Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #71 to #570.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 35% drawing by IHEP provided in April/May 2007
  2. 55Fe vs cosmics
  3. ADC Peak Amplitude during the run period
  4. ADC data
  5. AMCDrawings Used for calculations
  6. ANSYS simulations
  7. ASIC design optimizations
  8. ASU polarimeter drawings
  9. Abbottd-info-needed-31-aug-2011
  10. Accelerometers with cheap Knocking sensor
  11. Access HMI screens through VNC
  12. Accessing the JLab Picture Archive
  13. Action Items
  14. Active Base Radiation Tests
  15. Active Collimator Interface Specification
  16. Active Collimator Preamplifier Cabling and Electronics
  17. Adding a new user
  18. Addressing ERR review recommendations
  19. After mass flow controller recalibration
  20. Agenda
  21. Agenda 060515
  22. Agenda 060609
  23. Alarms for voltages (Nerses)
  24. Alberta CFDs
  25. Alignment
  26. Alignment and Calibration
  27. Alignment data
  28. Alignment plots
  29. All modules (with SICCAS crystals) are removed
  30. Alternative readout
  31. Amorphous radiator/harp ladder requirements
  32. Analysis DParticleCombo
  33. Analysis Examples
  34. Analysis FAQ
  35. Analysis FAQ : Frequently Asked Questions
  36. Analysis JEventProcessor
  37. Analysis Miscellaneous
  38. Analysis Page
  39. Analysis Plan
  40. Analysis Shift Meeting Agenda, December 05 - December 07, 2021
  41. Analysis Shift Meeting Agenda, December 05 - December 11, 2021
  42. Analysis Shift Meeting Agenda, December 12 - December 18, 2021
  43. Analysis Shift Meeting Agenda, November 07 - November 13, 2021
  44. Analysis Shift Meeting Agenda, November 14 - November 20, 2021
  45. Analysis Shift Meeting Agenda, November 21 - November 27, 2021
  46. Analysis Shift Meeting Agenda, November 28 - December 04, 2021
  47. Analysis Studies Fall2016
  48. Analysis Studies Spring2017
  49. Analysis software wishlist from May 2020 CM
  50. Analyze Analysis Trees
  51. Andrei's recipe for BCAL Timing Calibration
  52. Annotated Git session using the sim-recon repository
  53. Apr. 14, 2008 Tracking CDC/FDC
  54. Apr. 4, 2008 Tracking CDC/FDC
  55. Apr 02,2020 Tech group meeting
  56. Apr 08,2020 Tech group meeting
  57. Apr 10,2020 Tech group meeting
  58. Apr 12, 2011 Calorimetry
  59. Apr 12, 2013 Design Meeting
  60. Apr 13,2020 Tech group meeting
  61. Apr 14, 2011 SiPM Electrical and Cooling
  62. Apr 15,2020 Tech group meeting
  63. Apr 15, 2010 Calorimetry
  64. Apr 16,2013 Readout
  65. Apr 16, 2009 Calorimetry
  66. Apr 17,2020 Tech group meeting
  67. Apr 18, 2013 SiPM Electrical and Cooling
  68. Apr 19, 2011 Readout
  69. Apr 20,2020 Tech group meeting
  70. Apr 21
  71. Apr 22,2020 Tech group meeting
  72. Apr 24,2020 Tech group meeting
  73. Apr 25, 2013 SiPM Electrical and Cooling
  74. Apr 26, 2013 Design Meeting
  75. Apr 27,2020 Tech group meeting
  76. Apr 28, 2011 SiPM Electrical and Cooling
  77. Apr 29,2020 Tech group meeting
  78. Apr 30,2013 Readout
  79. Apr 7
  80. Apr 7, 2011 SiPM Electrical and Cooling
  81. Apr 9, 2009 Readout
  82. Apr 9, 2024 HallD AI/ML meeting
  83. April 06, 2009 Tracking CDC/FDC
  84. April 07, 2022 CPP Design/Install Meeting
  85. April 08, 2013, Physics Working Group
  86. April 08, 2021 CPP Design Meeting
  87. April 09, 2024 KLONG CPS Design Meeting
  88. April 1, 2020 CPP Design Meeting
  89. April 1, 2022 Tech group SAD meeting
  90. April 1-7
  91. April 10, 2013 Tracking CDC/FDC
  92. April 11,2012 e-mail from Curtis regard RMP for Software Review
  93. April 11, 2011 (11:30AM), Physics Working Group
