Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #551 to #1,050.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. CMsgRootProducer.cc
  2. CODA include file distribution problem
  3. CPP-NPP DAQ Configuration
  4. CPP-NPP Experimental Controls
  5. CPP-NPP Tagger Microscope
  6. CPP-NPP Target
  7. CPP-NPP Trigger
  8. CPP/NPP (2022-05) BCAL pi0 calibration
  9. CPP Beam Test Feb. 2019
  10. CPP Beam Test Spring 2018
  11. CPP Calibration Studies
  12. CPP DAQ/CPP AIEC config
  13. CPP Run Coverage Summer 2022
  14. CPP Scintillators
  15. CPPsim
  16. CRYTUR
  17. CRYTUR Crystal Size and Visual Inspection
  18. CRY Event Generator
  19. CTOF ADC response
  20. CTOF Delta T
  21. CTOF Timing
  22. Cables and Crates
  23. Calib 20160601
  24. Calibration 20140212 BCALComments
  25. Calibration Constants, Tagged Versions
  26. Calibration Dashboard
  27. Calibration Procedures
  28. Calibration Status
  29. Calibration Workflow
  30. Cart Interlock System
  31. Cart Operation Plan
  32. Cart Safety Review
  33. Channel Mapping
  34. Charge division
  35. Charge to the committee
  36. Checking the FCAL gains
  37. Checking the gain
  38. Checklist for splitting sim-recon
  39. Chi-squared tracker
  40. Chip Watson E-mail from April 11,2012
  41. ClueX/PrimEx 2008-08-27
  42. Coding Conventions
  43. Coil Test Weekly Meeting 1-Apr-2010
  44. Coil Test Weekly Meeting 10-Jun-2010
  45. Coil Test Weekly Meeting 14-Oct-2010
  46. Coil Test Weekly Meeting 15-Apr-2010
  47. Coil Test Weekly Meeting 15-Jul-2010
  48. Coil Test Weekly Meeting 16-Jul-2009
  49. Coil Test Weekly Meeting 16-Sep-2010
  50. Coil Test Weekly Meeting 17-Dec-2010
  51. Coil Test Weekly Meeting 17-Jun-2010
  52. Coil Test Weekly Meeting 18-Mar-2010
  53. Coil Test Weekly Meeting 19-Aug-2010
  54. Coil Test Weekly Meeting 2-Jul-2009
  55. Coil Test Weekly Meeting 2-Sep-2010
  56. Coil Test Weekly Meeting 20-May-2010
  57. Coil Test Weekly Meeting 22-Jul-2010
  58. Coil Test Weekly Meeting 23-Jul-2009
  59. Coil Test Weekly Meeting 23-Sep-2010
  60. Coil Test Weekly Meeting 24-Jun-2010
  61. Coil Test Weekly Meeting 25-Mar-2010
  62. Coil Test Weekly Meeting 26-Aug-2010
  63. Coil Test Weekly Meeting 27-May-2010
  64. Coil Test Weekly Meeting 29-Apr-2010
  65. Coil Test Weekly Meeting 29-Jul-2010
  66. Coil Test Weekly Meeting 3-Dec-2010
  67. Coil Test Weekly Meeting 3-Jun-2010
  68. Coil Test Weekly Meeting 30-Sep-2010
  69. Coil Test Weekly Meeting 4-Nov-2010
  70. Coil Test Weekly Meeting 5-Aug-2010
  71. Coil Test Weekly Meeting 6-May-2010
  72. Coil Test Weekly Meeting 7-Oct-2010
  73. Coil Test Weekly Meeting 8-Apr-2010
  74. Coil Test Weekly Meeting 9-Jul-2009
  75. Coincidence Counting Oscilloscope Readings
  76. Collimation System
  77. CollimatorMtgs-1-14-2013
  78. CollimatorMtgs-3-5-2013
  79. CollimatorMtgs-6-8-2015
  80. CollimatorMtgs-7-31-2013
  81. Collimator Cave
  82. Collimator cave background
  83. Comments from C.A. Meyer
  84. Comments from M.M. Ito on FADC FCAL NIM 2010
  85. Comments from Y. Van Haarlem
  86. Comments on draft 1 of pac presentation
  87. Commissioning Calibration Data
  88. Commissioning Event Rates
  89. Commissioning Run, Fall 2018
  90. Commissioning beam
  91. Common beam properties interface for generators
  92. CompCal Construction
  93. Comparison of March 2007 and March 2008 Resolutions
  94. Comparison of radiation damage between FLUKA and Geant
  95. Compilers 10-apr-2013
  96. Compressed-format-27-apr-2013
  97. Compton Calorimeter
  98. Compton Cross Section Systematic
