Dead-end pages
From GlueXWiki
The following pages do not link to other pages in GlueXWiki.
Showing below up to 500 results in range #501 to #1,000.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- CDC prototype fADC data
- CDC prototype flowrates
- CDC prototype more on timing
- CDC prototype more on timing 2
- CDC prototype more on timing 3
- CDC prototype runs at CMU
- CDC prototype tilted
- CDC q vs n
- CDC readout requirements
- CDC recent run drift times
- CDC run 1282 noise
- CDC run 1603 strawless ch
- CDC run 2016 drift time fits
- CDC run 2055
- CDC run 2551
- CDC run 2551 drift time fits
- CDC run 970
- CDC run 985
- CDC straight straws
- CDC straw number index
- CDC threshold scan procedure
- CDC tilted detectors
- CDC tilted detectors summary
- CDC time spikes
- CDC track angles (range of theta)
- CDC tracked and untracked cosmics
- CDC tracked and untracked cosmics 1950
- CDC tracked cosmics
- CDC transfer func attempt
- CDC wiggle wire positions
- CERNLIB Installation
- CFD Diff
- CFD Fifth - 90"
- CFD First - 50"
- CFD Fourth - 70"
- CFD Left
- CFD Right
- CFD Second - 10"
- CFD Sum
- CFD Third - 30"
- CHESS X-ray measurements 5/2009
- CHESS X-ray measurements 5/2011
- CLARA and Service Oriented Architectures
- CMU - Naomi's secondary event readout file
- CMU - fADC125
- CMU CLEAN ROOM
- CMU Data Challenge 2
- CMsgRootConsumer.cc
- CMsgRootMakefile
- CMsgRootProducer.cc
- CODA include file distribution problem
- CPP-NPP DAQ Configuration
- CPP-NPP Experimental Controls
- CPP-NPP Tagger Microscope
- CPP-NPP Target
- CPP-NPP Trigger
- CPP/NPP (2022-05) BCAL pi0 calibration
- CPP Beam Test Feb. 2019
- CPP Beam Test Spring 2018
- CPP Calibration Studies
- CPP DAQ/CPP AIEC config
- CPP Run Coverage Summer 2022
- CPP Scintillators
- CPPsim
- CRYTUR
- CRYTUR Crystal Size and Visual Inspection
- CRY Event Generator
- CTOF ADC response
- CTOF Delta T
- CTOF Timing
- Cables and Crates
- Calib 20160601
- Calibration 20140212 BCALComments
- Calibration Constants, Tagged Versions
- Calibration Dashboard
- Calibration Procedures
- Calibration Status
- Calibration Workflow
- Cart Interlock System
- Cart Operation Plan
- Cart Safety Review
- Channel Mapping
- Charge division
- Charge to the committee
- Checking the FCAL gains
- Checking the gain
- Checklist for splitting sim-recon
- Chi-squared tracker
- Chip Watson E-mail from April 11,2012
- ClueX/PrimEx 2008-08-27
- Coding Conventions
- Coil Test Weekly Meeting 1-Apr-2010
- Coil Test Weekly Meeting 10-Jun-2010
- Coil Test Weekly Meeting 14-Oct-2010
- Coil Test Weekly Meeting 15-Apr-2010
- Coil Test Weekly Meeting 15-Jul-2010
- Coil Test Weekly Meeting 16-Jul-2009
- Coil Test Weekly Meeting 16-Sep-2010
- Coil Test Weekly Meeting 17-Dec-2010
- Coil Test Weekly Meeting 17-Jun-2010
- Coil Test Weekly Meeting 18-Mar-2010
- Coil Test Weekly Meeting 19-Aug-2010
- Coil Test Weekly Meeting 2-Jul-2009
- Coil Test Weekly Meeting 2-Sep-2010
- Coil Test Weekly Meeting 20-May-2010
- Coil Test Weekly Meeting 22-Jul-2010
