Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #501 to #1,000.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. CDC prototype drift times
  2. CDC prototype fADC data
  3. CDC prototype flowrates
  4. CDC prototype more on timing
  5. CDC prototype more on timing 2
  6. CDC prototype more on timing 3
  7. CDC prototype runs at CMU
  8. CDC prototype tilted
  9. CDC q vs n
  10. CDC readout requirements
  11. CDC recent run drift times
  12. CDC run 1282 noise
  13. CDC run 1603 strawless ch
  14. CDC run 2016 drift time fits
  15. CDC run 2055
  16. CDC run 2551
  17. CDC run 2551 drift time fits
  18. CDC run 970
  19. CDC run 985
  20. CDC straight straws
  21. CDC straw number index
  22. CDC threshold scan procedure
  23. CDC tilted detectors
  24. CDC tilted detectors summary
  25. CDC time spikes
  26. CDC track angles (range of theta)
  27. CDC tracked and untracked cosmics
  28. CDC tracked and untracked cosmics 1950
  29. CDC tracked cosmics
  30. CDC transfer func attempt
  31. CDC wiggle wire positions
  32. CERNLIB Installation
  33. CFD Diff
  34. CFD Fifth - 90"
  35. CFD First - 50"
  36. CFD Fourth - 70"
  37. CFD Left
  38. CFD Right
  39. CFD Second - 10"
  40. CFD Sum
  41. CFD Third - 30"
  42. CHESS X-ray measurements 5/2009
  43. CHESS X-ray measurements 5/2011
  44. CLARA and Service Oriented Architectures
  45. CMU - Naomi's secondary event readout file
  46. CMU - fADC125
  47. CMU CLEAN ROOM
  48. CMU Data Challenge 2
  49. CMsgRootConsumer.cc
  50. CMsgRootMakefile
  51. CMsgRootProducer.cc
  52. CODA include file distribution problem
  53. CPP-NPP DAQ Configuration
  54. CPP-NPP Experimental Controls
  55. CPP-NPP Tagger Microscope
  56. CPP-NPP Target
  57. CPP-NPP Trigger
  58. CPP/NPP (2022-05) BCAL pi0 calibration
  59. CPP Beam Test Feb. 2019
  60. CPP Beam Test Spring 2018
  61. CPP Calibration Studies
  62. CPP DAQ/CPP AIEC config
  63. CPP Run Coverage Summer 2022
  64. CPP Scintillators
  65. CPPsim
  66. CRYTUR
  67. CRYTUR Crystal Size and Visual Inspection
  68. CRY Event Generator
  69. CTOF ADC response
  70. CTOF Delta T
  71. CTOF Timing
  72. Cables and Crates
  73. Calib 20160601
  74. Calibration 20140212 BCALComments
  75. Calibration Constants, Tagged Versions
  76. Calibration Dashboard
  77. Calibration Procedures
  78. Calibration Status
  79. Calibration Workflow
  80. Cart Interlock System
  81. Cart Operation Plan
  82. Cart Safety Review
  83. Channel Mapping
  84. Charge division
  85. Charge to the committee
  86. Checking the FCAL gains
  87. Checking the gain
  88. Checklist for splitting sim-recon
  89. Chi-squared tracker
  90. Chip Watson E-mail from April 11,2012
  91. ClueX/PrimEx 2008-08-27
  92. Coding Conventions
  93. Coil Test Weekly Meeting 1-Apr-2010
  94. Coil Test Weekly Meeting 10-Jun-2010
  95. Coil Test Weekly Meeting 14-Oct-2010
  96. Coil Test Weekly Meeting 15-Apr-2010
  97. Coil Test Weekly Meeting 15-Jul-2010
  98. Coil Test Weekly Meeting 16-Jul-2009
  99. Coil Test Weekly Meeting 16-Sep-2010
  100. Coil Test Weekly Meeting 17-Dec-2010
  101. Coil Test Weekly Meeting 17-Jun-2010
  102. Coil Test Weekly Meeting 18-Mar-2010
  103. Coil Test Weekly Meeting 19-Aug-2010
  104. Coil Test Weekly Meeting 2-Jul-2009
  105. Coil Test Weekly Meeting 2-Sep-2010
  106. Coil Test Weekly Meeting 20-May-2010
  107. Coil Test Weekly Meeting 22-Jul-2010
  108. Coil Test Weekly Meeting 23-Jul-2009
  109. Coil Test Weekly Meeting 23-Sep-2010
  110. Coil Test Weekly Meeting 24-Jun-2010
