Search results
From GlueXWiki
Create the page "Eric" on this wiki! See also the search results found.
- #*Design: Eric's May 3<sup>rd</sup> note was discussed and Regina approved the design (the2 KB (254 words) - 11:45, 19 May 2006
- ''Attendees'': Alex Dzierba, Paul S., Matt, Eric S. (Indiana), David L., Elliott (JLab), George, Mauricio, Zisis (Regina)4 KB (752 words) - 22:43, 23 May 2006
- ''Attendees'': Alex, Chris, Eric (Indiana), David L., Elliott, Elton (JLab), Curtis (CMU), George, Rafael, Z ...ight guides (LGs): they were 4cm whereas IU thought they'd be 1.5 inches. Eric will check all tolerances and make sure all is ok. Pictures of the cart w7 KB (1,214 words) - 16:57, 6 July 2006
- <tr><td>Eric Scott</td><td>Mechanical</td><td>June 12-16</td><td>Matt Shephard</td></tr>763 B (124 words) - 10:28, 21 July 2006
- * ''Tentative dates for IU personnel:'' Eric (Aug. 20 - Aug.27)6 KB (1,040 words) - 21:11, 23 August 2006
- ...e Kashy we need one day to uncrate, prepare, and then rig into the alcove (Eric). Then we will set up to take cosmics for at least two weeks (Zisis). - H-B will arrange for surveying marks on floor and wall (Dave). Eric will verify this is acceptable.3 KB (536 words) - 08:51, 11 July 2006
- ''Attendees'': Matt, Eric (Indiana), David L., Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, ...ds re craning, alignment, surveying to the engineers as soon as possible. Eric will review the issue of extending the plate into the alcove for a smoooth6 KB (970 words) - 09:25, 11 July 2006
- ...crane, etc, esp. requests for H-B technician time (Elliott with help from Eric,Zisis) - equipment will arrive at JLab towards the end of Aug (Zisis, Eric)3 KB (503 words) - 08:26, 11 July 2006
- ''Attendees'': Matt (Cornell), Eric (Indiana), David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zis ...o machine parts for the cart. The rest of the work continues at Indiana. Eric is working on a design for the underlying plate, to allow the cart and leg3 KB (464 words) - 15:44, 12 July 2006
- Report on meeting between Elliott, Eric, Dave Kashy, and Doug Tilles: ...(Dave). There should be no interference between it and the BCAL (Eric). Eric also verified there is no interference between the BCAL and the handrails o2 KB (376 words) - 13:27, 13 July 2006
- ...fts cart assembly (estimated at 1,700 lbs.) onto platform using straps and Eric will prepare it to receive the carriage assembly.5 KB (794 words) - 15:38, 27 July 2006
- ...uld allow the BCAL/carriage to swing without having to adjust the cables. Eric, please comment on how long you think the cables need to be once they reach2 KB (341 words) - 14:03, 19 July 2006
- ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafa #* ''Indiana:'' Eric has communicated with all machine shops and work is proceeding as expected.4 KB (607 words) - 17:17, 19 July 2006
- ...direction, as expected. A thin mu-metal foil is therefore required, since Eric Scott has measured residual magnitization in the stell inserts surrounding1 KB (205 words) - 00:00, 18 July 2007
- :Eric Scott5 KB (860 words) - 14:07, 22 September 2006
- - all work is on schedule (Doug, Eric). Eric will ship 16-Aug for arrival around 21-Aug. He will be here when everythin - Cannot connect anything to handrails (Bert). Doug will install Eric's kill switch on the veto/bpm stand at the entrance to the platform. 110V2 KB (344 words) - 13:19, 20 July 2006
- ''Attendees'': Eric (Indiana), Elton, David, Alex (JLab), George, Blake, Rafael, Zisis (Regina) ...2" thick x 30" x 120") from 'Mu Metal' and it will be drop shipped to IU. Eric will remeasure the field once he gets this material and makes a single mu-m4 KB (618 words) - 11:43, 1 August 2006
- ...ana:'' IU, CMU and FSU machine shops are done (see [[Optical Assembly]]). Eric is away this week but the cart will be assembled and load tested. The ligh # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu4 KB (585 words) - 10:54, 6 August 2006
- [[Image:Cart_crane.jpg|thumb|400px|left|Eric placing the carriage on top of the cart. (August 11)]]1 KB (197 words) - 10:53, 13 August 2006
- Participants: Elton, David L, Dave K, Doug, Matt, Eric2 KB (288 words) - 17:10, 10 August 2006
- ...ics.indiana.edu/~mashephe/bcal_mov/translate.mov Translate (868 KB)]: Here Eric is sliding the carriage back and forth. The carriage is loaded with 2500 p2 KB (377 words) - 19:31, 13 August 2006
- ''Attendees'': Eric (Indiana), Matt (Cornell), Alex, Elton, David, Elliott, Dan Sober, Simon (J3 KB (432 words) - 18:49, 16 August 2006
