Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #501 to #1,000.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. CDC prototype fADC data
  2. CDC prototype flowrates
  3. CDC prototype more on timing
  4. CDC prototype more on timing 2
  5. CDC prototype more on timing 3
  6. CDC prototype runs at CMU
  7. CDC prototype tilted
  8. CDC q vs n
  9. CDC readout requirements
  10. CDC recent run drift times
  11. CDC run 1282 noise
  12. CDC run 1603 strawless ch
  13. CDC run 2016 drift time fits
  14. CDC run 2055
  15. CDC run 2551
  16. CDC run 2551 drift time fits
  17. CDC run 970
  18. CDC run 985
  19. CDC straight straws
  20. CDC straw number index
  21. CDC threshold scan procedure
  22. CDC tilted detectors
  23. CDC tilted detectors summary
  24. CDC time spikes
  25. CDC track angles (range of theta)
  26. CDC tracked and untracked cosmics
  27. CDC tracked and untracked cosmics 1950
  28. CDC tracked cosmics
  29. CDC transfer func attempt
  30. CDC wiggle wire positions
  31. CERNLIB Installation
  32. CFD Diff
  33. CFD Fifth - 90"
  34. CFD First - 50"
  35. CFD Fourth - 70"
  36. CFD Left
  37. CFD Right
  38. CFD Second - 10"
  39. CFD Sum
  40. CFD Third - 30"
  41. CHESS X-ray measurements 5/2009
  42. CHESS X-ray measurements 5/2011
  43. CLARA and Service Oriented Architectures
  44. CMU - Naomi's secondary event readout file
  45. CMU - fADC125
  46. CMU CLEAN ROOM
  47. CMU Data Challenge 2
  48. CMsgRootConsumer.cc
  49. CMsgRootMakefile
  50. CMsgRootProducer.cc
  51. CODA include file distribution problem
  52. CPP-NPP DAQ Configuration
  53. CPP-NPP Experimental Controls
  54. CPP-NPP Tagger Microscope
  55. CPP-NPP Target
  56. CPP-NPP Trigger
  57. CPP/NPP (2022-05) BCAL pi0 calibration
  58. CPP Beam Test Feb. 2019
  59. CPP Beam Test Spring 2018
  60. CPP Calibration Studies
  61. CPP DAQ/CPP AIEC config
  62. CPP Run Coverage Summer 2022
  63. CPP Scintillators
  64. CPPsim
  65. CRYTUR
  66. CRYTUR Crystal Size and Visual Inspection
  67. CRY Event Generator
  68. CTOF ADC response
  69. CTOF Delta T
  70. CTOF Timing
  71. Cables and Crates
  72. Calib 20160601
  73. Calibration 20140212 BCALComments
  74. Calibration Constants, Tagged Versions
  75. Calibration Dashboard
  76. Calibration Procedures
  77. Calibration Status
  78. Calibration Workflow
  79. Cart Interlock System
  80. Cart Operation Plan
  81. Cart Safety Review
  82. Channel Mapping
  83. Charge division
  84. Charge to the committee
  85. Checking the FCAL gains
  86. Checking the gain
  87. Checklist for splitting sim-recon
  88. Chi-squared tracker
  89. Chip Watson E-mail from April 11,2012
  90. ClueX/PrimEx 2008-08-27
  91. Coding Conventions
  92. Coil Test Weekly Meeting 1-Apr-2010
  93. Coil Test Weekly Meeting 10-Jun-2010
  94. Coil Test Weekly Meeting 14-Oct-2010
  95. Coil Test Weekly Meeting 15-Apr-2010
  96. Coil Test Weekly Meeting 15-Jul-2010
  97. Coil Test Weekly Meeting 16-Jul-2009
  98. Coil Test Weekly Meeting 16-Sep-2010
  99. Coil Test Weekly Meeting 17-Dec-2010
  100. Coil Test Weekly Meeting 17-Jun-2010
  101. Coil Test Weekly Meeting 18-Mar-2010
  102. Coil Test Weekly Meeting 19-Aug-2010
  103. Coil Test Weekly Meeting 2-Jul-2009
  104. Coil Test Weekly Meeting 2-Sep-2010
  105. Coil Test Weekly Meeting 20-May-2010
  106. Coil Test Weekly Meeting 22-Jul-2010
  107. Coil Test Weekly Meeting 23-Jul-2009
  108. Coil Test Weekly Meeting 23-Sep-2010
  109. Coil Test Weekly Meeting 24-Jun-2010