  94. April 11, 2014 Design Meeting
  95. April 12, 2010 (11AM), Physics Working Group
  96. April 12, 2011 SiPM Electrical and Cooling
  97. April 12, 2023, FCAL Insert Installation Meeting
  98. April 13, 2009 (11AM), Physics Working Group
  99. April 13, 2012 Fab Meeting
  100. April 13, 2023
  101. April 14, 2022 DIRC
  102. April 14, 2022 KLONG Phase II Design Meeting
  103. April 15, 2011 Design/Fab mtg
  104. April 15, 2019
  105. April 15, 2022 Tech group SAD meeting
  106. April 19, 2011 SiPM Electrical and Cooling
  107. April 19, 2013 PID Upgrade
  108. April 2, 2020 CPP Design Meeting
  109. April 20, 2009 Tracking CDC/FDC
  110. April 20, 2012 (4:00PM), Physics Working Group
  111. April 20, 2023
  112. April 20, 2023, FCAL Insert Installation Meeting
  113. April 21, 2022 CPP Design/Install Meeting
  114. April 22, 2013, Physics Working Group
  115. April 22, 2021 CPP Design Meeting
  116. April 22, 2022 Tech group SAD meeting
  117. April 23, 2020 CPP Design Meeting
  118. April 23, 2024 KLONG CPS Design Meeting
  119. April 25, 2011 (11:30AM), Physics Working Group
  120. April 25, 2024
  121. April 26, 2011 SiPM Electrical and Cooling
  122. April 26, 2023, FCAL Insert Installation Meeting
  123. April 27, 2009 (11AM), Physics Working Group
  124. April 27, 2012 (3:00PM), Rare eta-decay meeting.
  125. April 27, 2023
  126. April 29, 2022 Tech group SAD meeting
  127. April 3, 2017
  128. April 30, 2012 Design Meeting
  129. April 4, 2015
  130. April 4, 2016
  131. April 5, 2013 PID Upgrade
  132. April 5, 2023, FCAL Insert Installation Meeting
  133. April 6, 2022 FCAL 2 Design Meeting
  134. April 6, 2023
  135. April 8, 2022 Tech group SAD meeting
  136. April 8-14
  137. Assmbly Hub for the CDC
  138. Attenuation Results from Radphi
  139. Aug 02,2020 Tech group meeting
  140. Aug 1, 2014 Design Meeting
  141. Aug 11, 2011 SiPM Electrical and Cooling
  142. Aug 14, 2011 Replacement Solenoid
  143. Aug 15, 2023 HallD AI/ML meeting
  144. Aug 16, 2011 Calorimetry
  145. Aug 16, 2011 SiPM Electrical and Cooling
  146. Aug 19, 2010 Calorimetry
  147. Aug 2, 2011 Calorimetry
  148. Aug 20, 2009 Calorimetry
  149. Aug 21, 2012 Readout
  150. Aug 22, 2023 HallD AI/ML meeting
  151. Aug 23, 2011 Readout
  152. Aug 23, 2011 SiPM Electrical and Cooling
  153. Aug 25, 2011 SiPM Electrical and Cooling
  154. Aug 27, 2009 Readout
  155. Aug 29, 2014 Design Meeting
  156. Aug 30, 2011 Calorimetry
  157. Aug 30, 2011 Readout
  158. Aug 30, 2011 SiPM Electrical and Cooling
  159. Aug 30, 2014 Design Meeting
  160. Aug 30, 2023 HallD AI/ML meeting
  161. Aug 31, 2023 HallD AI/ML meeting
  162. Aug 4, 2011 SiPM Electrical and Cooling
  163. Aug 6,2013 Readout
  164. Aug 8, 2023 HallD AI/ML meeting
  165. Aug 9, 2011 Readout
  166. Aug 9, 2011 SiPM Electrical and Cooling
  167. August 09, 2022 FCAL Insert Installation Meeting
  168. August 1, 2012 Tracking CDC/FDC
  169. August 10, 2006
  170. August 10, 2009 Tracking CDC/FDC
  171. August 10, 2012 Design Meeting
  172. August 10, 2015
  173. August 10, 2022 FCAL Insert Installation Meeting
  174. August 10, 2023
  175. August 11, 2022
  176. August 12, 2010 CDC Meeting
  177. August 12, 2010 Des/Fab Meeting
  178. August 12, 2011 Design Meeting
  179. August 12, 2013, Physics Working Group
  180. August 12, 2022 Tech group meeting
  181. August 14, 2006 Software
  182. August 14, 2013 tracking CDC/FDC
  183. August 15, 2012 traccking CDC/FDC
  184. August 15, 2019 FCAL Insert Design Meeting
  185. August 16, 2010 (11AM), Physics Working Group
  186. August 17, 2006
  187. August 17, 2009 (11AM), Physics Working Group