- # ''Mu metal foil:'' Eric will measure the field inside the insert and mu-metal by making a single mu3 KB (453 words) - 18:53, 16 August 2006
- '''These numbers will be checked and further refined by Eric, a week before the run.''' In the interim, the H-B engineers will move a l40 KB (6,903 words) - 11:09, 31 March 2015
- In attendance: Elliott, Elton, Dave Kashy, Eric Scott, Doug Tilles - cart, etc. should arrive Monday. Eric will be here for installation.1 KB (181 words) - 09:13, 29 August 2006
- ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael (JLab), Franz ( ...cabled, and the entire setup is covered with a layer of Tedlar. Kudos to Eric & IU for a phenomenal job on the cart, carriage and installation and to the5 KB (932 words) - 10:04, 8 September 2006
- ''Attendees'': Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael, Simon, Alex (J ...tatus Quo:'' The BPM stand is 1/2 done. The crash-button post is pending; Eric can do it when he arrives if not done before.4 KB (686 words) - 10:41, 8 September 2006
- - Eric will arrive at JLab 18-Sep.1 KB (196 words) - 08:52, 11 September 2006
- ''Attendees'': Alex, Matt, Eric (Indiana), Elton, David, Elliott, Dan Carman, Blake, Rafael, Simon (JLab),3 KB (449 words) - 13:49, 18 September 2006
- #* Zisis will contact Eric Scott to see if the two can recreated the lost position measurements of the3 KB (545 words) - 02:51, 1 April 2015
- ..., construction, and calibration see Eric Pooser's dissertation<ref>Pooser, Eric J., "The GlueX Start Counter & Beam Asymmetry <math>\Sigma</math> in Single3 KB (374 words) - 11:39, 13 September 2023
- ..._archives/HALLD/halld-controls/CURRENT/msg00048.html What's our need? from Eric Scott]2 KB (193 words) - 16:46, 3 April 2008
- ...2015 Summer Collaboration Meeting || Newport News, VA, 2015 July 17-18 || Eric Pooser || [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=214 KB (1,602 words) - 17:13, 24 February 2017
- ...t?docid=2958 Updates on pη' and the π<SUP>0</SUP> beam asymmetry] - Eric Pooser9 KB (1,147 words) - 12:39, 14 March 2017
- * Eric Pooser, <b>Ph.D. Thesis</b>, Florida International University, Supervisor:11 KB (1,567 words) - 14:17, 16 May 2024
- *<font color=blue><i>Hybrid Mesons</i>, Curtis A. Meyer and Eric Swanson, Progress in Particle and Nuclear Physics <b>82</b>, 21 (2015), [ht15 KB (2,319 words) - 12:21, 29 July 2021
- # Start Counter Status: Werner Boeglin/Eric Pooser * '''FIU''': Werner Boeglin, Eric Pooser4 KB (673 words) - 17:23, 31 March 2015
- Werner reported that Eric Pooser has started a TDR contribution for the start counter.3 KB (502 words) - 14:09, 21 April 2016
- ''Attendees: Werner, Joerg, Eric, Mahmoud (FIU), Will M. (CMU), Tegan, Zisis (Regina)" ...o eta-gg, eta->pi+pi-, clear peak in simulations, but broad. 9GeV gammas. Eric looks at pi+pi-g so far, harder to analyze.4 KB (565 words) - 19:35, 8 February 2016
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann ...m; it looks like a loose connection between the ST-1 and ST-2 boards. Also Eric could not see output on the FADC scalers. He thought this might be related2 KB (284 words) - 14:50, 3 December 2015
- ...ldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1683 Timing Studies] - Eric Pooser9 KB (1,174 words) - 12:39, 14 March 2017
- ** Eric Pooser: graduate student, working on prototype hardware studies2 KB (392 words) - 21:54, 31 March 2015
- # Start Counter News: Werner, Lei, Eric * '''FIU''': Werner Boeglin, Lei Guo, Eric Pooser3 KB (549 words) - 17:01, 24 February 2017
- # Start Counter News: Werner, Lei, Eric * Eric Pooser has started looking at a new amplifer that should have higher bandwi2 KB (258 words) - 07:03, 1 April 2015
- ...C Summer Collaboration Meeting, Jefferson Lab, July 18, 2015, presented by Eric Pooser. ...b.jlab.org/doc-private/DocDB/ShowDocument?docid=2880 GlueX Start Counter], Eric Pooser77 KB (10,281 words) - 10:24, 23 April 2024
- # Start Counter News: Werner, Lei, Eric * Werner and Eric have looked at a new fast shaping amplifier. It looks good so far. They wil4 KB (571 words) - 06:07, 1 April 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann * Eric has finished writing his thesis!3 KB (476 words) - 12:38, 14 March 2017
- * '''FIU''': Lei Guo, Eric Pooser * Eric is finishing building the dark box that will house the scintillator and lon2 KB (294 words) - 06:58, 1 April 2015
- * '''FIU''': Werner Boeglin, Lei Guo, Eric Pooser4 KB (614 words) - 23:47, 31 March 2015