  99. Compton photoproduction off electron
  100. Configuration Management
  101. Configuring Future Simulations
  102. Connect to ZoomGov Meetings
  103. Connecting an EVO meeting to an ESNet meeting
  104. Connection to Jlab meetings
  105. Constants to Review
  106. Construction plan 1/1/2020 - 30/8/2020
  107. Construction schedule milestones
  108. Controls-status-8-aug-2008
  109. Controls Meeting 03-May-2018
  110. Controls Meeting 06-Sep-2018
  111. Controls Meeting 08-Feb-2018
  112. Controls Meeting 08-Mar-2018
  113. Controls Meeting 09-Aug-2018
  114. Controls Meeting 1-Jun-2023
  115. Controls Meeting 1-Nov-2018
  116. Controls Meeting 1-Oct-2020
  117. Controls Meeting 1-Sep-2016
  118. Controls Meeting 10-Dec-2015
  119. Controls Meeting 10-Jan-2019
  120. Controls Meeting 10-Nov-2016
  121. Controls Meeting 11-Aug-2011
  122. Controls Meeting 11-Jul-2019
  123. Controls Meeting 11-Jun-2020
  124. Controls Meeting 11-May-2017
  125. Controls Meeting 11-Nov-2015
  126. Controls Meeting 12-Aug-2021
  127. Controls Meeting 12-Jul-2018
  128. Controls Meeting 12-May-2016
  129. Controls Meeting 13-Dec-2018
  130. Controls Meeting 13-Jun-2019
  131. Controls Meeting 13-Oct-2016
  132. Controls Meeting 14-Jun-2018
  133. Controls Meeting 14-May-2015
  134. Controls Meeting 14-Nov-2019
  135. Controls Meeting 14-Sep-2017
  136. Controls Meeting 15-Nov-2018
  137. Controls Meeting 15-Oct-2015
  138. Controls Meeting 16-Mar-2017
  139. Controls Meeting 16-Mar-2023
  140. Controls Meeting 17-Aug-2017
  141. Controls Meeting 17-Mar-2016
  142. Controls Meeting 17-May-2018
  143. Controls Meeting 17-Oct-2019
  144. Controls Meeting 18-Oct-2018
  145. Controls Meeting 19-Jan-2017
  146. Controls Meeting 19-Sep-2019
  147. Controls Meeting 2-Apr-2015
  148. Controls Meeting 2-Mar-2017
  149. Controls Meeting 2-May-2019
  150. Controls Meeting 20-Aug-2015
  151. Controls Meeting 20-Feb-2020
  152. Controls Meeting 20-Jul-2016
  153. Controls Meeting 20-Sep-2018
  154. Controls Meeting 21-Aug-2014
  155. Controls Meeting 21-Aug-2019
  156. Controls Meeting 21-Jul-2016
  157. Controls Meeting 21-Mar-2019
  158. Controls Meeting 22-Apr-2021
  159. Controls Meeting 22-Aug-2019
  160. Controls Meeting 22-Jan-2015
  161. Controls Meeting 22-Jul-2021
  162. Controls Meeting 22-Jun-2017
  163. Controls Meeting 22-Jun-2023
  164. Controls Meeting 22-Mar-2018
  165. Controls Meeting 23-Feb-2023
  166. Controls Meeting 23-Jan-2020
  167. Controls Meeting 23-Jul-2015
  168. Controls Meeting 23-Jun-2016
  169. Controls Meeting 23-Mar-2023
  170. Controls Meeting 23-May-2024
  171. Controls Meeting 24-Jan-2019
  172. Controls Meeting 24-Jul-2014
  173. Controls Meeting 24-Jun-2015
  174. Controls Meeting 24-Jun-2021
  175. Controls Meeting 24-Mar-2022
  176. Controls Meeting 25-Apr-2024
  177. Controls Meeting 25-Feb-2021
  178. Controls Meeting 25-Jan-2018
  179. Controls Meeting 25-Jan-2024
  180. Controls Meeting 25-Jul-2019
  181. Controls Meeting 25-Jun-2015
  182. Controls Meeting 25-Mar-2021
  183. Controls Meeting 26-Jan-2023
  184. Controls Meeting 26-May-2016
  185. Controls Meeting 26-Oct-2017
  186. Controls Meeting 26-Oct-2023
  187. Controls Meeting 27-Jan-2022
  188. Controls Meeting 27-Jun-2019
  189. Controls Meeting 28-Apr-2016
  190. Controls Meeting 28-Apr-2022
  191. Controls Meeting 28-Jan-2021
  192. Controls Meeting 28-Jul-2022
  193. Controls Meeting 28-Jun-2018
  194. Controls Meeting 28-May-2015
  195. Controls Meeting 28-Sep-2017
  196. Controls Meeting 28-Sep-2023