  110. Coil Test Weekly Meeting 25-Mar-2010
  111. Coil Test Weekly Meeting 26-Aug-2010
  112. Coil Test Weekly Meeting 27-May-2010
  113. Coil Test Weekly Meeting 29-Apr-2010
  114. Coil Test Weekly Meeting 29-Jul-2010
  115. Coil Test Weekly Meeting 3-Dec-2010
  116. Coil Test Weekly Meeting 3-Jun-2010
  117. Coil Test Weekly Meeting 30-Sep-2010
  118. Coil Test Weekly Meeting 4-Nov-2010
  119. Coil Test Weekly Meeting 5-Aug-2010
  120. Coil Test Weekly Meeting 6-May-2010
  121. Coil Test Weekly Meeting 7-Oct-2010
  122. Coil Test Weekly Meeting 8-Apr-2010
  123. Coil Test Weekly Meeting 9-Jul-2009
  124. Coincidence Counting Oscilloscope Readings
  125. Collimation System
  126. CollimatorMtgs-1-14-2013
  127. CollimatorMtgs-3-5-2013
  128. CollimatorMtgs-6-8-2015
  129. CollimatorMtgs-7-31-2013
  130. Collimator Cave
  131. Collimator cave background
  132. Comments from C.A. Meyer
  133. Comments from M.M. Ito on FADC FCAL NIM 2010
  134. Comments from Y. Van Haarlem
  135. Comments on draft 1 of pac presentation
  136. Commissioning Calibration Data
  137. Commissioning Event Rates
  138. Commissioning Run, Fall 2018
  139. Commissioning beam
  140. Common beam properties interface for generators
  141. CompCal Construction
  142. Comparison of March 2007 and March 2008 Resolutions
  143. Comparison of radiation damage between FLUKA and Geant
  144. Compilers 10-apr-2013
  145. Compressed-format-27-apr-2013
  146. Compton Calorimeter
  147. Compton Cross Section Systematic
  148. Compton photoproduction off electron
  149. Configuration Management
  150. Configuring Future Simulations
  151. Connect to ZoomGov Meetings
  152. Connecting an EVO meeting to an ESNet meeting
  153. Connection to Jlab meetings
  154. Constants to Review
  155. Construction plan 1/1/2020 - 30/8/2020
  156. Construction schedule milestones
  157. Controls-status-8-aug-2008
  158. Controls Meeting 03-May-2018
  159. Controls Meeting 06-Sep-2018
  160. Controls Meeting 08-Feb-2018
  161. Controls Meeting 08-Mar-2018
  162. Controls Meeting 09-Aug-2018
  163. Controls Meeting 1-Jun-2023
  164. Controls Meeting 1-Nov-2018
  165. Controls Meeting 1-Oct-2020
  166. Controls Meeting 1-Sep-2016
  167. Controls Meeting 10-Dec-2015
  168. Controls Meeting 10-Jan-2019
  169. Controls Meeting 10-Nov-2016
  170. Controls Meeting 11-Aug-2011
  171. Controls Meeting 11-Jul-2019
  172. Controls Meeting 11-Jun-2020
  173. Controls Meeting 11-May-2017
  174. Controls Meeting 11-Nov-2015
  175. Controls Meeting 12-Aug-2021
  176. Controls Meeting 12-Jul-2018
  177. Controls Meeting 12-May-2016
  178. Controls Meeting 13-Dec-2018
  179. Controls Meeting 13-Jun-2019
  180. Controls Meeting 13-Oct-2016
  181. Controls Meeting 14-Jun-2018
  182. Controls Meeting 14-May-2015
  183. Controls Meeting 14-Nov-2019
  184. Controls Meeting 14-Sep-2017
  185. Controls Meeting 15-Nov-2018
  186. Controls Meeting 15-Oct-2015
  187. Controls Meeting 16-Mar-2017
  188. Controls Meeting 16-Mar-2023
  189. Controls Meeting 17-Aug-2017
  190. Controls Meeting 17-Mar-2016
  191. Controls Meeting 17-May-2018
  192. Controls Meeting 17-Oct-2019
  193. Controls Meeting 18-Oct-2018
  194. Controls Meeting 19-Jan-2017
  195. Controls Meeting 19-Sep-2019
  196. Controls Meeting 2-Apr-2015
  197. Controls Meeting 2-Mar-2017
  198. Controls Meeting 2-May-2019
  199. Controls Meeting 20-Aug-2015
  200. Controls Meeting 20-Feb-2020
  201. Controls Meeting 20-Jul-2016
  202. Controls Meeting 20-Sep-2018
  203. Controls Meeting 21-Aug-2014