- * '''FIU''': Mahmoud Kamel, Eric Pooser There was one round of pedestal adjustment for the FADCs early in the run by Eric and Sergey Furletov. Nothing has been done since. Beni advocates doing anot4 KB (642 words) - 17:00, 24 February 2017
- * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser3 KB (516 words) - 01:50, 1 April 2015
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Lei Guo, Eric Pooser Eric has been looking at more of the scintillator pieces from Plastic Craft. The3 KB (448 words) - 20:17, 31 March 2015
- * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser Eric showed several views of possible positions for the 4x4 SiPM arrays with res3 KB (536 words) - 06:05, 1 April 2015
- # Test re-polished counter. -> Eric Pooser3 KB (554 words) - 04:15, 1 April 2015
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric re-measured the two "good" scintillators after re-polishing by Plastic craf3 KB (473 words) - 21:27, 31 March 2015
- ...dweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2075 Start Counter] --- Eric Pooser10 KB (1,216 words) - 12:38, 14 March 2017
- * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser3 KB (348 words) - 06:10, 1 April 2015
- * '''FIU''': Werner Boeglin, Eric Pooser Eric gave the report.4 KB (668 words) - 00:43, 1 April 2015
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser4 KB (557 words) - 22:03, 31 March 2015
- * '''FIU''': Puneet Khetarpal, Eric Pooser2 KB (276 words) - 22:03, 31 March 2015
- ...ab.org/doc-private/DocDB/ShowDocument?docid=2172 Start Counter Update] --- Eric Pooser8 KB (1,048 words) - 12:39, 14 March 2017
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric presented the current ideas on the mechanical assembly of the final detecto2 KB (327 words) - 18:23, 31 March 2015
- * '''FIU''': Werner Boeglin, Lei Guo, Puneet Khetarpal, Eric Pooser Eric did not receive the model of the counter from Chuck. Chuck will re-send.2 KB (321 words) - 06:42, 1 April 2015
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric has done a single photo-electron measurement on a tube to determine its gai3 KB (535 words) - 23:31, 31 March 2015
- * '''FIU''': Werner Boeglin, Puneet Khertarpal, Eric Pooser Eric went through an abridged version of the presentation he gave for the CEO of3 KB (488 words) - 14:52, 31 March 2015
- * '''FIU''': Eric Pooser Eric gave a report.4 KB (707 words) - 22:25, 31 March 2015
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser ...t at Eljen. Chuck has talked to the guy at Eljen who will run our project. Eric has also contacted Robert McNeal about plan to have Eljen do the bending.2 KB (376 words) - 18:23, 31 March 2015
- ...jlab.org/doc-private/DocDB/ShowDocument?docid=2423 Start Counter Status] - Eric Pooser10 KB (1,265 words) - 12:39, 14 March 2017
- ...jlab.org/doc-private/DocDB/ShowDocument?docid=2322 Start Counter Update] - Eric Pooser10 KB (1,327 words) - 12:38, 14 March 2017
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric is in contact with Chuck Hurlbut at Eljen and Robert McNeal (at McNeal) and3 KB (403 words) - 23:40, 31 March 2015
- * '''FIU''': Werner Boeglin, Puneet Khetarpal, Eric Pooser Eric is doing wrapping tests with the old McNeal bars. He will try lots of combi3 KB (442 words) - 21:45, 31 March 2015
- * '''FIU''': Eric Pooser Eric got feedback from Fernando Barbosa; he should include the attenuation in th4 KB (612 words) - 02:24, 1 April 2015
- ...r 4: Start Counter Calibration'' in Eric Pooser's dissertation<ref>Pooser, Eric J., "The GlueX Start Counter & Beam Asymmetry <math>\Sigma</math> in Single10 KB (1,598 words) - 13:24, 27 March 2024
- * '''FIU''': Werner Boeglin, Eric Pooser Eric reports that he re-did the gain measurement and indeed the ×5 amplifi4 KB (583 words) - 06:51, 1 April 2015
- * '''FIU''': Werner Boeglin, Eric Pooser Eric reported that Eljen has finished manufacturing five counters with a precisi3 KB (516 words) - 15:50, 31 March 2015
- * '''FIU''': Eric Pooser ...ceived. McNeal is waiting for a PO before starting machining the counters. Eric is monitoring the situation.2 KB (371 words) - 07:03, 1 April 2015
- * '''FIU''': Werner Boeglin, Eric Pooser Eric reports that the test stand design is done and is in the hands of the machi3 KB (408 words) - 23:41, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser ...l start soon. They have asked for updated drawings of scintillator pieces. Eric will contact them and check progress.3 KB (388 words) - 06:05, 1 April 2015