- Coil Test Weekly Meeting 23-Jul-2009
- Coil Test Weekly Meeting 23-Sep-2010
- Coil Test Weekly Meeting 24-Jun-2010
- Coil Test Weekly Meeting 25-Mar-2010
- Coil Test Weekly Meeting 26-Aug-2010
- Coil Test Weekly Meeting 27-May-2010
- Coil Test Weekly Meeting 29-Apr-2010
- Coil Test Weekly Meeting 29-Jul-2010
- Coil Test Weekly Meeting 3-Dec-2010
- Coil Test Weekly Meeting 3-Jun-2010
- Coil Test Weekly Meeting 30-Sep-2010
- Coil Test Weekly Meeting 4-Nov-2010
- Coil Test Weekly Meeting 5-Aug-2010
- Coil Test Weekly Meeting 6-May-2010
- Coil Test Weekly Meeting 7-Oct-2010
- Coil Test Weekly Meeting 8-Apr-2010
- Coil Test Weekly Meeting 9-Jul-2009
- Coincidence Counting Oscilloscope Readings
- Collimation System
- CollimatorMtgs-1-14-2013
- CollimatorMtgs-3-5-2013
- CollimatorMtgs-6-8-2015
- CollimatorMtgs-7-31-2013
- Collimator Cave
- Collimator cave background
- Comments from C.A. Meyer
- Comments from M.M. Ito on FADC FCAL NIM 2010
- Comments from Y. Van Haarlem
- Comments on draft 1 of pac presentation
- Commissioning Calibration Data
- Commissioning Event Rates
- Commissioning Run, Fall 2018
- Commissioning beam
- Common beam properties interface for generators
- CompCal Construction
- Comparison of March 2007 and March 2008 Resolutions
- Comparison of radiation damage between FLUKA and Geant
- Compilers 10-apr-2013
- Compressed-format-27-apr-2013
- Compton Calorimeter
- Compton Cross Section Systematic
- Compton photoproduction off electron
- Configuration Management
- Configuring Future Simulations
- Connect to ZoomGov Meetings
- Connecting an EVO meeting to an ESNet meeting
- Connection to Jlab meetings
- Constants to Review
- Construction plan 1/1/2020 - 30/8/2020
- Construction schedule milestones
- Controls-status-8-aug-2008
- Controls Meeting 03-May-2018
- Controls Meeting 06-Sep-2018
- Controls Meeting 08-Feb-2018
- Controls Meeting 08-Mar-2018
- Controls Meeting 09-Aug-2018
- Controls Meeting 1-Jun-2023
- Controls Meeting 1-Nov-2018
- Controls Meeting 1-Oct-2020
- Controls Meeting 1-Sep-2016
- Controls Meeting 10-Dec-2015
- Controls Meeting 10-Jan-2019
- Controls Meeting 10-Nov-2016
- Controls Meeting 11-Aug-2011
- Controls Meeting 11-Jul-2019
- Controls Meeting 11-Jun-2020
- Controls Meeting 11-May-2017
- Controls Meeting 11-Nov-2015
- Controls Meeting 12-Aug-2021
- Controls Meeting 12-Jul-2018
- Controls Meeting 12-May-2016
- Controls Meeting 13-Dec-2018
- Controls Meeting 13-Jun-2019
- Controls Meeting 13-Oct-2016
- Controls Meeting 14-Jun-2018
- Controls Meeting 14-May-2015
- Controls Meeting 14-Nov-2019
- Controls Meeting 14-Sep-2017
- Controls Meeting 15-Nov-2018
- Controls Meeting 15-Oct-2015
- Controls Meeting 16-Mar-2017
- Controls Meeting 16-Mar-2023
- Controls Meeting 17-Aug-2017
- Controls Meeting 17-Mar-2016
- Controls Meeting 17-May-2018
- Controls Meeting 17-Oct-2019
- Controls Meeting 18-Oct-2018
- Controls Meeting 19-Jan-2017
- Controls Meeting 19-Sep-2019
- Controls Meeting 2-Apr-2015
- Controls Meeting 2-Mar-2017
- Controls Meeting 2-May-2019
- Controls Meeting 20-Aug-2015
