ (81 revisions)
  154. Photon Tagger‏‎ (81 revisions)
  155. Run Planning Meeting Notes, Jan 25-Jan 31, 2018‏‎ (81 revisions)
  156. Repairs made to TAGH scintillator counters over the summer of 2019‏‎ (81 revisions)
  157. Weekly Technical Meetings‏‎ (81 revisions)
  158. University of Connecticut Active Collimator Station Tutorial‏‎ (80 revisions)
  159. F425962‏‎ (80 revisions)
  160. Run Wiki‏‎ (80 revisions)
  161. GlueX Tutorial 2018‏‎ (80 revisions)
  162. SRC-CT Software‏‎ (79 revisions)
  163. CDC 216 channels‏‎ (78 revisions)
  164. GlueX-Collaboration-Sep-2023‏‎ (78 revisions)
  165. Reviews‏‎ (78 revisions)
  166. RunPeriod-2023-01 Validation‏‎ (77 revisions)
  167. Online Project List‏‎ (77 revisions)
  168. CDC 50 50‏‎ (77 revisions)
  169. Final test of dividers‏‎ (77 revisions)
  170. HOWTO use hdgeant4 as a beam Monte Carlo generator‏‎ (77 revisions)
  171. Analysis Working Group Meetings‏‎ (77 revisions)
  172. GlueX-Collaboration-Feb-2021‏‎ (76 revisions)
  173. HDDM Programmer's Interface‏‎ (76 revisions)
  174. Mattione Update 10312011‏‎ (76 revisions)
  175. FA125 firmware check 2.00D+‏‎ (76 revisions)
  176. Mattione Kaon PID Studies phi3(1850)‏‎ (76 revisions)
  177. Run Planning Meeting Notes, March 1 - March 8, 2023‏‎ (76 revisions)
  178. Posters‏‎ (76 revisions)
  179. HDGeant4 Meetings‏‎ (76 revisions)
  180. Run Planning Meeting Notes, February 23 - February 28, 2023‏‎ (76 revisions)
  181. GlueX-Collaboration-Sep-2021‏‎ (75 revisions)
  182. RunPeriod-2016-02 Validation‏‎ (75 revisions)
  183. Deprecated: JANA/DANA‏‎ (74 revisions)
  184. Physics Publications‏‎ (74 revisions)
  185. Run Planning Meeting Notes, Oct 4-Oct 10, 2018‏‎ (74 revisions)
  186. Pair Spectrometer‏‎ (73 revisions)
  187. Run Coordination Meetings: Spring 2017 Run‏‎ (73 revisions)
  188. GlueX Physics Strong Decay Models‏‎ (73 revisions)
  189. GlueX-Collaboration-Sep-2022‏‎ (73 revisions)
  190. HallD Online IP Name And Address Conventions‏‎ (73 revisions)
  191. Kinematic Fitting Workshop 2021‏‎ (72 revisions)
  192. Spring 2017 Analysis Launch Cuts‏‎ (72 revisions)
  193. Run Planning Meeting Notes, August 11- August 17, 2022‏‎ (72 revisions)
  194. GlueX-Collaboration-May-2022‏‎ (71 revisions)
  195. ASIC design optimizations‏‎ (71 revisions)
  196. RunPeriod-2022-08 Validation‏‎ (71 revisions)
  197. Run Planning Meeting Notes, February 2 - February 9, 2023‏‎ (70 revisions)
  198. 2011 Hall B FCAL Beam Test‏‎ (70 revisions)
  199. Run Planning Meeting Notes, Mar 12-Mar 18, 2020‏‎ (70 revisions)
  200. Tagged Beam Group Engineering Drawings‏‎ (70 revisions)
  201. Active Base Radiation Tests‏‎ (70 revisions)
  202. Test Setup for SiPMs‏‎ (69 revisions)
  203. Run Planning Meeting Notes, Jan 30-Feb 05, 2020‏‎ (69 revisions)
  204. CRYTUR‏‎ (69 revisions)
  205. Trigger Commissioning‏‎ (69 revisions)
  206. Run Planning Meeting Notes, Sep 28-Oct 3, 2018‏‎ (69 revisions)
  207. Sim-Recon Tagged Releases‏‎ (69 revisions)
  208. Run Planning Meeting Notes, July 07 - July 14, 2022‏‎ (68 revisions)
  209. Private:UConn test setup‏‎ (68 revisions)
  210. Run Planning Meeting Notes, June 8 - June 15, 2022‏‎ (68 revisions)
  211. Run Planning Meeting Notes, October 21 - October 27, 2021‏‎ (67 revisions)
  212. RunPeriod-2017-01 Validation‏‎ (67 revisions)
  213. GlueX-Collaboration-Feb-2023‏‎ (67 revisions)
  214. Getting started with GlueX Software‏‎ (67 revisions)
  215. FCAL Insert‏‎ (67 revisions)
  216. Offline Monitoring Archived Data‏‎ (67 revisions)
  217. Tagger Microscope‏‎ (67 revisions)
  218. 2017-01-recon v2-sims‏‎ (66 revisions)
  219. Specification for 12 GeV electron beam and associated instrumentation‏‎ (66 revisions)
  220. Light Guide Information‏‎ (66 revisions)
  221. CDC 60 40‏‎ (65 revisions)
  222. DIRC‏‎ (65 revisions)
  223. CDC q vs n‏‎ (65 revisions)
  224. Trigger and Readout Electronics‏‎ (65 revisions)
  225. Run Planning Meeting Notes, Feb 16-Feb 22, 2017‏‎ (65 revisions)
  226. FA125 chip occupancy‏‎ (64 revisions)
  227. GlueX phase 2, 2023-01 data set‏‎ (64 revisions)
  228. Calibration Train‏‎ (64 revisions)
  229. Time-of-Flight‏‎ (64 revisions)
  230. GlueX-Collaboration-May-2008‏‎ (63 revisions)
  231. Run Planning Meeting Notes, November 30 - December 7, 2022‏‎ (63 revisions)
  232. HOWTO install and run HDGeant4‏‎ (63 revisions)
  233. Analysis Launch Plugin Requirements‏‎ (63 revisions)
  234. TS front panel connections‏‎ (63 revisions)
  235. MEDCON6 Shutdown Plan‏‎ (63 revisions)
  236. Automatic Builds of GlueX Software‏‎ (63 revisions)
  237. DSelector‏‎ (63 revisions)
  238. Specification for active photon collimator system‏‎ (63 revisions)
  239. GlueX Software Setup‏‎ (63 revisions)
  240. Mattione Study b1pi‏‎ (62 revisions)
  241. DC and PID Review‏‎ (62 revisions)
  242. Run Planning Meeting Notes, August 18 - August 23, 2022‏‎ (62 revisions)
  243. Calibration-Monitoring‏‎ (62 revisions)
  244. Fall 2015 Commissioning Plan‏‎ (62 revisions)
  245. Mattione BCAL Segmentation‏‎ (62 revisions)
  246. Online builds 10-apr-2013‏‎ (61 revisions)
  247. Practice Talks‏‎ (60 revisions)
  248. GlueX-II and DIRC ERR‏‎ (60 revisions)
  249. Improved timing‏‎ (60 revisions)
  250. For the second coil‏‎ (60 revisions)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)