- ...Ito (chair), David Lawrence, Paul Mattione, Curtis Meyer, Sandy Philpott, Eric Pooser, Nathan Sparks, Justin Stevens, Simon Taylor6 KB (948 words) - 18:26, 3 February 2016
- * '''FIU''': Eric Pooser Eric described the five new counters from Eljen/McNeal. He has tested all five.3 KB (544 words) - 20:53, 31 March 2015
- # remeasure scintillation bars delayed till Eric is back3 KB (461 words) - 20:17, 31 March 2015
- * '''FIU''': Lei Guo, Eric Pooser Eric told us that the test stand will be ready by September 9th at the latest. T3 KB (409 words) - 06:35, 1 April 2015
- * '''FIU''': Eric Pooser ...September, but the counters will be far from ready for a full-system test. Eric mentioned that he has had some email dialogue with Fernando on this already3 KB (534 words) - 17:22, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser Eric gave us an update.5 KB (833 words) - 00:14, 1 April 2015
- * '''FIU''': Werner Boeglin, Eric Pooser Eric has started picking up the simulation projects that Puneet was working on,2 KB (365 words) - 22:50, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser * Eric has been browsing the McMaster catalog for parts for the assembly jig.3 KB (433 words) - 20:46, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser ...urlbut at the DNP meeting last week. Eljen has already started production. Eric estimates that they will receive everything from Eljen/McNeal in about ten4 KB (587 words) - 01:50, 1 April 2015
- Eric (Start Counter): Construction still underway.5 KB (818 words) - 06:26, 1 April 2015
- * '''FIU''': Eric Pooser2 KB (277 words) - 05:58, 1 April 2015
- Start Counter: (Eric) nothing to report regarding installation; some delay in production from El4 KB (683 words) - 11:35, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser Eric gave the report.3 KB (491 words) - 18:44, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser ...cember 16. They have arrived, but status of work is unknown at this point. Eric has been trying to get some information on that.3 KB (433 words) - 04:25, 1 April 2015
- ...Beni, Eugene, Mark, David L., Mark D. (JLab); Curtis (CMU); Justin (MIT); Eric (FIU)3 KB (416 words) - 16:29, 31 March 2015
- ...id L., Sergey F., Mike S. (JLab); Matt S. (IU); Curtis, Paul, Naomi (CMU); Eric (FIU); Justin (MIT)9 KB (1,425 words) - 17:12, 24 February 2017
- * '''FIU''': Werner Boeglin, Eric Pooser Eric reported news from McNeal that the 50 pieces of scintillator received from4 KB (623 words) - 18:17, 31 March 2015
- <td> Eric Pooser</td>2 KB (283 words) - 10:25, 20 August 2014
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann ...art-counter have been retracted from the bore. When they are re-installed, Eric will go though the Hot Checkout procedure. He did a similar some weeks ago2 KB (347 words) - 15:48, 3 December 2015
- * '''FIU''': Werner Boeglin, Eric Pooser ...the TDR contribution went out. Mark has some comments that he will send to Eric.5 KB (807 words) - 22:47, 31 March 2015
- Attending: Sean, Amiran (NU); Mark, Simon, Eugene, Beni, David L. (JLab); Eric (FIU) #* Eric has been working on the simulation code for the start counter, and is devel2 KB (364 words) - 16:29, 31 March 2015
- ...ean (NU); Simon, Paul M., Mark I., David L., Luke, Alex B., Justin (JLab); Eric, Mahmoud (FIU); Curtis, Will, Naomi (CMU); Matt S. (IU); Cristiano (MIT)7 KB (1,106 words) - 17:13, 24 February 2017
- #* Hot Check-Out (Eric) * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann2 KB (285 words) - 12:45, 28 January 2016
- * '''FIU''': Werner Boeglin, Eric Pooser * Eric has been working on the calibration procedure. He has a prototype set of cl4 KB (668 words) - 18:02, 31 March 2015
- ...lab.org/wiki/images/0/01/Start_Counter_Calibrations.pptx Start Counter] - Eric ...n, Amiran (NU); Beni, Simon, Mark, Michael S. (JLab); Curtis, Naomi (CMU); Eric (FIU); Justin (MIT)6 KB (934 words) - 17:13, 24 February 2017
- * '''FIU''': Werner Boeglin, Eric Pooser Eric gave us the update.2 KB (386 words) - 17:30, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser ...ab.org/talks/2014-2Q/Finalized_Assembly_Jig.pptx Powerpoint]) for details. Eric plans to call Chuck Hutton and discuss the design as well.5 KB (859 words) - 22:25, 31 March 2015
- * '''FIU''': Werner Boeglin, Eric Pooser We reviewed Eric's report that the scintillators had arrived at McNeal in good shape and tha3 KB (477 words) - 06:26, 1 April 2015