- Controls Meeting 20-Feb-2020
- Controls Meeting 20-Jul-2016
- Controls Meeting 20-Sep-2018
- Controls Meeting 21-Aug-2014
- Controls Meeting 21-Aug-2019
- Controls Meeting 21-Jul-2016
- Controls Meeting 21-Mar-2019
- Controls Meeting 22-Apr-2021
- Controls Meeting 22-Aug-2019
- Controls Meeting 22-Jan-2015
- Controls Meeting 22-Jul-2021
- Controls Meeting 22-Jun-2017
- Controls Meeting 22-Jun-2023
- Controls Meeting 22-Mar-2018
- Controls Meeting 23-Feb-2023
- Controls Meeting 23-Jan-2020
- Controls Meeting 23-Jul-2015
- Controls Meeting 23-Jun-2016
- Controls Meeting 23-Mar-2023
- Controls Meeting 24-Jan-2019
- Controls Meeting 24-Jul-2014
- Controls Meeting 24-Jun-2015
- Controls Meeting 24-Jun-2021
- Controls Meeting 24-Mar-2022
- Controls Meeting 25-Apr-2024
- Controls Meeting 25-Feb-2021
- Controls Meeting 25-Jan-2018
- Controls Meeting 25-Jan-2024
- Controls Meeting 25-Jul-2019
- Controls Meeting 25-Jun-2015
- Controls Meeting 25-Mar-2021
- Controls Meeting 26-Jan-2023
- Controls Meeting 26-May-2016
- Controls Meeting 26-Oct-2017
- Controls Meeting 26-Oct-2023
- Controls Meeting 27-Jan-2022
- Controls Meeting 27-Jun-2019
- Controls Meeting 28-Apr-2016
- Controls Meeting 28-Apr-2022
- Controls Meeting 28-Jan-2021
- Controls Meeting 28-Jul-2022
- Controls Meeting 28-Jun-2018
- Controls Meeting 28-May-2015
- Controls Meeting 28-Sep-2017
- Controls Meeting 28-Sep-2023
- Controls Meeting 29-Oct-2020
- Controls Meeting 29-Sep-2022
- Controls Meeting 3-Aug-2017
- Controls Meeting 30-Mar-2017
- Controls Meeting 30-May-2019
- Controls Meeting 30-Nov-2023
- Controls Meeting 31-Aug-2017
- Controls Meeting 31-Oct-2019
- Controls Meeting 4-Apr-2019
- Controls Meeting 4-Aug-2016
- Controls Meeting 4-Feb-2016
- Controls Meeting 4-Sep-2014
- Controls Meeting 5-Feb-2015
- Controls Meeting 5-Jan-2017
- Controls Meeting 7-Aug-2014
- Controls Meeting 7-Feb-2019
- Controls Meeting 7-Jan-2016
- Controls Meeting 8-Aug-2019
- Controls Meeting 8-Jan-2015
- Controls Meeting 8-Jun-2017
- Controls Meeting 9-Jul-2020
- Controls Meeting 9-Jun-2016
- Controls Meeting 9-Nov-2017
- Controls To Do List
- Converting sim-recon tags and branches to the split repositories
- Cosmic Particle Oscilloscope Coincidence Test
- Cosmic Particle Oscilloscope Readings
- Cosmic Particle Oscilloscope Readings (Lower Threshold)
- Cosmic ray test stand setup
- Counter Repair, Summer 2019
- Counting House
- Counting House DAQ
- Crate and channel assignment
- Crate data rates
- Cross check yields
- Crystal QA Check using Pair Spectrometer
- Curtis on DC-1
- Cut open straws
- DAC Calibration
- DANA objects
- DAQTree plugin
- DAQ Controller diskless setup
- DAQ Outline for May 2008
- DAQ Tasks for Spring 2015 Commissioning Run
- DAQ settings
- DAQ test computer
- DE/dx 250 MeV pions/kaons
- DE/dx 350 MeV pions/koans/protons
- DE/dx 350 MeV pions/protons
- DEPRECATED Offline Monitoring Archived Data
- DIRC CCDB Tables
- DIRC LV Power Cycling Schedule
- DIRC Planning for FY16
- DIRC Readout
- DIRC Software Tasks