  111. Coil Test Weekly Meeting 25-Mar-2010
  112. Coil Test Weekly Meeting 26-Aug-2010
  113. Coil Test Weekly Meeting 27-May-2010
  114. Coil Test Weekly Meeting 29-Apr-2010
  115. Coil Test Weekly Meeting 29-Jul-2010
  116. Coil Test Weekly Meeting 3-Dec-2010
  117. Coil Test Weekly Meeting 3-Jun-2010
  118. Coil Test Weekly Meeting 30-Sep-2010
  119. Coil Test Weekly Meeting 4-Nov-2010
  120. Coil Test Weekly Meeting 5-Aug-2010
  121. Coil Test Weekly Meeting 6-May-2010
  122. Coil Test Weekly Meeting 7-Oct-2010
  123. Coil Test Weekly Meeting 8-Apr-2010
  124. Coil Test Weekly Meeting 9-Jul-2009
  125. Coincidence Counting Oscilloscope Readings
  126. Collimation System
  127. CollimatorMtgs-1-14-2013
  128. CollimatorMtgs-3-5-2013
  129. CollimatorMtgs-6-8-2015
  130. CollimatorMtgs-7-31-2013
  131. Collimator Cave
  132. Collimator cave background
  133. Comments from C.A. Meyer
  134. Comments from M.M. Ito on FADC FCAL NIM 2010
  135. Comments from Y. Van Haarlem
  136. Comments on draft 1 of pac presentation
  137. Commissioning Calibration Data
  138. Commissioning Event Rates
  139. Commissioning Run, Fall 2018
  140. Commissioning beam
  141. Common beam properties interface for generators
  142. CompCal Construction
  143. Comparison of March 2007 and March 2008 Resolutions
  144. Comparison of radiation damage between FLUKA and Geant
  145. Compilers 10-apr-2013
  146. Compressed-format-27-apr-2013
  147. Compton Calorimeter
  148. Compton Cross Section Systematic
  149. Compton photoproduction off electron
  150. Configuration Management
  151. Configuring Future Simulations
  152. Connect to ZoomGov Meetings
  153. Connecting an EVO meeting to an ESNet meeting
  154. Connection to Jlab meetings
  155. Constants to Review
  156. Construction plan 1/1/2020 - 30/8/2020
  157. Construction schedule milestones
  158. Controls-status-8-aug-2008
  159. Controls Meeting 03-May-2018
  160. Controls Meeting 06-Sep-2018
  161. Controls Meeting 08-Feb-2018
  162. Controls Meeting 08-Mar-2018
  163. Controls Meeting 09-Aug-2018
  164. Controls Meeting 1-Jun-2023
  165. Controls Meeting 1-Nov-2018
  166. Controls Meeting 1-Oct-2020
  167. Controls Meeting 1-Sep-2016
  168. Controls Meeting 10-Dec-2015
  169. Controls Meeting 10-Jan-2019
  170. Controls Meeting 10-Nov-2016
  171. Controls Meeting 11-Aug-2011
  172. Controls Meeting 11-Jul-2019
  173. Controls Meeting 11-Jun-2020
  174. Controls Meeting 11-May-2017
  175. Controls Meeting 11-Nov-2015
  176. Controls Meeting 12-Aug-2021
  177. Controls Meeting 12-Jul-2018
  178. Controls Meeting 12-May-2016
  179. Controls Meeting 13-Dec-2018
  180. Controls Meeting 13-Jun-2019
  181. Controls Meeting 13-Oct-2016
  182. Controls Meeting 14-Jun-2018
  183. Controls Meeting 14-May-2015
  184. Controls Meeting 14-Nov-2019
  185. Controls Meeting 14-Sep-2017
  186. Controls Meeting 15-Nov-2018
  187. Controls Meeting 15-Oct-2015
  188. Controls Meeting 16-Mar-2017
  189. Controls Meeting 16-Mar-2023
  190. Controls Meeting 17-Aug-2017
  191. Controls Meeting 17-Mar-2016
  192. Controls Meeting 17-May-2018
  193. Controls Meeting 17-Oct-2019
  194. Controls Meeting 18-Oct-2018
  195. Controls Meeting 19-Jan-2017
  196. Controls Meeting 19-Sep-2019
  197. Controls Meeting 2-Apr-2015
  198. Controls Meeting 2-Mar-2017
  199. Controls Meeting 2-May-2019
  200. Controls Meeting 20-Aug-2015
  201. Controls Meeting 20-Feb-2020
  202. Controls Meeting 20-Jul-2016
  203. Controls Meeting 20-Sep-2018