- ...: Mark Dalton, Mark Ito (chair), Mahmoud Kamel, Paul Mattione, Kei Moriya, Eric Pooser, Matt Shepherd, Sascha Somov, Nathan Sparks, Justin Stevens, Simon T5 KB (740 words) - 13:00, 5 October 2015
- # Detector Construction Status (Eric) * '''FIU''': Werner Boeglin, Eric Pooser4 KB (715 words) - 07:03, 1 April 2015
- # Detector Construction Status (Eric) * '''FIU''': Werner Boeglin, Eric Pooser5 KB (787 words) - 20:23, 31 March 2015
- # Detector Construction Status (Eric) * '''FIU''': Werner Boeglin, Eric Pooser3 KB (492 words) - 00:48, 1 April 2015
- # Detector Construction Status (Eric) * '''FIU''': Werner Boeglin, Anthony Llodra, Eric Pooser, Carlos Yero3 KB (457 words) - 16:40, 31 March 2015
- # Detector Construction Status (Eric) * '''FIU''': Werner Boeglin, Eric Pooser5 KB (799 words) - 17:04, 24 February 2017
- * Eric Pooser2 KB (250 words) - 15:23, 8 August 2014
- * '''FIU''': Werner Boeglin, Eric Pooser * Eric sent in start counter contribution for the [https://halldweb.jlab.org/wiki/3 KB (510 words) - 06:45, 1 April 2015
- ...DB/ShowDocument?docid=2567 Start Counter Status and Commissioning Plans] - Eric Pooser9 KB (1,171 words) - 12:38, 14 March 2017
- # Construction Status (Eric) * '''FIU''': Anthony Llodra, Eric Pooser3 KB (453 words) - 21:32, 31 March 2015
- -Eric2 KB (294 words) - 16:40, 22 August 2014
- Attending: Sean, Amiran (NU); Simon, Paul, Eric, Adesh, Will M., Mark I., Eugene (JLab); Curtis, Naomi (CMU); Justin (MIT) #* Eric reported that during start counter commissioning, a consistent rate asymmet5 KB (754 words) - 07:03, 1 April 2015
- # Construction Status (Eric)560 B (66 words) - 16:21, 31 March 2015
- * 12/04/14: ST report (Eric Pooser) [https://halldweb.jlab.org/DocDB/0026/002613/001/ST_Performance_Upd9 KB (1,250 words) - 13:05, 8 July 2021
- * Author: Eric Pooser, FIU531 B (77 words) - 15:46, 4 November 2014
- Attending: Sean, Amiran (NU); Mark I., Simon, Beni, Eric, Andrei S., Mike S., Mark D., Eugene, Elton, David L., Sergey F. (JLab); Cu8 KB (1,331 words) - 18:02, 31 March 2015
- * '''JLab''': Mark Ito, Eric Pooser Clock trigger data has already been read out. Eric has gone through the exercise of setting pedestal levels. What remains is t3 KB (388 words) - 06:10, 1 April 2015
- ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2664 Start Counter] - Eric Pooser9 KB (1,130 words) - 12:38, 14 March 2017
- .../DocDB/ShowDocument?docid=2860 Start Counter Calibration & Performance] -- Eric Pooser10 KB (1,251 words) - 12:40, 14 March 2017
- Attending: Sean, Simon, Mark I., Eugene, David. L, Mike S., Manuel, Eric, Kei, Will, Aristedes, other people in the counting room who I missed (JLab * Sean has been helping Eric start up with Start Counter software in JANA. They found a "bug" in the le7 KB (1,069 words) - 06:51, 1 April 2015
- ...Mark Ito (chair), Manuel Lara, David Lawrence, Will McGinley, Kei Moriya, Eric Pooser, Sascha Somov, Nathan Sparks, Mike Staib, Simon Taylor, Aristeidis T | ST || YES || YES || Eric working on plugin6 KB (887 words) - 06:22, 1 April 2015
- ::* Stand alone ST cosmic-self trigger (Eric, Alex, Vlad)683 B (91 words) - 09:55, 20 October 2014
- ...or would-be TOF experts along with the start counter training conducted by Eric Pooser.3 KB (455 words) - 01:06, 1 April 2015
- Sergey F., Simon T., Alex B., Eric P., Beni Z., Bryan M., David L. (chair), Dave A., Will M., Michael S., Curt3 KB (374 words) - 06:29, 1 April 2015
- ...Alex Barnes, Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Mike Staib, Simon Taylor4 KB (681 words) - 20:17, 31 March 2015
- * '''JLab''': Fernando Barbosa, Mark Ito, Eric Pooser, Beni Zihlmann Eric sent an email to Tim Whitlatch asking for survey results. He recalls that t2 KB (320 words) - 12:39, 14 March 2017
- ...Mark I., Justin, Nathan S., Will McG., Naomi, Mike S. (JLab); Paul (CMU); Eric (FIU) Eric gave a comprehensive look at the start counter. The ADC and TDC readouts a7 KB (1,204 words) - 12:38, 14 March 2017
- * '''FIU''': Eric Pooser6 KB (935 words) - 17:04, 24 February 2017
- # Calibration (Eric) * '''FIU''': Werner Boeglin, Mahmoud Kamel, Eric Pooser2 KB (296 words) - 20:27, 31 March 2015
- ...rk I., Dave M., Paul M., Will M., Curtis M., Kei M., Zisis P., Lubomir P., Eric P., Andrei S., Matt S., Elton S., ST, Justin S., Beni Z.5 KB (747 words) - 16:54, 24 February 2017
- * No other progress to report here. Sean had talked to Eric about moving some of the calibrations done at FIU into the CCDB, but a new11 KB (1,791 words) - 23:31, 31 March 2015
