Most linked-to pages

From GlueXWiki
Jump to: navigation, search

Showing below up to 250 results in range #31 to #280.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. CDC readout requirements‏‎ (36 links)
  2. Solenoid Controls Redesign‏‎ (34 links)
  3. Mcsmear updates‏‎ (34 links)
  4. CDC garfield calcs‏‎ (34 links)
  5. Analysis Studies‏‎ (34 links)
  6. Spring 2019 DIRC Commissioning‏‎ (33 links)
  7. Run Coordination Meetings:Fall2017 Spring2018 Run‏‎ (32 links)
  8. Solenoid Coil Test‏‎ (32 links)
  9. PrimEx-eta phase 3 (2022-08) BCAL pi0 calibration‏‎ (32 links)
  10. BCAL Beam Tests 2012‏‎ (31 links)
  11. File:FADC125 dataformat 250 modes.docx‏‎ (31 links)
  12. File:FADC250 modes 2.docx‏‎ (31 links)
  13. Analysis Studies Fall2016‏‎ (30 links)
  14. Spring 2016 Recon Checklist‏‎ (30 links)
  15. Analysis Studies Spring2017‏‎ (30 links)
  16. Offline Monitoring Data Validation‏‎ (29 links)
  17. File:FADC250 V2 ADC FPGA V90D.docx‏‎ (29 links)
  18. 2013 Software Review‏‎ (27 links)
  19. GlueX Offline FAQ‏‎ (25 links)
  20. SiPM Radiation Hardness Test‏‎ (24 links)
  21. GlueX-Collaboration-Oct-2014‏‎ (23 links)
  22. Sim1 Conditions‏‎ (23 links)
  23. 2017 mcsmear Workplan‏‎ (22 links)
  24. Run Coordination Meetings:Fall2022‏‎ (22 links)
  25. Private:Instructions for the TDR‏‎ (22 links)
  26. Spring 2015 Commissioning Simulations‏‎ (22 links)
  27. Monitoring R&D‏‎ (22 links)
  28. GlueX-Collaboration-May-2014‏‎ (21 links)
  29. GlueX/Hall-D Installation Meetings‏‎ (21 links)
  30. GlueX-Collaboration-Feb-2013‏‎ (21 links)
  31. Short term items‏‎ (20 links)
  32. Mcsmear 20160323‏‎ (20 links)
  33. OWG Meeting 11-Jan-2017‏‎ (20 links)
  34. GlueX Level-3 Trigger Meeting, Jul 22, 2016‏‎ (20 links)
  35. GlueX-Collaboration-May-2017‏‎ (20 links)
  36. DIRC Review Meeting‏‎ (19 links)
  37. GlueX-Collaboration-Feb-2016‏‎ (19 links)
  38. Π polarizability Software Meeting May 5, 2022‏‎ (19 links)
  39. Beam Simulations‏‎ (19 links)
  40. Time-of-Flight/Start-Counter Action Items‏‎ (19 links)
  41. Run Coordination Meetings:Summer2022‏‎ (18 links)
  42. Addressing ERR review recommendations‏‎ (18 links)
  43. CDC run 970‏‎ (17 links)
  44. GlueX TOF Meeting, May 4, 2022‏‎ (17 links)
  45. CPP Design Meetings‏‎ (17 links)
  46. CDC run 985‏‎ (17 links)
  47. September 2, 2014‏‎ (17 links)
  48. GlueX-Collaboration-Jun-2013‏‎ (17 links)
  49. User talk:Marki‏‎ (17 links)
  50. GlueX-Collaboration-Feb-2014‏‎ (17 links)
  51. GlueX-Collaboration-Feb-2015‏‎ (16 links)
  52. Level-3 Trigger‏‎ (16 links)
  53. GlueX-Collaboration-Oct-2012‏‎ (16 links)
  54. Run Coordination Meetings: Spring 2016 Run‏‎ (16 links)
  55. GlueX PID Meeting, May 16, 2023‏‎ (16 links)
  56. Private:Papers Under Review‏‎ (15 links)
  57. 2012 Offline Computing Schedule‏‎ (15 links)
  58. GlueX-Collaboration-May-2015‏‎ (15 links)
  59. GlueX-Collaboration-May-2016‏‎ (15 links)
  60. GlueX-Collaboration-Oct-2013‏‎ (15 links)
  61. Beam Test Software‏‎ (15 links)
  62. GlueX-Collaboration-Oct-2015‏‎ (15 links)