  204. Controls Meeting 21-Aug-2019
  205. Controls Meeting 21-Jul-2016
  206. Controls Meeting 21-Mar-2019
  207. Controls Meeting 22-Apr-2021
  208. Controls Meeting 22-Aug-2019
  209. Controls Meeting 22-Jan-2015
  210. Controls Meeting 22-Jul-2021
  211. Controls Meeting 22-Jun-2017
  212. Controls Meeting 22-Jun-2023
  213. Controls Meeting 22-Mar-2018
  214. Controls Meeting 23-Feb-2023
  215. Controls Meeting 23-Jan-2020
  216. Controls Meeting 23-Jul-2015
  217. Controls Meeting 23-Jun-2016
  218. Controls Meeting 23-Mar-2023
  219. Controls Meeting 24-Jan-2019
  220. Controls Meeting 24-Jul-2014
  221. Controls Meeting 24-Jun-2015
  222. Controls Meeting 24-Jun-2021
  223. Controls Meeting 24-Mar-2022
  224. Controls Meeting 25-Apr-2024
  225. Controls Meeting 25-Feb-2021
  226. Controls Meeting 25-Jan-2018
  227. Controls Meeting 25-Jan-2024
  228. Controls Meeting 25-Jul-2019
  229. Controls Meeting 25-Jun-2015
  230. Controls Meeting 25-Mar-2021
  231. Controls Meeting 26-Jan-2023
  232. Controls Meeting 26-May-2016
  233. Controls Meeting 26-Oct-2017
  234. Controls Meeting 26-Oct-2023
  235. Controls Meeting 27-Jan-2022
  236. Controls Meeting 27-Jun-2019
  237. Controls Meeting 28-Apr-2016
  238. Controls Meeting 28-Apr-2022
  239. Controls Meeting 28-Jan-2021
  240. Controls Meeting 28-Jul-2022
  241. Controls Meeting 28-Jun-2018
  242. Controls Meeting 28-May-2015
  243. Controls Meeting 28-Sep-2017
  244. Controls Meeting 28-Sep-2023
  245. Controls Meeting 29-Oct-2020
  246. Controls Meeting 29-Sep-2022
  247. Controls Meeting 3-Aug-2017
  248. Controls Meeting 30-Mar-2017
  249. Controls Meeting 30-May-2019
  250. Controls Meeting 30-Nov-2023
  251. Controls Meeting 31-Aug-2017
  252. Controls Meeting 31-Oct-2019
  253. Controls Meeting 4-Apr-2019
  254. Controls Meeting 4-Aug-2016
  255. Controls Meeting 4-Feb-2016
  256. Controls Meeting 4-Sep-2014
  257. Controls Meeting 5-Feb-2015
  258. Controls Meeting 5-Jan-2017
  259. Controls Meeting 7-Aug-2014
  260. Controls Meeting 7-Feb-2019
  261. Controls Meeting 7-Jan-2016
  262. Controls Meeting 8-Aug-2019
  263. Controls Meeting 8-Jan-2015
  264. Controls Meeting 8-Jun-2017
  265. Controls Meeting 9-Jul-2020
  266. Controls Meeting 9-Jun-2016
  267. Controls Meeting 9-Nov-2017
  268. Controls To Do List
  269. Converting sim-recon tags and branches to the split repositories
  270. Cosmic Particle Oscilloscope Coincidence Test
  271. Cosmic Particle Oscilloscope Readings
  272. Cosmic Particle Oscilloscope Readings (Lower Threshold)
  273. Cosmic ray test stand setup
  274. Counter Repair, Summer 2019
  275. Counting House
  276. Counting House DAQ
  277. Crate and channel assignment
  278. Crate data rates
  279. Cross check yields
  280. Crystal QA Check using Pair Spectrometer
  281. Curtis on DC-1
  282. Cut open straws
  283. DAC Calibration
  284. DANA objects
  285. DAQTree plugin
  286. DAQ Controller diskless setup
  287. DAQ Outline for May 2008
  288. DAQ Tasks for Spring 2015 Commissioning Run
  289. DAQ settings
  290. DAQ test computer
  291. DE/dx 250 MeV pions/kaons
  292. DE/dx 350 MeV pions/koans/protons
  293. DE/dx 350 MeV pions/protons
  294. DEPRECATED Offline Monitoring Archived Data
  295. DIRC CCDB Tables
  296. DIRC LV Power Cycling Schedule
  297. DIRC Planning for FY16
  298. DIRC Readout
  299. DIRC Software Tasks
  300. DIRC Spare Parts and Storage location
  301. DNP-2014 abstract submitted by Richard Jones
  302. DNP 2020 Planning