- == <span style="color:red">Start Counter</span> Eric. P. == ...tape in the beam path (to be done while the solid target is installed, ). (Eric P.)</span> </strike>16 KB (2,495 words) - 10:00, 19 March 2015
- * 12/04/14: ST report (Eric Pooser) [https://halldweb.jlab.org/DocDB/0026/002613/001/ST_Performance_Upd9 KB (1,250 words) - 12:38, 14 March 2017
- ...Alex Barnes, Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Simon Taylor, Beni Zihlmann9 KB (1,508 words) - 03:38, 1 April 2015
- # Calibration (Eric) * '''JLab''': Mark Ito, Eric Pooser, Simon Taylor, Beni Zihlmann2 KB (341 words) - 00:48, 1 April 2015
- Attendees: David L.(chair), Simon T., Eric P., Alex B., Sergey F., Sean D., Adesh, Kei M., Carl T., Serguei P., Bryan6 KB (955 words) - 05:58, 1 April 2015
- Attending: Sean (NU); Simon, Mike S., Paul, Mark I., Mark D., Nathan, Adesh, Eric, Alex B., Will M., Lubomir, Eugene, Beni, Kei (JLab); Curtis, Naomi (CMU); ...ng on getting the test stand calibrations into the CCDB with Sean's help. Eric is working on extract per-counter calibrations from data.7 KB (1,126 words) - 17:13, 24 February 2017
- * '''JLab''': Eugene Chudakov, Mark Ito (chair), Eric Pooser, Simon Taylor * Eric is writing a plugin that selects two paddles with exactly one hit each to m3 KB (438 words) - 07:10, 1 April 2015
- ...Barnes, Sergey Furletov, Mark Ito (chair), David Lawrence, Paul Mattione, Eric Pooser, Sascha Somov, Nathan Sparks, Simon Taylor, Beni Zihlmann4 KB (529 words) - 22:25, 31 March 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann2 KB (358 words) - 23:03, 31 March 2015
- ...ing: Sean (NU); Simon, Paul, Mike S., Manuel, Nathan, Will M., Kei, Noemi, Eric, Mark D., Alex B., Eugene (JLab); Matt S., John Z. (IU); Justin (MIT); Naom9 KB (1,402 words) - 14:46, 31 March 2015
- Attendees: David L., Simon T., Paul M., Curtis M., Alex B., Eric P., Sergey F., Sean D., Sergeui P., Alex S., Nathan S., Dave A., Beni Z.3 KB (531 words) - 06:45, 1 April 2015
- * '''JLab''': Eugene Chudakov, Mark Ito (chair), Eric Pooser, Simon Taylor ...en mislabeled. They are now fixed. This explains the anomalously low rates Eric was seeing for "counter 2" last Fall.2 KB (390 words) - 17:22, 31 March 2015
- * '''JLab''': Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Nathan Sparks, Justin Stevens, Simon Taylor6 KB (821 words) - 14:07, 6 May 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor Eric has been working on the time-walk calibration. He is doing comparisons with3 KB (520 words) - 00:43, 1 April 2015
- * Update timewalk and propogation length corrections for Start Counter (Eric) Attending: Sean (NU); Simon, Kei, Adesh, Eric, Paul, Alex, Justin, Mahmoud, Mark I., Elton, Eugene, Mike S. (JLab); Curti6 KB (1,021 words) - 15:00, 11 March 2015
- ...Alex Barnes, Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Mike Staib, Justin Stevens6 KB (932 words) - 10:54, 1 April 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Beni Zihlmann Eric gave the report.2 KB (263 words) - 14:40, 20 March 2015
- * ST - Eric is making progress in updating the timewalk and propogation corrections. H7 KB (1,198 words) - 13:50, 26 March 2015
- ...-private/DocDB/ShowDocument?docid=2729 Start Counter Calibration Update] ''Eric Pooser''9 KB (1,156 words) - 12:38, 14 March 2017
- ..., Sean Dobbs, Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Nathan Sparks, Mike Staib, Justin Stevens, Simon Taylor, Beni Zihlm4 KB (670 words) - 20:21, 15 April 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor ...he presentation. They will need 30 minutes. It will be some combination of Eric and Mahmoud.2 KB (246 words) - 14:06, 16 April 2015
- ...Sean, Simon, Adesh, Lubomir, Justin, Paul, Eugene, Will M., Beni, Alex B., Eric, Elton, Mike S., Luke, Kei (JLab); Curtis (CMU) ...of the pulse, so the pulse height is more relevant. It was suggested that Eric look at pulses characteristics as a function of position on the ST and to u9 KB (1,411 words) - 23:05, 22 April 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Beni Zihlmann * With a 200 nA beam on a 3×10<sup>-4</sup> radiator, Eric reported see rates from 100 to 200 kHz in the individual start counter sect3 KB (443 words) - 16:00, 28 April 2015
- ...lex Barnes, Amber Boehnlein, Mark Dalton, Mark Ito (chair), Paul Mattione, Eric Pooser, Nathan Sparks, Justin Stevens, Simon Taylor, Beni Zihlmann9 KB (1,358 words) - 16:44, 24 February 2017