  197. Controls Meeting 29-Oct-2020
  198. Controls Meeting 29-Sep-2022
  199. Controls Meeting 3-Aug-2017
  200. Controls Meeting 30-Mar-2017
  201. Controls Meeting 30-May-2019
  202. Controls Meeting 30-Nov-2023
  203. Controls Meeting 31-Aug-2017
  204. Controls Meeting 31-Oct-2019
  205. Controls Meeting 4-Apr-2019
  206. Controls Meeting 4-Aug-2016
  207. Controls Meeting 4-Feb-2016
  208. Controls Meeting 4-Sep-2014
  209. Controls Meeting 5-Feb-2015
  210. Controls Meeting 5-Jan-2017
  211. Controls Meeting 7-Aug-2014
  212. Controls Meeting 7-Feb-2019
  213. Controls Meeting 7-Jan-2016
  214. Controls Meeting 8-Aug-2019
  215. Controls Meeting 8-Jan-2015
  216. Controls Meeting 8-Jun-2017
  217. Controls Meeting 9-Jul-2020
  218. Controls Meeting 9-Jun-2016
  219. Controls Meeting 9-Nov-2017
  220. Controls To Do List
  221. Converting sim-recon tags and branches to the split repositories
  222. Cosmic Particle Oscilloscope Coincidence Test
  223. Cosmic Particle Oscilloscope Readings
  224. Cosmic Particle Oscilloscope Readings (Lower Threshold)
  225. Cosmic ray test stand setup
  226. Counter Repair, Summer 2019
  227. Counting House
  228. Counting House DAQ
  229. Crate and channel assignment
  230. Crate data rates
  231. Cross check yields
  232. Crystal QA Check using Pair Spectrometer
  233. Curtis on DC-1
  234. Cut open straws
  235. DAC Calibration
  236. DANA objects
  237. DAQTree plugin
  238. DAQ Controller diskless setup
  239. DAQ Outline for May 2008
  240. DAQ Tasks for Spring 2015 Commissioning Run
  241. DAQ settings
  242. DAQ test computer
  243. DE/dx 250 MeV pions/kaons
  244. DE/dx 350 MeV pions/koans/protons
  245. DE/dx 350 MeV pions/protons
  246. DEPRECATED Offline Monitoring Archived Data
  247. DIRC CCDB Tables
  248. DIRC LV Power Cycling Schedule
  249. DIRC Planning for FY16
  250. DIRC Readout
  251. DIRC Software Tasks
  252. DIRC Spare Parts and Storage location
  253. DNP-2014 abstract submitted by Richard Jones
  254. DNP 2020 Planning
  255. DOE Medium Energy 2010
  256. DSelector SWIF Jobs
  257. Daq test stand-22-aug-2008
  258. Data Challenge 1
  259. Data Challenge 2 Event Tally Board
  260. Data Challenge 3
  261. Data Monitoring Database
  262. Data Plan Meeting, February 13, 2014
  263. Data Skimming
  264. Dec. 13, 2007 Tracking CDC/FDC
  265. Dec 1, 2011 SiPM Electrical and Cooling
  266. Dec 10, 2009 Calorimetry
  267. Dec 10, 2010 SiPM Electrical and Cooling
  268. Dec 11,2012 Readout
  269. Dec 11, 2013 Design Meeting
  270. Dec 13, 2013 Design Meeting
  271. Dec 14, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  272. Dec 16
  273. Dec 16, 2010 Readout
  274. Dec 2, 2010 Readout
  275. Dec 20, 2010 Replacement Solenoid
  276. Dec 2019 Simulation branches
  277. Dec 5, 2011 SiPM Electrical and Cooling
  278. Dec 5, 2023 HallD AI/ML meeting
  279. Dec 6, 2019 Engineering Group Meeting
  280. Dec 7, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  281. Dec 9, 2022
  282. December10, 2013
  283. December 02, 2011 Design Meeting
  284. December 02, 2021 CPP Design Meeting
  285. December 02, 2022 Tech group meeting
  286. December 09, 2021 KLONG Design Meeting
  287. December 1, 2008 Trackine CDC/FDC
  288. December 1, 2022
  289. December 10, 2010 Des/Fab Meeting
  290. December 10, 2019 FCAL Insert Design Meeting
  291. December 12, 2016
  292. December 14, 2009 Tracking CDC/FDC
  293. December 14, 2023
  294. December 15, 2008 Tracking CDC/FDC
  295. December 15, 2022
  296. December 16, 2013, Physics Working Group