  204. Controls Meeting 21-Aug-2014
  205. Controls Meeting 21-Aug-2019
  206. Controls Meeting 21-Jul-2016
  207. Controls Meeting 21-Mar-2019
  208. Controls Meeting 22-Apr-2021
  209. Controls Meeting 22-Aug-2019
  210. Controls Meeting 22-Jan-2015
  211. Controls Meeting 22-Jul-2021
  212. Controls Meeting 22-Jun-2017
  213. Controls Meeting 22-Jun-2023
  214. Controls Meeting 22-Mar-2018
  215. Controls Meeting 23-Feb-2023
  216. Controls Meeting 23-Jan-2020
  217. Controls Meeting 23-Jul-2015
  218. Controls Meeting 23-Jun-2016
  219. Controls Meeting 23-Mar-2023
  220. Controls Meeting 24-Jan-2019
  221. Controls Meeting 24-Jul-2014
  222. Controls Meeting 24-Jun-2015
  223. Controls Meeting 24-Jun-2021
  224. Controls Meeting 24-Mar-2022
  225. Controls Meeting 25-Apr-2024
  226. Controls Meeting 25-Feb-2021
  227. Controls Meeting 25-Jan-2018
  228. Controls Meeting 25-Jan-2024
  229. Controls Meeting 25-Jul-2019
  230. Controls Meeting 25-Jun-2015
  231. Controls Meeting 25-Mar-2021
  232. Controls Meeting 26-Jan-2023
  233. Controls Meeting 26-May-2016
  234. Controls Meeting 26-Oct-2017
  235. Controls Meeting 26-Oct-2023
  236. Controls Meeting 27-Jan-2022
  237. Controls Meeting 27-Jun-2019
  238. Controls Meeting 28-Apr-2016
  239. Controls Meeting 28-Apr-2022
  240. Controls Meeting 28-Jan-2021
  241. Controls Meeting 28-Jul-2022
  242. Controls Meeting 28-Jun-2018
  243. Controls Meeting 28-May-2015
  244. Controls Meeting 28-Sep-2017
  245. Controls Meeting 28-Sep-2023
  246. Controls Meeting 29-Oct-2020
  247. Controls Meeting 29-Sep-2022
  248. Controls Meeting 3-Aug-2017
  249. Controls Meeting 30-Mar-2017
  250. Controls Meeting 30-May-2019
  251. Controls Meeting 30-Nov-2023
  252. Controls Meeting 31-Aug-2017
  253. Controls Meeting 31-Oct-2019
  254. Controls Meeting 4-Apr-2019
  255. Controls Meeting 4-Aug-2016
  256. Controls Meeting 4-Feb-2016
  257. Controls Meeting 4-Sep-2014
  258. Controls Meeting 5-Feb-2015
  259. Controls Meeting 5-Jan-2017
  260. Controls Meeting 7-Aug-2014
  261. Controls Meeting 7-Feb-2019
  262. Controls Meeting 7-Jan-2016
  263. Controls Meeting 8-Aug-2019
  264. Controls Meeting 8-Jan-2015
  265. Controls Meeting 8-Jun-2017
  266. Controls Meeting 9-Jul-2020
  267. Controls Meeting 9-Jun-2016
  268. Controls Meeting 9-Nov-2017
  269. Controls To Do List
  270. Converting sim-recon tags and branches to the split repositories
  271. Cosmic Particle Oscilloscope Coincidence Test
  272. Cosmic Particle Oscilloscope Readings
  273. Cosmic Particle Oscilloscope Readings (Lower Threshold)
  274. Cosmic ray test stand setup
  275. Counter Repair, Summer 2019
  276. Counting House
  277. Counting House DAQ
  278. Crate and channel assignment
  279. Crate data rates
  280. Cross check yields
  281. Crystal QA Check using Pair Spectrometer
  282. Curtis on DC-1
  283. Cut open straws
  284. DAC Calibration
  285. DANA objects
  286. DAQTree plugin
  287. DAQ Controller diskless setup
  288. DAQ Outline for May 2008
  289. DAQ Tasks for Spring 2015 Commissioning Run
  290. DAQ settings
  291. DAQ test computer
  292. DE/dx 250 MeV pions/kaons
  293. DE/dx 350 MeV pions/koans/protons
  294. DE/dx 350 MeV pions/protons
  295. DEPRECATED Offline Monitoring Archived Data
  296. DIRC CCDB Tables
  297. DIRC LV Power Cycling Schedule
  298. DIRC Planning for FY16
  299. DIRC Readout
  300. DIRC Software Tasks
  301. DIRC Spare Parts and Storage location
  302. DNP-2014 abstract submitted by Richard Jones
