Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #51 to #550.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 2009-03-11
  2. 2009-03-25
  3. 2009-04-08
  4. 2009-04-22
  5. 2009-09-21
  6. 2009-10-08
  7. 2010-10-06
  8. 2011 Hall B Bcal Goals
  9. 2012 Software Review Closeout Notes
  10. 20140625 BCAL Timing
  11. 2015 October 14 DIRC Project Review
  12. 2017-01 recon ver02 plans
  13. 20200831 sdobbs PID notes
  14. 2020 Data Production
  15. 2020 Winter - 2021 Spring
  16. 2021-07-29
  17. 2022 Data Production
  18. 2023 Data Production
  19. 22 February 2008
  20. 2π0 simulation
  21. 35% drawing by IHEP provided in April/May 2007
  22. 55Fe vs cosmics
  23. ADC Peak Amplitude during the run period
  24. ADC data
  25. AMCDrawings Used for calculations
  26. ANSYS simulations
  27. ASIC design optimizations
  28. ASU polarimeter drawings
  29. Abbottd-info-needed-31-aug-2011
  30. Accelerometers with cheap Knocking sensor
  31. Access HMI screens through VNC
  32. Accessing the JLab Picture Archive
  33. Action Items
  34. Active Base Radiation Tests
  35. Active Collimator Interface Specification
  36. Active Collimator Preamplifier Cabling and Electronics
  37. Adding a new user
  38. Addressing ERR review recommendations
  39. After mass flow controller recalibration
  40. Agenda
  41. Agenda 060515
  42. Agenda 060609
  43. Alarms for voltages (Nerses)
  44. Alberta CFDs
  45. Alignment
  46. Alignment and Calibration
  47. Alignment data
  48. Alignment plots
  49. All modules (with SICCAS crystals) are removed
  50. Alternative readout
  51. Amorphous radiator/harp ladder requirements
  52. Analysis DParticleCombo
  53. Analysis Examples
  54. Analysis FAQ
  55. Analysis FAQ : Frequently Asked Questions
  56. Analysis JEventProcessor
  57. Analysis Miscellaneous
  58. Analysis Page
  59. Analysis Plan
  60. Analysis Shift Meeting Agenda, December 05 - December 07, 2021
  61. Analysis Shift Meeting Agenda, December 05 - December 11, 2021
  62. Analysis Shift Meeting Agenda, December 12 - December 18, 2021
  63. Analysis Shift Meeting Agenda, November 07 - November 13, 2021
  64. Analysis Shift Meeting Agenda, November 14 - November 20, 2021
  65. Analysis Shift Meeting Agenda, November 21 - November 27, 2021
  66. Analysis Shift Meeting Agenda, November 28 - December 04, 2021
  67. Analysis Studies Fall2016
  68. Analysis Studies Spring2017
  69. Analysis software wishlist from May 2020 CM
  70. Analyze Analysis Trees
  71. Andrei's recipe for BCAL Timing Calibration
  72. Annotated Git session using the sim-recon repository
  73. Apr. 14, 2008 Tracking CDC/FDC
  74. Apr. 4, 2008 Tracking CDC/FDC
  75. Apr 02,2020 Tech group meeting
  76. Apr 08,2020 Tech group meeting
  77. Apr 10,2020 Tech group meeting
  78. Apr 12, 2011 Calorimetry
  79. Apr 12, 2013 Design Meeting
  80. Apr 13,2020 Tech group meeting
  81. Apr 14, 2011 SiPM Electrical and Cooling
  82. Apr 15,2020 Tech group meeting
  83. Apr 15, 2010 Calorimetry
  84. Apr 16,2013 Readout
  85. Apr 16, 2009 Calorimetry
  86. Apr 17,2020 Tech group meeting
  87. Apr 18, 2013 SiPM Electrical and Cooling
  88. Apr 19, 2011 Readout
  89. Apr 20,2020 Tech group meeting
  90. Apr 21
  91. Apr 22,2020 Tech group meeting
  92. Apr 24,2020 Tech group meeting
  93. Apr 25, 2013 SiPM Electrical and Cooling
  94. Apr 26, 2013 Design Meeting
  95. Apr 27,2020 Tech group meeting
  96. Apr 28, 2011 SiPM Electrical and Cooling
  97. Apr 29,2020 Tech group meeting
  98. Apr 30,2013 Readout
  99. Apr 7
  100. Apr 7, 2011 SiPM Electrical and Cooling
  101. Apr 9, 2009 Readout