- ...); Curtis, Naomi (CMU); Noemi (Regina); Simon, Justin, Paul, Nathan, Alex, Eric, Mark I., Mike S., Will M., Adesh, Mark D., Luke7 KB (1,098 words) - 17:12, 24 February 2017
- ...omi (CMU); Mahmoud (FIU); Simon, Kei, Beni, Nathan, Adesh, Mark I., Elton, Eric, Alex B., Fernando, Luke, Eugene, Mike S., Justin, Alex S. (JLab) Eric reported that the latest results have been revisiting the propogation corre8 KB (1,328 words) - 11:20, 27 May 2015
- Present: Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann Eric presented [https://halldweb.jlab.org/talks/2015/ST_Propagation_Time_Update.2 KB (298 words) - 17:05, 24 February 2017
- #* '''Eric''' (via email)5 KB (702 words) - 12:27, 3 June 2015
- * '''JLab''': Mark Ito (chair), David Lawrence, Kei Moriya, Eric Pooser, Simon Taylor, Beni Zihlmann Eric told us that he has a [http://pooser.fiu.edu/wiki/index.php/GlueX_Analysis_5 KB (746 words) - 16:58, 24 February 2017
- ...the square root of χ<sup>2</sup>). Sean suggested that George contact Eric Pooser who faced a similar issue, and ended using Minuit. Next, values of5 KB (866 words) - 12:58, 11 June 2015
- Attending: Sean (NU); Simon, Beni, Luke, Adesh, Eric, Lubomir, Greg (JLab); Naomi, Will M. (CMU) # '''Start Counter''' - Eric reported that they have concluded that there is not enough beam data to per5 KB (866 words) - 12:19, 17 June 2015
- ...S., Will M., Naomi (CMU); Simon, Adesh, Beni, Matt, Kei, Mahmoud, Justin, Eric, Alex B., Fernando, Luke, Mark I., Paul, Elton, Mark D. Eric listed a number of projects he is working on:8 KB (1,280 words) - 17:34, 14 July 2015
- * '''JLab''': Mahmoud Kamel, Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann ...difference and compare it to the difference in light propagation distance. Eric has a new fitting procedure: first cut the data into slices in z, fit each4 KB (559 words) - 12:03, 15 July 2015
- ...ark Dalton, Mark Ito (chair), David Lawrence, Paul Mattione, Curtis Meyer, Eric Pooser, Matt Shepherd, Justin Stevens, Simon Taylor, Beni Zihlmann8 KB (1,159 words) - 13:23, 10 July 2015
- Attending: Sean (NU); Simon, Beni, Mark I., Justin, Eric, Lubomir, Paul, Eugene, Adesh, Mark D. (JLab); Curtis, Will M., Mike S. (CM Eric is working on rechecking the time resolution for tracks with a match in the11 KB (1,662 words) - 17:13, 24 February 2017
- ...dweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2777 Talk] presented by Eric Pooser1,002 B (145 words) - 17:13, 24 February 2017
- ...Barnes, Amber Boehnlein, Mark Ito (chair), David Lawrence, Paul Mattione, Eric Pooser, Matt Shepherd, Nathan Sparks, Simon Taylor, Beni Zihlmann9 KB (1,405 words) - 12:29, 23 July 2015
- Eric reported that he has finished his propagation time correction studies, and6 KB (937 words) - 17:12, 24 February 2017
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann Eric noted that the next step was to write a GlueX Note describing the current c3 KB (394 words) - 17:13, 24 February 2017
- ...Mark Dalton, Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Nathan Sparks, Justin Stevens, Simon Taylor, Beni Zihlmann11 KB (1,734 words) - 17:16, 6 August 2015
- Attendees: David L. (chair), Simon T., Eric P., Curtis M., Dave A., Beni Z., Hovanes E., Sergey F., Bryan M., Alex S.5 KB (843 words) - 14:47, 13 August 2015
- ...J., Mahmoud K., Dave M., Paul M., Will M., Curtis M., Kei M., Lubomir P., Eric P., Luke R., Matt S., Elton S., Mike S., Justin S., Nathan S., Adesh S., Si4 KB (623 words) - 17:07, 24 February 2017
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor * Eric has started on the GlueX Note describing the calibration procedure.3 KB (483 words) - 18:06, 14 August 2015
- ...uke, Justin, Elton, Mark I. (JLab); Curtis, Will M., Naomi, Mike S. (CMU); Eric, Mahmoud (FIU); Brad (FSU) #* '''SC''' - Eric has modified HDGeant to have paddle-by-paddle attenuation length and propog6 KB (867 words) - 16:51, 24 February 2017
- ...Justin, Nathan, Beni, Paul, Fernando (JLab); Curtis, Will M, Naomi (CMU); Eric, Mahmoud (FIU); Brad (FSU)6 KB (964 words) - 14:39, 9 September 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann Eric thought that based on his experience with using one run, run 2931 (8 hours3 KB (461 words) - 17:13, 24 February 2017
- ...n, Mark Dalton, Sean Dobbs, Mark Ito (chair), Paul Mattione, Curtis Meyer, Eric Pooser, Nathan Sparks, Justin Stevens, Simon Taylor7 KB (1,117 words) - 12:36, 14 October 2015
- ...r Boehnlein, Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Eric Pooser, Nathan Sparks, Simon Taylor, Beni Zihlmann8 KB (1,307 words) - 13:37, 13 October 2015