  63. Trigger Working Group Meetings‏‎ (14 links)
  64. CPP and NPP Run Conditions‏‎ (14 links)
  65. TOF DAQ Tasks, January 22, 2015‏‎ (14 links)
  66. Beam Test Run Plan‏‎ (14 links)
  67. Electronics‏‎ (14 links)
  68. Calibration Challenge‏‎ (14 links)
  69. BLTWG Meeting 03/29/2023‏‎ (14 links)
  70. Fall 2014 Commissioning Simulations‏‎ (14 links)
  71. Conferences‏‎ (14 links)
  72. Test Setup for SiPMs‏‎ (14 links)
  73. Solenoid Current Studies‏‎ (14 links)
  74. Online Major Milestones‏‎ (14 links)
  75. DAQ Tasks for Spring 2015 Commissioning Run‏‎ (14 links)
  76. GlueX-Collaboration-Oct-2016‏‎ (13 links)
  77. 2011 Hall B FCAL Beam Test‏‎ (13 links)
  78. GlueX-Collaboration-Feb-2017‏‎ (13 links)
  79. Fall 2019 DIRC Commissioning‏‎ (13 links)
  80. August 29, 2014 PID Upgrade‏‎ (13 links)
  81. GlueX Communications‏‎ (13 links)
  82. GlueX-Collaboration-Feb-2012‏‎ (13 links)
  83. Getting started with GlueX Software‏‎ (13 links)
  84. DIRC Planning for FY16‏‎ (13 links)
  85. RunPeriod-2017-01 Validation‏‎ (13 links)
  86. Physics Analysis‏‎ (13 links)
  87. Software Review 4‏‎ (13 links)
  88. Calibration and Monitoring System Meetings‏‎ (12 links)
  89. GlueX-Collaboration-May-2010‏‎ (12 links)
  90. Beam Test Hardware‏‎ (12 links)
  91. GlueX-Collaboration-Jan-2011‏‎ (12 links)
  92. GlueX-Collaboration-Sep-2011‏‎ (12 links)
  93. GlueX Bluejeans Video Conferencing‏‎ (12 links)
  94. GlueX-Collaboration-June-2018‏‎ (12 links)
  95. Run Coordination Meetings:Fall2018 Run‏‎ (11 links)
  96. Remote Access Instructions for Collaboration Meeting, January 28-30, 2010‏‎ (11 links)
  97. Using the Grid‏‎ (11 links)
  98. GlueX PAC 2010‏‎ (11 links)
  99. Topics for the 2015 Software Review‏‎ (11 links)
  100. FA125 Data Format July 7, 2015‏‎ (11 links)
  101. Data Challenge 3‏‎ (11 links)
  102. GlueX-Collaboration-Jun-2012‏‎ (11 links)
  103. GlueX Offline Software‏‎ (11 links)
  104. Software Review 3‏‎ (11 links)
  105. Online Projects‏‎ (11 links)
  106. GlueX Analysis Workshop 2013‏‎ (10 links)
  107. Coding Conventions‏‎ (10 links)
  108. GlueX-Collaboration-Oct-2019‏‎ (10 links)
  109. Beam Test Cabling‏‎ (10 links)
  110. GlueX-Collaboration-Feb-2018‏‎ (10 links)
  111. GlueX-Collaboration-Sept-2008‏‎ (10 links)
  112. Sim-Recon Tagged Releases‏‎ (10 links)
  113. PAC Proposals‏‎ (10 links)
  114. Run Coordination Meetings:Spring2019 Run‏‎ (10 links)
  115. Offline Software‏‎ (10 links)
  116. GlueX Start Counter Meeting, March 31, 2022‏‎ (10 links)
  117. GlueX Physics‏‎ (10 links)
  118. GlueX-Collaboration-May-2019‏‎ (10 links)
  119. May 27, 2010 Calorimetry‏‎ (9 links)
  120. File:FADC125 DataFormat v5 06.pdf‏‎ (9 links)
  121. Commissioning Calibration Data‏‎ (9 links)
  122. Sep 2, 2008 Calorimetry‏‎ (9 links)
  123. Start Counter Simulations‏‎ (9 links)
  124. BCAL‏‎ (9 links)
  125. Data Monitoring Procedures‏‎ (9 links)
  126. GlueX-II and DIRC ERR‏‎ (9 links)
  127. For the third coil‏‎ (9 links)
  128. Magnetic Field Maps for Solenoid‏‎ (9 links)