  303. DOE Medium Energy 2010
  304. DSelector SWIF Jobs
  305. Daq test stand-22-aug-2008
  306. Data Challenge 1
  307. Data Challenge 2 Event Tally Board
  308. Data Challenge 3
  309. Data Monitoring Database
  310. Data Plan Meeting, February 13, 2014
  311. Data Skimming
  312. Dec. 13, 2007 Tracking CDC/FDC
  313. Dec 1, 2011 SiPM Electrical and Cooling
  314. Dec 10, 2009 Calorimetry
  315. Dec 10, 2010 SiPM Electrical and Cooling
  316. Dec 11,2012 Readout
  317. Dec 11, 2013 Design Meeting
  318. Dec 13, 2013 Design Meeting
  319. Dec 14, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  320. Dec 16
  321. Dec 16, 2010 Readout
  322. Dec 2, 2010 Readout
  323. Dec 20, 2010 Replacement Solenoid
  324. Dec 2019 Simulation branches
  325. Dec 5, 2011 SiPM Electrical and Cooling
  326. Dec 5, 2023 HallD AI/ML meeting
  327. Dec 6, 2019 Engineering Group Meeting
  328. Dec 7, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  329. Dec 9, 2022
  330. December10, 2013
  331. December 02, 2011 Design Meeting
  332. December 02, 2021 CPP Design Meeting
  333. December 02, 2022 Tech group meeting
  334. December 09, 2021 KLONG Design Meeting
  335. December 1, 2008 Trackine CDC/FDC
  336. December 1, 2022
  337. December 10, 2010 Des/Fab Meeting
  338. December 10, 2019 FCAL Insert Design Meeting
  339. December 12, 2016
  340. December 14, 2009 Tracking CDC/FDC
  341. December 14, 2023
  342. December 15, 2008 Tracking CDC/FDC
  343. December 15, 2022
  344. December 16, 2013, Physics Working Group
  345. December 16, 2022 Tech group meeting
  346. December 17, 2012 (11:30AM), Physics Working Group
  347. December 17, 2013 Tracking FADC
  348. December 17, 2020 CPP Design Meeting
  349. December 18, 2009 CDC Meeting
  350. December 18, 2013 Calibration
  351. December 19, 2011 (11:30AM), Physics Working Group
  352. December 19, 2012 tracking CDC/FDC
  353. December 2, 2013, Physics Working Group
  354. December 2, 2014
  355. December 2, 2020
  356. December 21, 2011 Tracking CDC/FDC
  357. December 22,2010 Tracking CDC/FDC
  358. December 22, 2022
  359. December 29, 2022
  360. December 3, 2010 Des/Fab Meeting
  361. December 3, 2012 (11:30AM), Physics Working Group
  362. December 3, 2020 CPP Design Meeting
  363. December 4, 2006 Software
  364. December 4, 2013 Calibration
  365. December 6, 2010 (11AM), Physics Working Group
  366. December 7, 2011 Tracking CDC/FDC
  367. December 7, 2012
  368. December 7. 2023
  369. December 8, 2022
  370. December 9, 2011 Fab Meeting
  371. Ded
  372. Defining role of Physics Coordinator
  373. Deprecated: Computer Farms
  374. Deprecated: JANA/DANA
  375. Deprecated: Kinematic Fitter
  376. Deprecated: Offline Projects
  377. Deprecated: RSS Feeds
  378. Depth-Sensitive Diamond Topography
  379. Design of an asymmetric monochromator
  380. Detailed L3 Beam Test Plan Spring 2017
  381. Detailed sub-periods
  382. Detector Alignment
  383. Detector Rates and Lifetime
  384. Detector naming scheme
  385. Device for finding/verifying the beam plane location
  386. Diagnosing segmentation faults in reconstruction software
  387. Dimensions
  388. Dinner 18:00
  389. Dinner 18:00 ( Das Waldcafe)
  390. Dinner 18:30
  391. Discussion about the X-ray beam divergence
  392. Discussion of e+/e- tertiary beams in Hall D
  393. Discussion with Serguei Gevorkyan / Mon Apr 13
  394. Disk Space for Hall D at JLab
  395. Display Management Framework Options
  396. Divider test
  397. Dose Calculation