  188. August 17, 2010 Tracking CDC/FDC
  189. August 17, 2011 Tracking CDC/FDC
  190. August 17, 2012 Fab Meeting
  191. August 17, 2023
  192. August 18, 2022
  193. August 19, 2010 Des/Fab Meeting
  194. August 19, 2021 KLONG Design Meeting
  195. August 2, 2010 (11AM), Physics Working Group
  196. August 20, 2012 PID Upgrade
  197. August 23, 2013 PID Upgrade
  198. August 24, 2009 Tracking CDC/FDC
  199. August 24, 2012 Design Meeting
  200. August 24, 2023
  201. August 25, 2008 Tracking CDC/FDC
  202. August 25, 2022
  203. August 26, 2010 Des/Fab Meeting
  204. August 26, 2013, Physics Working Group
  205. August 26, 2021 CPP Design Meeting
  206. August 27, 2012 (11:30AM), Physics Working Group
  207. August 28, 2006 Software
  208. August 28, 2013 tracking CDC/FDC
  209. August 29, 2011 (11:30AM), Physics Working Group
  210. August 29, 2012 traccking CDC/FDC
  211. August 29, 2012 tracking CDC/FDC
  212. August 29, 2022 FCAL Insert Installation Meeting
  213. August 3, 2009 (11AM), Physics Working Group
  214. August 3, 2011 Tracking CDC/FDC
  215. August 3, 2022 DIRC analysis
  216. August 3, 2023
  217. August 30, 2010 (11AM), Physics Working Group
  218. August 30, 2023 Calorimeter
  219. August 31, 2009 (11AM), Physics Working Group
  220. August 31, 2011 Tracking CDC/FDC
  221. August 31, 2023
  222. August 4, 2022
  223. August 5, 2011 Design/Fab Meeting
  224. August 5, 2022 Tech group meeting
  225. August 7, 2006 Software
  226. August 8, 2014
  227. August 9, 2010 CDC Meeting
  228. August 9, 2013 PID Upgrade
  229. Automated Timing Calibrations
  230. Available EventStore skims
  231. B1pi monitoring dashboard schema
  232. B1pi tests Sep. 2011
  233. BCAL-Chiller.MPOD Interlock.jpg
  234. BCAL Action Items and Working Tasks
  235. BCAL Angular Coverage
  236. BCAL Beam Test Plots, November 20, 2006
  237. BCAL Calibration
  238. BCAL Cell Cross Talk
  239. BCAL Costhe Efficiency
  240. BCAL Gain Calibration
  241. BCAL Hybrid Module Cosmic Tests
  242. BCAL Installation
  243. BCAL Installation Schedule
  244. BCAL Key Documents
  245. BCAL LED Installation Photos
  246. BCAL Monitoring
  247. BCAL Pb Sheet Widths
  248. BCAL Preparations for spring 2016
  249. BCAL Readout Review
  250. BCAL Readout Segmentation Task group Meeting: Aug 12, 2011
  251. BCAL Readout Segmentation Task group Meeting: Aug 19, 2011
  252. BCAL Readout Segmentation Task group Meeting: Aug 5, 2011
  253. BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
  254. BCAL Readout Segmentation Task group Meeting: Jun 23, 2011
  255. BCAL Readout Segmentation Task group Meeting: Jun 30, 2011
  256. BCAL Readout Segmentation Task group Meeting: Jun 9, 2011
  257. BCAL Readout Segmentation Task group Meeting: May 19, 2011
  258. BCAL Readout Segmentation Task group Meeting: May 26, 2011
  259. BCAL Readout Segmentation Task group Meeting: Nov. 14, 2011
  260. BCAL Readout Segmentation Task group Meeting: Nov. 21, 2011
  261. BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011
  262. BCAL Readout Segmentation Task group Meeting: Oct. 10, 2011
  263. BCAL Readout Segmentation Task group Meeting: Oct. 3, 2011
  264. BCAL Readout Segmentation Task group Meeting: Sep 19, 2011
  265. BCAL Readout Segmentation Task group Meeting: Sep 2, 2011
  266. BCAL Readout Segmentation Task group Meeting: Sep 26, 2011
  267. BCAL Reconstruction Algorithms
  268. BCAL Reconstruction Issues
  269. BCAL Reconstruction Status Update 20130501
  270. BCAL Reconstruction Task list
  271. BCAL Stand-Alone Monte Carlo - energy resolution