  102. Apr 9, 2024 HallD AI/ML meeting
  103. April 06, 2009 Tracking CDC/FDC
  104. April 07, 2022 CPP Design/Install Meeting
  105. April 08, 2013, Physics Working Group
  106. April 08, 2021 CPP Design Meeting
  107. April 09, 2024 KLONG CPS Design Meeting
  108. April 1, 2020 CPP Design Meeting
  109. April 1, 2022 Tech group SAD meeting
  110. April 1-7
  111. April 10, 2013 Tracking CDC/FDC
  112. April 11,2012 e-mail from Curtis regard RMP for Software Review
  113. April 11, 2011 (11:30AM), Physics Working Group
  114. April 11, 2014 Design Meeting
  115. April 12, 2010 (11AM), Physics Working Group
  116. April 12, 2011 SiPM Electrical and Cooling
  117. April 12, 2023, FCAL Insert Installation Meeting
  118. April 13, 2009 (11AM), Physics Working Group
  119. April 13, 2012 Fab Meeting
  120. April 13, 2023
  121. April 14, 2022 DIRC
  122. April 14, 2022 KLONG Phase II Design Meeting
  123. April 15, 2011 Design/Fab mtg
  124. April 15, 2019
  125. April 15, 2022 Tech group SAD meeting
  126. April 19, 2011 SiPM Electrical and Cooling
  127. April 19, 2013 PID Upgrade
  128. April 2, 2020 CPP Design Meeting
  129. April 20, 2009 Tracking CDC/FDC
  130. April 20, 2012 (4:00PM), Physics Working Group
  131. April 20, 2023
  132. April 20, 2023, FCAL Insert Installation Meeting
  133. April 21, 2022 CPP Design/Install Meeting
  134. April 22, 2013, Physics Working Group
  135. April 22, 2021 CPP Design Meeting
  136. April 22, 2022 Tech group SAD meeting
  137. April 23, 2020 CPP Design Meeting
  138. April 23, 2024 KLONG CPS Design Meeting
  139. April 25, 2011 (11:30AM), Physics Working Group
  140. April 25, 2024
  141. April 26, 2011 SiPM Electrical and Cooling
  142. April 26, 2023, FCAL Insert Installation Meeting
  143. April 27, 2009 (11AM), Physics Working Group
  144. April 27, 2012 (3:00PM), Rare eta-decay meeting.
  145. April 27, 2023
  146. April 29, 2022 Tech group SAD meeting
  147. April 3, 2017
  148. April 30, 2012 Design Meeting
  149. April 4, 2015
  150. April 4, 2016
  151. April 5, 2013 PID Upgrade
  152. April 5, 2023, FCAL Insert Installation Meeting
  153. April 6, 2022 FCAL 2 Design Meeting
  154. April 6, 2023
  155. April 8, 2022 Tech group SAD meeting
  156. April 8-14
  157. Assmbly Hub for the CDC
  158. Attenuation Results from Radphi
  159. Aug 02,2020 Tech group meeting
  160. Aug 1, 2014 Design Meeting
  161. Aug 11, 2011 SiPM Electrical and Cooling
  162. Aug 14, 2011 Replacement Solenoid
  163. Aug 15, 2023 HallD AI/ML meeting
  164. Aug 16, 2011 Calorimetry
  165. Aug 16, 2011 SiPM Electrical and Cooling
  166. Aug 19, 2010 Calorimetry
  167. Aug 2, 2011 Calorimetry
  168. Aug 20, 2009 Calorimetry
  169. Aug 21, 2012 Readout
  170. Aug 22, 2023 HallD AI/ML meeting
  171. Aug 23, 2011 Readout
  172. Aug 23, 2011 SiPM Electrical and Cooling
  173. Aug 25, 2011 SiPM Electrical and Cooling
  174. Aug 27, 2009 Readout
  175. Aug 29, 2014 Design Meeting
  176. Aug 30, 2011 Calorimetry
  177. Aug 30, 2011 Readout
  178. Aug 30, 2011 SiPM Electrical and Cooling
  179. Aug 30, 2014 Design Meeting
  180. Aug 30, 2023 HallD AI/ML meeting
  181. Aug 31, 2023 HallD AI/ML meeting
  182. Aug 4, 2011 SiPM Electrical and Cooling
  183. Aug 6,2013 Readout
  184. Aug 8, 2023 HallD AI/ML meeting
  185. Aug 9, 2011 Readout
  186. Aug 9, 2011 SiPM Electrical and Cooling
  187. August 09, 2022 FCAL Insert Installation Meeting
  188. August 1, 2012 Tracking CDC/FDC
  189. August 10, 2006
  190. August 10, 2009 Tracking CDC/FDC
  191. August 10, 2012 Design Meeting
  192. August 10, 2015