- DIRC Spare Parts and Storage location
- DNP-2014 abstract submitted by Richard Jones
- DNP 2020 Planning
- DOE Medium Energy 2010
- DSelector SWIF Jobs
- Daq test stand-22-aug-2008
- Data Challenge 1
- Data Challenge 2 Event Tally Board
- Data Challenge 3
- Data Monitoring Database
- Data Plan Meeting, February 13, 2014
- Data Skimming
- Dec. 13, 2007 Tracking CDC/FDC
- Dec 1, 2011 SiPM Electrical and Cooling
- Dec 10, 2009 Calorimetry
- Dec 10, 2010 SiPM Electrical and Cooling
- Dec 11,2012 Readout
- Dec 11, 2013 Design Meeting
- Dec 13, 2013 Design Meeting
- Dec 14, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
- Dec 16
- Dec 16, 2010 Readout
- Dec 2, 2010 Readout
- Dec 20, 2010 Replacement Solenoid
- Dec 2019 Simulation branches
- Dec 5, 2011 SiPM Electrical and Cooling
- Dec 5, 2023 HallD AI/ML meeting
- Dec 6, 2019 Engineering Group Meeting
- Dec 7, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
- Dec 9, 2022
- December10, 2013
- December 02, 2011 Design Meeting
- December 02, 2021 CPP Design Meeting
- December 02, 2022 Tech group meeting
- December 09, 2021 KLONG Design Meeting
- December 1, 2008 Trackine CDC/FDC
- December 1, 2022
- December 10, 2010 Des/Fab Meeting
- December 10, 2019 FCAL Insert Design Meeting
- December 12, 2016
- December 14, 2009 Tracking CDC/FDC
- December 14, 2023
- December 15, 2008 Tracking CDC/FDC
- December 15, 2022
- December 16, 2013, Physics Working Group
- December 16, 2022 Tech group meeting
- December 17, 2012 (11:30AM), Physics Working Group
- December 17, 2013 Tracking FADC
- December 17, 2020 CPP Design Meeting
- December 18, 2009 CDC Meeting
- December 18, 2013 Calibration
- December 19, 2011 (11:30AM), Physics Working Group
- December 19, 2012 tracking CDC/FDC
- December 2, 2013, Physics Working Group
- December 2, 2014
- December 2, 2020
- December 21, 2011 Tracking CDC/FDC
- December 22,2010 Tracking CDC/FDC
- December 22, 2022
- December 29, 2022
- December 3, 2010 Des/Fab Meeting
- December 3, 2012 (11:30AM), Physics Working Group
- December 3, 2020 CPP Design Meeting
- December 4, 2006 Software
- December 4, 2013 Calibration
- December 6, 2010 (11AM), Physics Working Group
- December 7, 2011 Tracking CDC/FDC
- December 7, 2012
- December 7. 2023
- December 8, 2022
- December 9, 2011 Fab Meeting
- Ded
- Defining role of Physics Coordinator
- Deprecated: Computer Farms
- Deprecated: JANA/DANA
- Deprecated: Kinematic Fitter
- Deprecated: Offline Projects
- Deprecated: RSS Feeds
- Depth-Sensitive Diamond Topography
- Design of an asymmetric monochromator
- Detailed L3 Beam Test Plan Spring 2017
- Detailed sub-periods
- Detector Alignment
- Detector Rates and Lifetime
- Detector naming scheme
- Device for finding/verifying the beam plane location
- Diagnosing segmentation faults in reconstruction software
- Dimensions
- Dinner 18:00
- Dinner 18:00 ( Das Waldcafe)
- Dinner 18:30
- Discussion about the X-ray beam divergence
- Discussion of e+/e- tertiary beams in Hall D
- Discussion with Serguei Gevorkyan / Mon Apr 13