  398. Double Regge Exchange Meeting
  399. Draft By-law on Shift-taking
  400. Draft Start Counter Commissioning Plan
  401. Drawings Awaiting Release
  402. Drift Chamber Gas System
  403. Drift time comparison (gas check)
  404. Dump solenoid plc archive data
  405. E+e- Pair Production off target
  406. ECAL Controllers and VTPs
  407. ECAL IP addresses and names
  408. EM background rate studies
  409. EPICS archiving with MYA
  410. ESH&Q
  411. ESNET Registration
  412. EVO and H.323 Client
  413. EVO general
  414. Earth Magnetic Field
  415. Electron trajectories
  416. Electronic chain simulation
  417. Electronics: CFD delay and treshold
  418. Electronics Action Items
  419. Electronics Outline for May 2008
  420. Electronics Testing Readiness Review Checklist
  421. Electronics Workshops/Pre-Meetings
  422. Elton Smith - The 12 GeV JLab Upgrade Project
  423. Email from Richard Jones (06/14/2021)
  424. Email from Vanderhaeghen
  425. Email sent by David on April 13, 2012
  426. Emittance measurements
  427. Energy/Amplitude as a function of drift time
  428. Energy Resolution Plot
  429. Energy threshold for various assumed PDE and DR combinations
  430. Errors from hd dump
  431. EventStore File Formats
  432. EventStore Run Metadata
  433. EventStore Table Definitions
  434. Event Analyzer
  435. Event generators
  436. Event pics
  437. Example CCDB session
  438. Example of Monitoring Histogram Email
  439. Excursions in Hall D beam positions
  440. Exotic Review
  441. ExpDocs Introduction
  442. Expected Statistics for GlueX
  443. Experiment Readiness Review
  444. Experiment Readiness Review 2016
  445. Experiment Readiness Review 2017
  446. Experiment Readiness Review 2020
  447. Experimental Hall-D
  448. Experimental Sensitivity to Solenoidal Field
  449. Explanation of ROOT tree leaves
  450. F125ADC Tests with FDC
  451. F425962
  452. FA125 Meeting May 13, 2016
  453. FA125 chip occupancy
  454. FA125 firmware check
  455. FA125 firmware check 2.00D+
  456. FADC250 Firmware Versions
  457. FADC 250
  458. FADC Emulation Meeting, August 26, 2015
  459. FADC algorithm
  460. FADC timing
  461. FCAL-Insert
  462. FCALLeadGlass
  463. FCALPMT
  464. FCAL Beamtest Geometry
  465. FCAL Beamtest Setup Pictures
  466. FCAL Construction Readiness Review Checklist
  467. FCAL DAQ Meetings
  468. FCAL GEANT simulations http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf
  469. FCAL HV scan
  470. FCAL Magnetic Shield Design
  471. FCAL Readout Electronics
  472. FCAL Reconstruction 04/08/2012
  473. FCAL Reconstruction MIN BLOCK 04/24/2012
  474. FCAL Reconstruction in b1pi events 03/06/2012
  475. FCAL preparation status
  476. FCAL timing 7/1/15
  477. FDC Beam hole size
  478. FDC Nominal Design Parameters
  479. FDC Overview
  480. FDC Readiness Agenda
  481. FDC Readiness Checklist
  482. FDC Test
  483. FDC geometry May09
  484. FDC geometry study
  485. FDC procedures
  486. FDC prototype magnet test status (Simon T.)
  487. FDC tilt/alignment update
  488. FSRoot
  489. FSU Data Challenge 2
  490. Fall-2018-Running
  491. Fall 2015
  492. Fall 2015 Commissioning Plan
  493. Fall 2015 spring 2016
  494. Fall 2016
  495. Fall 2016 High Intensity/L3 beam test
  496. Fall 2016 Run time charts
  497. Fall 2016 Run time charts nogoni
  498. Fall 2016 Run time charts progress
  499. Fall 2019 TRD/GEM Commissioning
  500. Fall 2022 Run Coordination Meetings

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)