  303. DNP 2020 Planning
  304. DOE Medium Energy 2010
  305. DSelector SWIF Jobs
  306. Daq test stand-22-aug-2008
  307. Data Challenge 1
  308. Data Challenge 2 Event Tally Board
  309. Data Challenge 3
  310. Data Monitoring Database
  311. Data Plan Meeting, February 13, 2014
  312. Data Skimming
  313. Dec. 13, 2007 Tracking CDC/FDC
  314. Dec 1, 2011 SiPM Electrical and Cooling
  315. Dec 10, 2009 Calorimetry
  316. Dec 10, 2010 SiPM Electrical and Cooling
  317. Dec 11,2012 Readout
  318. Dec 11, 2013 Design Meeting
  319. Dec 13, 2013 Design Meeting
  320. Dec 14, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  321. Dec 16
  322. Dec 16, 2010 Readout
  323. Dec 2, 2010 Readout
  324. Dec 20, 2010 Replacement Solenoid
  325. Dec 2019 Simulation branches
  326. Dec 5, 2011 SiPM Electrical and Cooling
  327. Dec 5, 2023 HallD AI/ML meeting
  328. Dec 6, 2019 Engineering Group Meeting
  329. Dec 7, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  330. Dec 9, 2022
  331. December10, 2013
  332. December 02, 2011 Design Meeting
  333. December 02, 2021 CPP Design Meeting
  334. December 02, 2022 Tech group meeting
  335. December 09, 2021 KLONG Design Meeting
  336. December 1, 2008 Trackine CDC/FDC
  337. December 1, 2022
  338. December 10, 2010 Des/Fab Meeting
  339. December 10, 2019 FCAL Insert Design Meeting
  340. December 12, 2016
  341. December 14, 2009 Tracking CDC/FDC
  342. December 14, 2023
  343. December 15, 2008 Tracking CDC/FDC
  344. December 15, 2022
  345. December 16, 2013, Physics Working Group
  346. December 16, 2022 Tech group meeting
  347. December 17, 2012 (11:30AM), Physics Working Group
  348. December 17, 2013 Tracking FADC
  349. December 17, 2020 CPP Design Meeting
  350. December 18, 2009 CDC Meeting
  351. December 18, 2013 Calibration
  352. December 19, 2011 (11:30AM), Physics Working Group
  353. December 19, 2012 tracking CDC/FDC
  354. December 2, 2013, Physics Working Group
  355. December 2, 2014
  356. December 2, 2020
  357. December 21, 2011 Tracking CDC/FDC
  358. December 22,2010 Tracking CDC/FDC
  359. December 22, 2022
  360. December 29, 2022
  361. December 3, 2010 Des/Fab Meeting
  362. December 3, 2012 (11:30AM), Physics Working Group
  363. December 3, 2020 CPP Design Meeting
  364. December 4, 2006 Software
  365. December 4, 2013 Calibration
  366. December 6, 2010 (11AM), Physics Working Group
  367. December 7, 2011 Tracking CDC/FDC
  368. December 7, 2012
  369. December 7. 2023
  370. December 8, 2022
  371. December 9, 2011 Fab Meeting
  372. Ded
  373. Defining role of Physics Coordinator
  374. Deprecated: Computer Farms
  375. Deprecated: JANA/DANA
  376. Deprecated: Kinematic Fitter
  377. Deprecated: Offline Projects
  378. Deprecated: RSS Feeds
  379. Depth-Sensitive Diamond Topography
  380. Design of an asymmetric monochromator
  381. Detailed L3 Beam Test Plan Spring 2017
  382. Detailed sub-periods
  383. Detector Alignment
  384. Detector Rates and Lifetime
  385. Detector naming scheme
  386. Device for finding/verifying the beam plane location
  387. Diagnosing segmentation faults in reconstruction software
  388. Dimensions
  389. Dinner 18:00
  390. Dinner 18:00 ( Das Waldcafe)
  391. Dinner 18:30
  392. Discussion about the X-ray beam divergence
  393. Discussion of e+/e- tertiary beams in Hall D
  394. Discussion with Serguei Gevorkyan / Mon Apr 13
  395. Disk Space for Hall D at JLab
  396. Display Management Framework Options