  193. August 10, 2022 FCAL Insert Installation Meeting
  194. August 10, 2023
  195. August 11, 2022
  196. August 12, 2010 CDC Meeting
  197. August 12, 2010 Des/Fab Meeting
  198. August 12, 2011 Design Meeting
  199. August 12, 2013, Physics Working Group
  200. August 12, 2022 Tech group meeting
  201. August 14, 2006 Software
  202. August 14, 2013 tracking CDC/FDC
  203. August 15, 2012 traccking CDC/FDC
  204. August 15, 2019 FCAL Insert Design Meeting
  205. August 16, 2010 (11AM), Physics Working Group
  206. August 17, 2006
  207. August 17, 2009 (11AM), Physics Working Group
  208. August 17, 2010 Tracking CDC/FDC
  209. August 17, 2011 Tracking CDC/FDC
  210. August 17, 2012 Fab Meeting
  211. August 17, 2023
  212. August 18, 2022
  213. August 19, 2010 Des/Fab Meeting
  214. August 19, 2021 KLONG Design Meeting
  215. August 2, 2010 (11AM), Physics Working Group
  216. August 20, 2012 PID Upgrade
  217. August 23, 2013 PID Upgrade
  218. August 24, 2009 Tracking CDC/FDC
  219. August 24, 2012 Design Meeting
  220. August 24, 2023
  221. August 25, 2008 Tracking CDC/FDC
  222. August 25, 2022
  223. August 26, 2010 Des/Fab Meeting
  224. August 26, 2013, Physics Working Group
  225. August 26, 2021 CPP Design Meeting
  226. August 27, 2012 (11:30AM), Physics Working Group
  227. August 28, 2006 Software
  228. August 28, 2013 tracking CDC/FDC
  229. August 29, 2011 (11:30AM), Physics Working Group
  230. August 29, 2012 traccking CDC/FDC
  231. August 29, 2012 tracking CDC/FDC
  232. August 29, 2022 FCAL Insert Installation Meeting
  233. August 3, 2009 (11AM), Physics Working Group
  234. August 3, 2011 Tracking CDC/FDC
  235. August 3, 2022 DIRC analysis
  236. August 3, 2023
  237. August 30, 2010 (11AM), Physics Working Group
  238. August 30, 2023 Calorimeter
  239. August 31, 2009 (11AM), Physics Working Group
  240. August 31, 2011 Tracking CDC/FDC
  241. August 31, 2023
  242. August 4, 2022
  243. August 5, 2011 Design/Fab Meeting
  244. August 5, 2022 Tech group meeting
  245. August 7, 2006 Software
  246. August 8, 2014
  247. August 9, 2010 CDC Meeting
  248. August 9, 2013 PID Upgrade
  249. Automated Timing Calibrations
  250. Available EventStore skims
  251. B1pi monitoring dashboard schema
  252. B1pi tests Sep. 2011
  253. BCAL-Chiller.MPOD Interlock.jpg
  254. BCAL Action Items and Working Tasks
  255. BCAL Angular Coverage
  256. BCAL Beam Test Plots, November 20, 2006
  257. BCAL Calibration
  258. BCAL Cell Cross Talk
  259. BCAL Costhe Efficiency
  260. BCAL Gain Calibration
  261. BCAL Hybrid Module Cosmic Tests
  262. BCAL Installation
  263. BCAL Installation Schedule
  264. BCAL Key Documents
  265. BCAL LED Installation Photos
  266. BCAL Monitoring
  267. BCAL Pb Sheet Widths
  268. BCAL Preparations for spring 2016
  269. BCAL Readout Review
  270. BCAL Readout Segmentation Task group Meeting: Aug 12, 2011
  271. BCAL Readout Segmentation Task group Meeting: Aug 19, 2011
  272. BCAL Readout Segmentation Task group Meeting: Aug 5, 2011
  273. BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
  274. BCAL Readout Segmentation Task group Meeting: Jun 23, 2011
  275. BCAL Readout Segmentation Task group Meeting: Jun 30, 2011
  276. BCAL Readout Segmentation Task group Meeting: Jun 9, 2011
  277. BCAL Readout Segmentation Task group Meeting: May 19, 2011
  278. BCAL Readout Segmentation Task group Meeting: May 26, 2011
  279. BCAL Readout Segmentation Task group Meeting: Nov. 14, 2011
  280. BCAL Readout Segmentation Task group Meeting: Nov. 21, 2011
  281. BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011