  297. December 16, 2022 Tech group meeting
  298. December 17, 2012 (11:30AM), Physics Working Group
  299. December 17, 2013 Tracking FADC
  300. December 17, 2020 CPP Design Meeting
  301. December 18, 2009 CDC Meeting
  302. December 18, 2013 Calibration
  303. December 19, 2011 (11:30AM), Physics Working Group
  304. December 19, 2012 tracking CDC/FDC
  305. December 2, 2013, Physics Working Group
  306. December 2, 2014
  307. December 2, 2020
  308. December 21, 2011 Tracking CDC/FDC
  309. December 22,2010 Tracking CDC/FDC
  310. December 22, 2022
  311. December 29, 2022
  312. December 3, 2010 Des/Fab Meeting
  313. December 3, 2012 (11:30AM), Physics Working Group
  314. December 3, 2020 CPP Design Meeting
  315. December 4, 2006 Software
  316. December 4, 2013 Calibration
  317. December 6, 2010 (11AM), Physics Working Group
  318. December 7, 2011 Tracking CDC/FDC
  319. December 7, 2012
  320. December 7. 2023
  321. December 8, 2022
  322. December 9, 2011 Fab Meeting
  323. Ded
  324. Defining role of Physics Coordinator
  325. Deprecated: Computer Farms
  326. Deprecated: JANA/DANA
  327. Deprecated: Kinematic Fitter
  328. Deprecated: Offline Projects
  329. Deprecated: RSS Feeds
  330. Depth-Sensitive Diamond Topography
  331. Design of an asymmetric monochromator
  332. Detailed L3 Beam Test Plan Spring 2017
  333. Detailed sub-periods
  334. Detector Alignment
  335. Detector Rates and Lifetime
  336. Detector naming scheme
  337. Device for finding/verifying the beam plane location
  338. Diagnosing segmentation faults in reconstruction software
  339. Dimensions
  340. Dinner 18:00
  341. Dinner 18:00 ( Das Waldcafe)
  342. Dinner 18:30
  343. Discussion about the X-ray beam divergence
  344. Discussion of e+/e- tertiary beams in Hall D
  345. Discussion with Serguei Gevorkyan / Mon Apr 13
  346. Disk Space for Hall D at JLab
  347. Display Management Framework Options
  348. Divider test
  349. Dose Calculation
  350. Double Regge Exchange Meeting
  351. Draft By-law on Shift-taking
  352. Draft Start Counter Commissioning Plan
  353. Drawings Awaiting Release
  354. Drift Chamber Gas System
  355. Drift time comparison (gas check)
  356. Dump solenoid plc archive data
  357. E+e- Pair Production off target
  358. ECAL Controllers and VTPs
  359. ECAL IP addresses and names
  360. EM background rate studies
  361. EPICS archiving with MYA
  362. ESH&Q
  363. ESNET Registration
  364. EVO and H.323 Client
  365. EVO general
  366. Earth Magnetic Field
  367. Electron trajectories
  368. Electronic chain simulation
  369. Electronics: CFD delay and treshold
  370. Electronics Action Items
  371. Electronics Outline for May 2008
  372. Electronics Testing Readiness Review Checklist
  373. Electronics Workshops/Pre-Meetings
  374. Elton Smith - The 12 GeV JLab Upgrade Project
  375. Email from Richard Jones (06/14/2021)
  376. Email from Vanderhaeghen
  377. Email sent by David on April 13, 2012
  378. Emittance measurements
  379. Energy/Amplitude as a function of drift time
  380. Energy Resolution Plot
  381. Energy threshold for various assumed PDE and DR combinations
  382. Errors from hd dump
  383. EventStore File Formats
  384. EventStore Run Metadata
  385. EventStore Table Definitions
  386. Event Analyzer
  387. Event generators
  388. Event pics
  389. Example CCDB session
  390. Example of Monitoring Histogram Email
  391. Excursions in Hall D beam positions
  392. Exotic Review
  393. ExpDocs Introduction
  394. Expected Statistics for GlueX
  395. Experiment Readiness Review