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann * Eric and Mahmoud will be making the presentations at the meeting. Eric on calibration, Mahmoud on efficiency.2 KB (231 words) - 12:38, 14 March 2017
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann Eric is back in action in Newport News and will be working on the NIM paper.2 KB (375 words) - 15:24, 3 June 2016
- Eric has been busy with time-critical tasks in Hall C. That said, document produ4 KB (567 words) - 17:00, 24 February 2017
- * Mark will contact Eric Pooser and see if he can help us with physical check-out in the Hall.3 KB (409 words) - 17:44, 27 August 2016
- Mark, Eric Pooser, Tom Carstens, and Stephanie Worthington cabled up the start counter3 KB (395 words) - 19:09, 29 September 2016
- * '''JLab''': Thomas Britton, Mark Ito (chair), Paul Mattione, Eric Pooser, Simon Taylor Eric has started on writing the NIM-article/TCR. In parallel he will put togethe3 KB (475 words) - 15:16, 2 November 2016
- Mark went through Hot Check-Out for the start counter. Eric Pooser and Mahmoud both looked at the histograms from the cosmic test run a3 KB (460 words) - 16:48, 18 November 2016
- * Werner talked to Eric Pooser about the Start Counter NIM paper. Eric is busy with the KPP run in Hall C at the moment; when that is over he will2 KB (345 words) - 14:58, 27 January 2017
- * '''JLab''': Thomas Britton, Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann Eric has a draft of the NIM paper. Currently, the files are stored in [https://g3 KB (435 words) - 12:47, 20 April 2017
- * '''JLab''': Thomas Britton, Mark Ito (chair), Eric Pooser, Simon Taylor3 KB (446 words) - 15:45, 14 June 2017
- * '''JLab''': Thomas Britton, Mark Ito (chair), Eric Pooser, Simon Taylor2 KB (312 words) - 14:33, 20 June 2017
- * '''JLab''': Mark Ito (chair), Eric Pooser, Simon Taylor, Beni Zihlmann Eric has received comments on the draft from Werner. He will incorporate them as3 KB (418 words) - 15:57, 29 June 2017
- * '''JLab''': Eugene Chudakov, Mark Ito (chair), Eric Pooser, Thomas Britton Eric reported on the status of the NIM paper.2 KB (335 words) - 17:06, 28 July 2017
- Mark reported status as told to him by Eric Pooser prior to the meeting. ...ome significant computer file archaeology involved, but this work is done. Eric should be done with his parts of the paper by this week.4 KB (559 words) - 16:09, 25 August 2017
- * Werner recently sent some final plots to Eric Pooser for the ''' NIM paper.''' The FIU folks want to get together one mor4 KB (640 words) - 21:05, 1 November 2017
- Eric Pooser has [https://mailman.jlab.org/mailman/private/gluex-collaboration/202 KB (215 words) - 18:37, 10 March 2018
- Werner reported that Eric Pooser has been busy with software presentations lately and that work will2 KB (359 words) - 19:56, 28 June 2018
- Both Werner and Mark spoke with Eric Pooser yesterday. He has been sidetracked with requests from Hall A/C manag2 KB (330 words) - 13:50, 27 July 2018
- ...sees scalers counting. The GUI is reporting abnormally high temperatures; Eric Pooser attributes that to a loose cable connection. The target is scheduled .../gluex_documents GlueX documents repository] and successfully built there. Eric is in the process of incorporating comments received from Elton Smith and B2 KB (300 words) - 13:06, 9 August 2018
- Mark reported that Eric Pooser has nearly completed putting in the edits from Elton and Beni and ha2 KB (289 words) - 19:41, 18 October 2018
- Eric Pooser has produced a new draft incorporating comments from Beni and Elton3 KB (504 words) - 14:27, 21 October 2018
- * After discussions with Eric Pooser, Mark decided on a deadline of Friday, December 7 for edits and sugg1 KB (211 words) - 17:04, 15 November 2018
- The December 7th deadline for comments has come and gone. Eric has produced a new draft, incorporating comments from Simon, Beni, and Mark3 KB (445 words) - 12:50, 13 December 2018
- ...ss, submitted it the the arXiv, and submitted it to NIM. Just this morning Eric reported that the arXiv has assigned a temporary submission identifier, sub3 KB (398 words) - 17:13, 13 January 2019
- ...ful if someone ever has to disassemble/reassemble the start counter. (from Eric)585 B (92 words) - 16:49, 12 March 2020
- | Eric Habjan || UConn || Undergraduate || No8 KB (1,072 words) - 19:33, 22 November 2022
- ...books.jlab.org/entry/4035629 Lock Config vs. Hall D Vertical Orbit Drift] (Eric)10 KB (1,396 words) - 09:44, 31 August 2022