  282. BCAL Readout Segmentation Task group Meeting: Oct. 10, 2011
  283. BCAL Readout Segmentation Task group Meeting: Oct. 3, 2011
  284. BCAL Readout Segmentation Task group Meeting: Sep 19, 2011
  285. BCAL Readout Segmentation Task group Meeting: Sep 2, 2011
  286. BCAL Readout Segmentation Task group Meeting: Sep 26, 2011
  287. BCAL Reconstruction Algorithms
  288. BCAL Reconstruction Issues
  289. BCAL Reconstruction Status Update 20130501
  290. BCAL Reconstruction Task list
  291. BCAL Stand-Alone Monte Carlo - energy resolution
  292. BCAL Startup Checkout List 2014
  293. BCAL TDC Timing
  294. BCAL calibration links, 2020, PrimEx, SRC
  295. BCAL cosmics
  296. BCAL hadronic efficiencies
  297. BCAL reconstruction 01/16/2012
  298. BCAL reconstruction 03/07/2013
  299. BCAL reconstruction 10/19/11
  300. BCAL reconstruction 11/28/11
  301. BCAL reconstruction 8/24/11
  302. BCAL reconstruction 9/21/11
  303. BCAL reconstruction test with pi0
  304. BCal Beam Test Plots, April 10, 2007
  305. BCal Beam Test Plots, April 4, 2007
  306. BCal Beam Test Plots, August 28, 2007
  307. BCal Beam Test Plots, December 15, 2006
  308. BCal Beam Test Plots, December 19, 2006
  309. BCal Beam Test Plots, March 8, 2007
  310. BCal Beam Test Plots, May 8, 2007
  311. BCal Raw ADC Plots, June 18, 2007
  312. BCal Timing Resolution Note
  313. BLTWG Meeting 01/19/2015
  314. BLTWG Meeting 01/21/2013
  315. BLTWG Meeting 10/11/2007
  316. BLTWG Meeting 11/16/2007
  317. BLTWG Meeting 11/29/2007
  318. BLTWG Meeting 11/8/2007
  319. BLTWG Meeting 12/20/2007
  320. BLTWG Meeting 4/17/2008
  321. BLTWG Meeting 4/3/2008
  322. BLTWG Meeting 5/1/2008
  323. BLTWG Meeting 5/29/2008
  324. BLTWG Meeting 9/13/2007
  325. BLTWG Meeting 9/27/2007
  326. Baby BCAL at JLab
  327. Baby BCAL at JLab Photos
  328. Background studies
  329. Bar box darkening procedure
  330. Barrel Calorimeter
  331. Basic formalism for X-ray monochromator resolution
  332. Bcal Action Item Tracker
  333. Beam-induced background
  334. Beam-induced backgrounds
  335. Beam Data
  336. Beam Test Analyses and Results
  337. Beam Test Meeting Mon. Apr. 02, 2012
  338. Beam Test Meeting Mon. Apr. 09, 2012
  339. Beam Test Meeting Mon. Apr. 16, 2012
  340. Beam Test Meeting Mon. Apr. 23, 2012
  341. Beam Test Meeting Mon. Apr. 30, 2012
  342. Beam Test Meeting Mon. Mar. 19, 2012
  343. Beam Test Meeting Mon. Mar. 26, 2012
  344. Beam Test Meeting Mon. May. 07, 2012
  345. Beam Test Shift Schedule
  346. Beam commissioning: Fall 2014
  347. Beam commissioning in Fall 2014
  348. Beam halo measurements to assess background for PRad target TAC runs.
  349. Beam request (expect to run in 2021)
  350. Beam request (run in 2021)
  351. Beni's PMT replacement email
  352. Bggen-2017-01-ver03
  353. Bggen-2017-01-ver03.6
  354. Bggen-2018-01-ver02.2 bggen
  355. Bggen-2018-01-ver02 bggen
  356. Bggen-2018-08-ver02.2 bggen
  357. Bggen-2018-08-ver02 bggen
  358. Bill's to do list
  359. Blake CAP08 Abstract
  360. Bleed-through tests from other hall bunches
  361. BoardAgenda201001
  362. BoardAgenda201005
  363. BoardAgenda201009
  364. BoardAgenda201102
  365. BoardAgenda201105
  366. BoardAgenda201110
  367. BoardAgenda201202
  368. BoardAgenda201205
  369. BoardAgenda201210
  370. BoardAgenda201302
  371. BoardAgenda201306
  372. BoardAgenda201310
  373. BoardAgenda201402
  374. BoardAgenda201610
  375. BoardAgenda201702
  376. BoardAgenda201705
  377. BoardAgenda201710
  378. BoardAgenda201809
  379. BoardAgenda201905
  380. Brief Report on Yianna's ADC fits for SensL SiPMs