  272. BCAL Startup Checkout List 2014
  273. BCAL TDC Timing
  274. BCAL calibration links, 2020, PrimEx, SRC
  275. BCAL cosmics
  276. BCAL hadronic efficiencies
  277. BCAL reconstruction 01/16/2012
  278. BCAL reconstruction 03/07/2013
  279. BCAL reconstruction 10/19/11
  280. BCAL reconstruction 11/28/11
  281. BCAL reconstruction 8/24/11
  282. BCAL reconstruction 9/21/11
  283. BCAL reconstruction test with pi0
  284. BCal Beam Test Plots, April 10, 2007
  285. BCal Beam Test Plots, April 4, 2007
  286. BCal Beam Test Plots, August 28, 2007
  287. BCal Beam Test Plots, December 15, 2006
  288. BCal Beam Test Plots, December 19, 2006
  289. BCal Beam Test Plots, March 8, 2007
  290. BCal Beam Test Plots, May 8, 2007
  291. BCal Raw ADC Plots, June 18, 2007
  292. BCal Timing Resolution Note
  293. BLTWG Meeting 01/19/2015
  294. BLTWG Meeting 01/21/2013
  295. BLTWG Meeting 10/11/2007
  296. BLTWG Meeting 11/16/2007
  297. BLTWG Meeting 11/29/2007
  298. BLTWG Meeting 11/8/2007
  299. BLTWG Meeting 12/20/2007
  300. BLTWG Meeting 4/17/2008
  301. BLTWG Meeting 4/3/2008
  302. BLTWG Meeting 5/1/2008
  303. BLTWG Meeting 5/29/2008
  304. BLTWG Meeting 9/13/2007
  305. BLTWG Meeting 9/27/2007
  306. Baby BCAL at JLab
  307. Baby BCAL at JLab Photos
  308. Background studies
  309. Bar box darkening procedure
  310. Barrel Calorimeter
  311. Basic formalism for X-ray monochromator resolution
  312. Bcal Action Item Tracker
  313. Beam-induced background
  314. Beam-induced backgrounds
  315. Beam Data
  316. Beam Test Analyses and Results
  317. Beam Test Meeting Mon. Apr. 02, 2012
  318. Beam Test Meeting Mon. Apr. 09, 2012
  319. Beam Test Meeting Mon. Apr. 16, 2012
  320. Beam Test Meeting Mon. Apr. 23, 2012
  321. Beam Test Meeting Mon. Apr. 30, 2012
  322. Beam Test Meeting Mon. Mar. 19, 2012
  323. Beam Test Meeting Mon. Mar. 26, 2012
  324. Beam Test Meeting Mon. May. 07, 2012
  325. Beam Test Shift Schedule
  326. Beam commissioning: Fall 2014
  327. Beam commissioning in Fall 2014
  328. Beam halo measurements to assess background for PRad target TAC runs.
  329. Beam request (expect to run in 2021)
  330. Beam request (run in 2021)
  331. Beni's PMT replacement email
  332. Bggen-2017-01-ver03
  333. Bggen-2017-01-ver03.6
  334. Bggen-2018-01-ver02.2 bggen
  335. Bggen-2018-01-ver02 bggen
  336. Bggen-2018-08-ver02.2 bggen
  337. Bggen-2018-08-ver02 bggen
  338. Bill's to do list
  339. Blake CAP08 Abstract
  340. Bleed-through tests from other hall bunches
  341. BoardAgenda201001
  342. BoardAgenda201005
  343. BoardAgenda201009
  344. BoardAgenda201102
  345. BoardAgenda201105
  346. BoardAgenda201110
  347. BoardAgenda201202
  348. BoardAgenda201205
  349. BoardAgenda201210
  350. BoardAgenda201302
  351. BoardAgenda201306
  352. BoardAgenda201310
  353. BoardAgenda201402
  354. BoardAgenda201610
  355. BoardAgenda201702
  356. BoardAgenda201705
  357. BoardAgenda201710
  358. BoardAgenda201809
  359. BoardAgenda201905
  360. Brief Report on Yianna's ADC fits for SensL SiPMs
  361. Build on Github Pull Request
  362. Building HDDM support software
  363. Building Private Versions of GlueX Software: my halld build jlab
  364. Building a roof over src
  365. C++11 in Hall D Online
  366. CAEN V792N ADC
  367. CBAR Splitoff Software
  368. CB member who changes institutions
  369. CCAL preparation
  370. CCDB 0.09
  371. CCDB 1.00
  372. CCDB Author List Maintenance
  373. CCDB Example Session
  374. CCDB Schema Changes in Version 1.00
  375. CCDB Tables BCAL
  376. CCDB Tables CDC
  377. CCDB Tables FCAL
  378. CCDB Tables FDC
  379. CCDB Tables Photon Beam