- Disk Space for Hall D at JLab
- Display Management Framework Options
- Divider test
- Dose Calculation
- Double Regge Exchange Meeting
- Draft By-law on Shift-taking
- Draft Start Counter Commissioning Plan
- Drawings Awaiting Release
- Drift Chamber Gas System
- Drift time comparison (gas check)
- Dump solenoid plc archive data
- E+e- Pair Production off target
- ECAL Controllers and VTPs
- ECAL IP addresses and names
- EM background rate studies
- EPICS archiving with MYA
- ESH&Q
- ESNET Registration
- EVO and H.323 Client
- EVO general
- Earth Magnetic Field
- Electron trajectories
- Electronic chain simulation
- Electronics: CFD delay and treshold
- Electronics Action Items
- Electronics Outline for May 2008
- Electronics Testing Readiness Review Checklist
- Electronics Workshops/Pre-Meetings
- Elton Smith - The 12 GeV JLab Upgrade Project
- Email from Richard Jones (06/14/2021)
- Email from Vanderhaeghen
- Email sent by David on April 13, 2012
- Emittance measurements
- Energy/Amplitude as a function of drift time
- Energy Resolution Plot
- Energy threshold for various assumed PDE and DR combinations
- Errors from hd dump
- EventStore File Formats
- EventStore Run Metadata
- EventStore Table Definitions
- Event Analyzer
- Event generators
- Event pics
- Example CCDB session
- Example of Monitoring Histogram Email
- Excursions in Hall D beam positions
- Exotic Review
- ExpDocs Introduction
- Expected Statistics for GlueX
- Experiment Readiness Review
- Experiment Readiness Review 2016
- Experiment Readiness Review 2017
- Experiment Readiness Review 2020
- Experimental Hall-D
- Experimental Sensitivity to Solenoidal Field
- Explanation of ROOT tree leaves
- F125ADC Tests with FDC
- F425962
- FA125 Meeting May 13, 2016
- FA125 chip occupancy
- FA125 firmware check
- FA125 firmware check 2.00D+
- FADC250 Firmware Versions
- FADC 250
- FADC Emulation Meeting, August 26, 2015
- FADC algorithm
- FADC timing
- FCAL-Insert
- FCALLeadGlass
- FCALPMT
- FCAL Beamtest Geometry
- FCAL Beamtest Setup Pictures
- FCAL Construction Readiness Review Checklist
- FCAL DAQ Meetings
- FCAL GEANT simulations http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf
- FCAL HV scan
- FCAL Magnetic Shield Design
- FCAL Readout Electronics
- FCAL Reconstruction 04/08/2012
- FCAL Reconstruction MIN BLOCK 04/24/2012
- FCAL Reconstruction in b1pi events 03/06/2012
- FCAL preparation status
- FCAL timing 7/1/15
- FDC Beam hole size
- FDC Nominal Design Parameters
- FDC Overview
- FDC Readiness Agenda
- FDC Readiness Checklist
- FDC Test
- FDC geometry May09
- FDC geometry study
- FDC procedures
- FDC prototype magnet test status (Simon T.)
- FDC tilt/alignment update
- FSRoot
- FSU Data Challenge 2
- Fall-2018-Running
- Fall 2015
- Fall 2015 Commissioning Plan
- Fall 2015 spring 2016
- Fall 2016
- Fall 2016 High Intensity/L3 beam test
- Fall 2016 Run time charts
- Fall 2016 Run time charts nogoni
- Fall 2016 Run time charts progress
- Fall 2019 TRD/GEM Commissioning
- Fall 2022 Run Coordination Meetings