  381. Build on Github Pull Request
  382. Building HDDM support software
  383. Building Private Versions of GlueX Software: my halld build jlab
  384. Building a roof over src
  385. C++11 in Hall D Online
  386. CAEN V792N ADC
  387. CBAR Splitoff Software
  388. CB member who changes institutions
  389. CCAL preparation
  390. CCDB 0.09
  391. CCDB 1.00
  392. CCDB Author List Maintenance
  393. CCDB Example Session
  394. CCDB Schema Changes in Version 1.00
  395. CCDB Tables BCAL
  396. CCDB Tables CDC
  397. CCDB Tables FCAL
  398. CCDB Tables FDC
  399. CCDB Tables Photon Beam
  400. CCDB Tables Start Counter
  401. CCDB Tables TOF
  402. CCDB Wishlist
  403. CD3 geometry forward-region material effects
  404. CDC/FDC ASIC Discussion Meeting, September 3, 2008
  405. CDC/FDC Gas System GUI
  406. CDC 06 02 2008
  407. CDC 14 11 2007
  408. CDC 20 02 2008
  409. CDC 216 channels
  410. CDC 21 05 2008
  411. CDC 21 11 2007
  412. CDC 23 01 2008
  413. CDC 28 11 2007
  414. CDC 50/50 premix
  415. CDC 50 50
  416. CDC 55 45
  417. CDC 60 40
  418. CDC B field
  419. CDC Construction Complications Tracking
  420. CDC Electrical Hook Up Photos
  421. CDC Future MC Studies Discussion, October 1, 2008
  422. CDC HVB version 3
  423. CDC HV scan
  424. CDC HV scan instructions October 2021
  425. CDC High Voltage Board (HVB)
  426. CDC Hit Generation
  427. CDC NIM Elton
  428. CDC Pedestal Studies
  429. CDC Photos 2008
  430. CDC Readiness Checklist
  431. CDC Straw Sag photos
  432. CDC alcohol
  433. CDC amp dedx
  434. CDC and FDC readout tests
  435. CDC bad channels
  436. CDC channel numbers
  437. CDC commissioning plan
  438. CDC events
  439. CDC finding signal duration
  440. CDC garfield calcs
  441. CDC garfield drift vs gas mix
  442. CDC garfield xt table comparison
  443. CDC geometry April09
  444. CDC max drift times from Garfield
  445. CDC more garfield calcs
  446. CDC odd events
  447. CDC old & new preamp noise scope trace study
  448. CDC old preamp then and now
  449. CDC peak lengths
  450. CDC preamp LV checkup
  451. CDC prototype drift times
  452. CDC prototype fADC data
  453. CDC prototype flowrates
  454. CDC prototype more on timing
  455. CDC prototype more on timing 2
  456. CDC prototype more on timing 3
  457. CDC prototype runs at CMU
  458. CDC prototype tilted
  459. CDC q vs n
  460. CDC readout requirements
  461. CDC recent run drift times
  462. CDC run 1282 noise
  463. CDC run 1603 strawless ch
  464. CDC run 2016 drift time fits
  465. CDC run 2055
  466. CDC run 2551
  467. CDC run 2551 drift time fits
  468. CDC run 970
  469. CDC run 985
  470. CDC straight straws
  471. CDC straw number index
  472. CDC threshold scan procedure
  473. CDC tilted detectors
  474. CDC tilted detectors summary
  475. CDC time spikes
  476. CDC track angles (range of theta)
  477. CDC tracked and untracked cosmics
  478. CDC tracked and untracked cosmics 1950
  479. CDC tracked cosmics
  480. CDC transfer func attempt
  481. CDC wiggle wire positions
  482. CERNLIB Installation
  483. CFD Diff
  484. CFD Fifth - 90"
  485. CFD First - 50"
  486. CFD Fourth - 70"
  487. CFD Left
  488. CFD Right
  489. CFD Second - 10"
  490. CFD Sum
  491. CFD Third - 30"
  492. CHESS X-ray measurements 5/2009
  493. CHESS X-ray measurements 5/2011
  494. CLARA and Service Oriented Architectures
  495. CMU - Naomi's secondary event readout file
  496. CMU - fADC125
  497. CMU CLEAN ROOM
  498. CMU Data Challenge 2
  499. CMsgRootConsumer.cc
  500. CMsgRootMakefile

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)