  397. Divider test
  398. Dose Calculation
  399. Double Regge Exchange Meeting
  400. Draft By-law on Shift-taking
  401. Draft Start Counter Commissioning Plan
  402. Drawings Awaiting Release
  403. Drift Chamber Gas System
  404. Drift time comparison (gas check)
  405. Dump solenoid plc archive data
  406. E+e- Pair Production off target
  407. ECAL Controllers and VTPs
  408. ECAL IP addresses and names
  409. EM background rate studies
  410. EPICS archiving with MYA
  411. ESH&Q
  412. ESNET Registration
  413. EVO and H.323 Client
  414. EVO general
  415. Earth Magnetic Field
  416. Electron trajectories
  417. Electronic chain simulation
  418. Electronics: CFD delay and treshold
  419. Electronics Action Items
  420. Electronics Outline for May 2008
  421. Electronics Testing Readiness Review Checklist
  422. Electronics Workshops/Pre-Meetings
  423. Elton Smith - The 12 GeV JLab Upgrade Project
  424. Email from Richard Jones (06/14/2021)
  425. Email from Vanderhaeghen
  426. Email sent by David on April 13, 2012
  427. Emittance measurements
  428. Energy/Amplitude as a function of drift time
  429. Energy Resolution Plot
  430. Energy threshold for various assumed PDE and DR combinations
  431. Errors from hd dump
  432. EventStore File Formats
  433. EventStore Run Metadata
  434. EventStore Table Definitions
  435. Event Analyzer
  436. Event generators
  437. Event pics
  438. Example CCDB session
  439. Example of Monitoring Histogram Email
  440. Excursions in Hall D beam positions
  441. Exotic Review
  442. ExpDocs Introduction
  443. Expected Statistics for GlueX
  444. Experiment Readiness Review
  445. Experiment Readiness Review 2016
  446. Experiment Readiness Review 2017
  447. Experiment Readiness Review 2020
  448. Experimental Hall-D
  449. Experimental Sensitivity to Solenoidal Field
  450. Explanation of ROOT tree leaves
  451. F125ADC Tests with FDC
  452. F425962
  453. FA125 Meeting May 13, 2016
  454. FA125 chip occupancy
  455. FA125 firmware check
  456. FA125 firmware check 2.00D+
  457. FADC250 Firmware Versions
  458. FADC 250
  459. FADC Emulation Meeting, August 26, 2015
  460. FADC algorithm
  461. FADC timing
  462. FCAL-Insert
  463. FCALLeadGlass
  464. FCALPMT
  465. FCAL Beamtest Geometry
  466. FCAL Beamtest Setup Pictures
  467. FCAL Construction Readiness Review Checklist
  468. FCAL DAQ Meetings
  469. FCAL GEANT simulations http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf
  470. FCAL HV scan
  471. FCAL Magnetic Shield Design
  472. FCAL Readout Electronics
  473. FCAL Reconstruction 04/08/2012
  474. FCAL Reconstruction MIN BLOCK 04/24/2012
  475. FCAL Reconstruction in b1pi events 03/06/2012
  476. FCAL preparation status
  477. FCAL timing 7/1/15
  478. FDC Beam hole size
  479. FDC Nominal Design Parameters
  480. FDC Overview
  481. FDC Readiness Agenda
  482. FDC Readiness Checklist
  483. FDC Test
  484. FDC geometry May09
  485. FDC geometry study
  486. FDC procedures
  487. FDC prototype magnet test status (Simon T.)
  488. FDC tilt/alignment update
  489. FSRoot
  490. FSU Data Challenge 2
  491. Fall-2018-Running
  492. Fall 2015
  493. Fall 2015 Commissioning Plan
  494. Fall 2015 spring 2016
  495. Fall 2016
  496. Fall 2016 High Intensity/L3 beam test
  497. Fall 2016 Run time charts
  498. Fall 2016 Run time charts nogoni
  499. Fall 2016 Run time charts progress
  500. Fall 2019 TRD/GEM Commissioning

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)