  396. Experiment Readiness Review 2016
  397. Experiment Readiness Review 2017
  398. Experiment Readiness Review 2020
  399. Experimental Hall-D
  400. Experimental Sensitivity to Solenoidal Field
  401. Explanation of ROOT tree leaves
  402. F125ADC Tests with FDC
  403. F425962
  404. FA125 Meeting May 13, 2016
  405. FA125 chip occupancy
  406. FA125 firmware check
  407. FA125 firmware check 2.00D+
  408. FADC250 Firmware Versions
  409. FADC 250
  410. FADC Emulation Meeting, August 26, 2015
  411. FADC algorithm
  412. FADC timing
  413. FCAL-Insert
  414. FCALLeadGlass
  415. FCALPMT
  416. FCAL Beamtest Geometry
  417. FCAL Beamtest Setup Pictures
  418. FCAL Construction Readiness Review Checklist
  419. FCAL DAQ Meetings
  420. FCAL GEANT simulations http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf
  421. FCAL HV scan
  422. FCAL Magnetic Shield Design
  423. FCAL Readout Electronics
  424. FCAL Reconstruction 04/08/2012
  425. FCAL Reconstruction MIN BLOCK 04/24/2012
  426. FCAL Reconstruction in b1pi events 03/06/2012
  427. FCAL preparation status
  428. FCAL timing 7/1/15
  429. FDC Beam hole size
  430. FDC Nominal Design Parameters
  431. FDC Overview
  432. FDC Readiness Agenda
  433. FDC Readiness Checklist
  434. FDC Test
  435. FDC geometry May09
  436. FDC geometry study
  437. FDC procedures
  438. FDC prototype magnet test status (Simon T.)
  439. FDC tilt/alignment update
  440. FSRoot
  441. FSU Data Challenge 2
  442. Fall-2018-Running
  443. Fall 2015
  444. Fall 2015 Commissioning Plan
  445. Fall 2015 spring 2016
  446. Fall 2016
  447. Fall 2016 High Intensity/L3 beam test
  448. Fall 2016 Run time charts
  449. Fall 2016 Run time charts nogoni
  450. Fall 2016 Run time charts progress
  451. Fall 2019 TRD/GEM Commissioning
  452. Fall 2022 Run Coordination Meetings
  453. Fast Monitoring System - PXI
  454. Fast access procedureV1
  455. Fast shutdown requirements for voltages
  456. Fcal Readiness Checklist
  457. Fe-55 spectra
  458. Fe55 peak shape
  459. Feb. 07, 2008 Tracking CDC/FDC
  460. Feb 09
  461. Feb 10, 2011 Readout
  462. Feb 11, 2010 Readout
  463. Feb 11, 2011 Replacement Solenoid
  464. Feb 14, 2013 SiPM Electrical and Cooling
  465. Feb 14, 2014 Design Meeting
  466. Feb 15, 2013 Fab Meeting
  467. Feb 18, 2010 Calorimetry
  468. Feb 19,2013 Readout
  469. Feb 2, 2011 SiPM Electrical and Cooling
  470. Feb 20, 2024 HallD AI/ML meeting
  471. Feb 23, 2011 SiPM Electrical and Cooling
  472. Feb 24
  473. Feb 24, 2011 Readout
  474. Feb 25, 2010 Readout
  475. Feb 28, 2013 SiPM Electrical and Cooling
  476. Feb 28, 2014 Design Meeting
  477. Feb 4, 2010 Calorimetry
  478. Feb 7, 2020 Engineering Group Meeting
  479. Feb 8, 2013 Design Meeting
  480. Feb 9, 2011 SiPM Electrical and Cooling
  481. Feb 9, 2017
  482. Feb 9, 2018
  483. February 03, 2012 Fab Meeting
  484. February 08, 2023 Tech group meeting
  485. February 1, 2012 Tracking CDC/FDC
  486. February 1, 2024
  487. February 10, 2012 Design Meeting
  488. February 12, 2024 KLONG CPS Design Meeting
  489. February 13, 2012 (11:30AM), Physics Working Group
  490. February 14, 2011 (11:30AM), Physics Working Group
  491. February 15, 2024
  492. February 16, 2020
  493. February 16, 2021
  494. February 16, 2023
  495. February 17, 2009 Physics
  496. February 17, 2012 Fab Meeting
  497. February 17, 2022 DIRC
  498. February 17, 2022 KLONG Phase II Design Meeting
  499. February 18, 2011 Design
  500. February 2, 2023

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)