  380. CCDB Tables Start Counter
  381. CCDB Tables TOF
  382. CCDB Wishlist
  383. CD3 geometry forward-region material effects
  384. CDC/FDC ASIC Discussion Meeting, September 3, 2008
  385. CDC/FDC Gas System GUI
  386. CDC 06 02 2008
  387. CDC 14 11 2007
  388. CDC 20 02 2008
  389. CDC 216 channels
  390. CDC 21 05 2008
  391. CDC 21 11 2007
  392. CDC 23 01 2008
  393. CDC 28 11 2007
  394. CDC 50/50 premix
  395. CDC 50 50
  396. CDC 55 45
  397. CDC 60 40
  398. CDC B field
  399. CDC Construction Complications Tracking
  400. CDC Electrical Hook Up Photos
  401. CDC Future MC Studies Discussion, October 1, 2008
  402. CDC HVB version 3
  403. CDC HV scan
  404. CDC HV scan instructions October 2021
  405. CDC High Voltage Board (HVB)
  406. CDC Hit Generation
  407. CDC NIM Elton
  408. CDC Pedestal Studies
  409. CDC Photos 2008
  410. CDC Readiness Checklist
  411. CDC Straw Sag photos
  412. CDC alcohol
  413. CDC amp dedx
  414. CDC and FDC readout tests
  415. CDC bad channels
  416. CDC channel numbers
  417. CDC commissioning plan
  418. CDC events
  419. CDC finding signal duration
  420. CDC garfield calcs
  421. CDC garfield drift vs gas mix
  422. CDC garfield xt table comparison
  423. CDC geometry April09
  424. CDC max drift times from Garfield
  425. CDC more garfield calcs
  426. CDC odd events
  427. CDC old & new preamp noise scope trace study
  428. CDC old preamp then and now
  429. CDC peak lengths
  430. CDC preamp LV checkup
  431. CDC prototype drift times
  432. CDC prototype fADC data
  433. CDC prototype flowrates
  434. CDC prototype more on timing
  435. CDC prototype more on timing 2
  436. CDC prototype more on timing 3
  437. CDC prototype runs at CMU
  438. CDC prototype tilted
  439. CDC q vs n
  440. CDC readout requirements
  441. CDC recent run drift times
  442. CDC run 1282 noise
  443. CDC run 1603 strawless ch
  444. CDC run 2016 drift time fits
  445. CDC run 2055
  446. CDC run 2551
  447. CDC run 2551 drift time fits
  448. CDC run 970
  449. CDC run 985
  450. CDC straight straws
  451. CDC straw number index
  452. CDC threshold scan procedure
  453. CDC tilted detectors
  454. CDC tilted detectors summary
  455. CDC time spikes
  456. CDC track angles (range of theta)
  457. CDC tracked and untracked cosmics
  458. CDC tracked and untracked cosmics 1950
  459. CDC tracked cosmics
  460. CDC transfer func attempt
  461. CDC wiggle wire positions
  462. CERNLIB Installation
  463. CFD Diff
  464. CFD Fifth - 90"
  465. CFD First - 50"
  466. CFD Fourth - 70"
  467. CFD Left
  468. CFD Right
  469. CFD Second - 10"
  470. CFD Sum
  471. CFD Third - 30"
  472. CHESS X-ray measurements 5/2009
  473. CHESS X-ray measurements 5/2011
  474. CLARA and Service Oriented Architectures
  475. CMU - Naomi's secondary event readout file
  476. CMU - fADC125
  477. CMU CLEAN ROOM
  478. CMU Data Challenge 2
  479. CMsgRootConsumer.cc
  480. CMsgRootMakefile
  481. CMsgRootProducer.cc
  482. CODA include file distribution problem
  483. CPP-NPP DAQ Configuration
  484. CPP-NPP Experimental Controls
  485. CPP-NPP Tagger Microscope
  486. CPP-NPP Target
  487. CPP-NPP Trigger
  488. CPP/NPP (2022-05) BCAL pi0 calibration
  489. CPP Beam Test Feb. 2019
  490. CPP Beam Test Spring 2018
  491. CPP Calibration Studies
  492. CPP DAQ/CPP AIEC config
  493. CPP Run Coverage Summer 2022
  494. CPP Scintillators
  495. CPPsim
  496. CRYTUR
  497. CRYTUR Crystal Size and Visual Inspection
  498. CRY Event Generator
  499. CTOF ADC response
  500. CTOF Delta T

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)