  129. Sim-RP-2017-01-ver01 Conditions‏‎ (9 links)
  130. Online Action Items‏‎ (9 links)
  131. GlueX-Collaboration-Sep-2009‏‎ (9 links)
  132. Data Challenge 2: Ideas‏‎ (9 links)
  133. Readiness Review: Testing of light sensors for Bcal‏‎ (9 links)
  134. GlueX-Collaboration-Feb-2020‏‎ (9 links)
  135. SQLite-form of the CCDB database‏‎ (9 links)
  136. Meeting-5-9-2019‏‎ (9 links)
  137. Private:Fiber Specs‏‎ (9 links)
  138. Run Coordination Meetings:Summer2020‏‎ (9 links)
  139. 2017-01 recon ver02 plans‏‎ (9 links)
  140. GlueX Physics Workshop 2016‏‎ (9 links)
  141. Sim-RP-2017-01-ver02 Conditions‏‎ (8 links)
  142. Automatic Tests of GlueX Software‏‎ (8 links)
  143. Checking the FCAL gains‏‎ (8 links)
  144. GlueX Start Counter Meeting, June 29, 2017‏‎ (8 links)
  145. FDC‏‎ (8 links)
  146. Software and Computing Review 6‏‎ (8 links)
  147. Oct 15, 2008 Calorimetry‏‎ (8 links)
  148. 2015 October 14 DIRC Project Review‏‎ (8 links)
  149. GlueX-Collaboration-May-2011‏‎ (8 links)
  150. Run Table‏‎ (8 links)
  151. GlueX Start Counter Meeting, December 8, 2022‏‎ (8 links)
  152. Meetings‏‎ (8 links)
  153. High Intensity Running‏‎ (8 links)
  154. Reconstruction References‏‎ (8 links)
  155. RunPeriod-2017-01 Reconstruction‏‎ (8 links)
  156. Nightly Builds of GlueX Software‏‎ (8 links)
  157. Photon Beam‏‎ (8 links)
  158. Analysis Launch Plugin Requirements‏‎ (8 links)
  159. GlueX-Collaboration-Sep-2010‏‎ (8 links)
  160. Summer 2013 Manpower Contributions‏‎ (8 links)
  161. FA125 Data Format Sep 22, 2015‏‎ (8 links)
  162. January 3, 2014 Installation‏‎ (8 links)
  163. Level-3 Trigger Meetings‏‎ (8 links)
  164. GlueX TOF Meeting, March 8, 2016‏‎ (8 links)
  165. File:FA125 format v5 01.pdf‏‎ (8 links)
  166. Meeting-2-7-2019‏‎ (8 links)
  167. Remote shift concepts‏‎ (8 links)
  168. Detailed plan for testing production SiPM units‏‎ (8 links)
  169. Run Coordination Meetings:Summer2021‏‎ (7 links)
  170. May 2008 Subsystem Review‏‎ (7 links)
  171. GlueX Physics Strong Decay Models‏‎ (7 links)
  172. GlueX Target Meeting, July 12, 2011‏‎ (7 links)
  173. CPP Test 2020 - Schedule‏‎ (7 links)
  174. Spring 2016 Trigger Summary‏‎ (7 links)
  175. GlueX TOF Meeting, July 11, 2017‏‎ (7 links)
  176. Instrumentation Publications‏‎ (7 links)
  177. August 13, 2014 Calibration‏‎ (7 links)
  178. File:FA125 format v5 03.pdf‏‎ (7 links)
  179. OWG Meeting 24-Nov-2010‏‎ (7 links)
  180. Calorimetry F250 Firmware‏‎ (7 links)
  181. Π polarizability Meeting Nov 9, 2016‏‎ (7 links)
  182. Tagger Magnetic Field Mapping‏‎ (7 links)
  183. October 7, 2009 Software‏‎ (7 links)
  184. FA125 Update January 28, 2016‏‎ (7 links)
  185. Run Coordination Meetings: Fall 2015 Run‏‎ (7 links)
  186. Private:Service Statements‏‎ (7 links)
  187. Papers Under Review‏‎ (7 links)
  188. Tagger Magnetic Field Mapping Analysis‏‎ (7 links)
  189. First look at TOF calibration‏‎ (7 links)
  190. Beam Test Trigger and electronics‏‎ (7 links)
  191. GlueX Start Counter Meeting, March 24, 2016‏‎ (7 links)
  192. GlueX Start Counter Meeting, March 8, 2018‏‎ (7 links)
  193. GlueX Physics Lattice QCD Calculations‏‎ (7 links)
  194. GlueX Offline Meeting, December 1, 2009‏‎ (7 links)
  195. OWG Meeting 21-Sep-2016‏‎ (7 links)
  196. Beam Commissioning Plan‏‎ (7 links)
  197. RF Calibration‏‎ (7 links)
  198. GlueX Physics Photoproduction‏‎ (7 links)
  199. All modules (with SICCAS crystals) are removed‏‎ (7 links)
  200. Posters‏‎ (7 links)
  201. Background Rate Studies‏‎ (7 links)
  202. Run Coordination Meetings: Spring 2017 Run‏‎ (7 links)
  203. Calibration Database‏‎ (7 links)
  204. GlueX Phase III Planning‏‎ (7 links)
  205. HallD Online IP Name And Address Conventions‏‎ (7 links)
  206. Photon Beam Design Requirements‏‎ (7 links)
  207. Simple Email Lists‏‎ (7 links)
  208. GlueX Physics Review Papers‏‎ (7 links)
  209. June 10, 2014‏‎ (7 links)
  210. Conversion from Subversion to Git‏‎ (7 links)
  211. GlueX-Collaboration-Sep-2018‏‎ (7 links)
  212. Action Items From Hall D Offline Meetings‏‎ (7 links)
  213. GlueX Start Counter Meeting, April 18, 2013‏‎ (6 links)
  214. GlueX Start Counter Meeting, August 21, 2014‏‎ (6 links)
  215. Oct 26, 2010 Calibration/Monitoring‏‎ (6 links)
  216. January 31, 2014 PID Upgrade‏‎ (6 links)
  217. Software and Computing Review 5‏‎ (6 links)
  218. Fall-2018-Running‏‎ (6 links)
  219. HOWTO set up the GlueX environment‏‎ (6 links)
  220. Online Design Goals‏‎ (6 links)
  221. Preamp 4: Comparison of cosmic data with original preamp‏‎ (6 links)
  222. GlueX Start Counter Meeting, November 17, 2011‏‎ (6 links)
  223. July 1, 2009 Software‏‎ (6 links)
  224. For the second coil‏‎ (6 links)
  225. Reconstruction Tasks and Topics for Further Development‏‎ (6 links)
  226. Constants to Review‏‎ (6 links)
  227. Run Coordination Meetings:Fall2019 Run‏‎ (6 links)
  228. 2020 Data Production‏‎ (6 links)
  229. Start Counter‏‎ (6 links)
  230. GlueX-Collaboration-Jan-2009‏‎ (6 links)
  231. GlueX-Collaboration-May-2022‏‎ (6 links)
  232. GlueX Publication Policies‏‎ (6 links)
  233. HOWTO use a pre-built release‏‎ (6 links)
  234. GlueX-related shared accounts on the JLab CUE‏‎ (6 links)
  235. Detector Rates and Lifetime‏‎ (6 links)
  236. ADC data‏‎ (6 links)
  237. Meeting-11-30-2017‏‎ (6 links)
  238. Tagged Beam Group Engineering Drawings‏‎ (6 links)
  239. Options for Radiation-Hard Insert‏‎ (6 links)
  240. Calibration-Monitoring‏‎ (6 links)
  241. December 5, 2016, Analysis Working Group‏‎ (6 links)
  242. Main Page‏‎ (6 links)
  243. SiPM Database‏‎ (6 links)
  244. GlueX Offline Meeting, December 15, 2009‏‎ (6 links)
  245. GlueX Offline Meeting, February 23, 2010‏‎ (6 links)
  246. GlueX Target Design Review, September 29, 2011‏‎ (6 links)
  247. June 17, 2009 Software‏‎ (6 links)
  248. GlueX-Collaboration-May-2008‏‎ (6 links)
  249. GlueX Offline Meeting, May 4, 2010‏‎ (6 links)
  250. GlueX Start Counter Meeting, August 9, 2018‏‎ (6 links)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)