Pages with the fewest revisions

From GlueXWiki
Jump to: navigation, search

Showing below up to 500 results in range #501 to #1,000.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. First signals‏‎ (2 revisions)
  2. April 10, 2024 Calorimeter‏‎ (2 revisions)
  3. JEF meeting, March 20, 2020‏‎ (2 revisions)
  4. Minutes-4-3-2008‏‎ (2 revisions)
  5. Random Number Seeds Procedure (as of 2014-03-07)‏‎ (2 revisions)
  6. GlueX Start Counter Meeting, October 14, 2021‏‎ (2 revisions)
  7. Minutes 9-5-2007‏‎ (2 revisions)
  8. Regina Group Meeting, Nov 20, 2006‏‎ (2 revisions)
  9. Π polarizability Meeting Sep. 28, 2012‏‎ (2 revisions)
  10. Mar 29, 2013 Design Meeting‏‎ (2 revisions)
  11. March 18, 2011 Design Meeting‏‎ (2 revisions)
  12. Jan 13‏‎ (2 revisions)
  13. GlueX PID Meeting, Febuary 14, 2019‏‎ (2 revisions)
  14. GlueX TOF Meeting, May 8, 2019‏‎ (2 revisions)
  15. Controls Meeting 24-Jun-2021‏‎ (2 revisions)
  16. December 22, 2022‏‎ (2 revisions)
  17. Minutes-2-19-2009‏‎ (2 revisions)
  18. Minutes 1-24-2008‏‎ (2 revisions)
  19. CDC prototype afterpulses‏‎ (2 revisions)
  20. Π polarizability Meeting Nov 15, 2018‏‎ (2 revisions)
  21. Controls Meeting 8-Jun-2017‏‎ (2 revisions)
  22. Mar 10‏‎ (2 revisions)
  23. BLTWG Meeting 07/20/2021‏‎ (2 revisions)
  24. DE/dx 250 MeV pions/kaons‏‎ (2 revisions)
  25. Π polarizability Meeting Feb 6, 2018‏‎ (2 revisions)
  26. HDGeant4 Meeting, July 13, 2021‏‎ (2 revisions)
  27. Jan 25, 2018 Calorimeter‏‎ (2 revisions)
  28. GlueX TOF Meeting, April 24, 2019‏‎ (2 revisions)
  29. October 12, 2023‏‎ (2 revisions)
  30. Training and Safety SRC‏‎ (2 revisions)
  31. Nodes at JLab for Data Challenge 2‏‎ (2 revisions)
  32. January 11, 2024‏‎ (2 revisions)
  33. BCal Beam Test Plots, December 15, 2006‏‎ (2 revisions)
  34. Dec 2019 Simulation branches‏‎ (2 revisions)
  35. October 6, 2008 Tracking CDC/FDC‏‎ (2 revisions)
  36. Jun 28, 2018 Calorimeter‏‎ (2 revisions)
  37. GlueX PID Meeting, July 25, 2022‏‎ (2 revisions)
  38. Minutes-2-5-2009‏‎ (2 revisions)
  39. June 19, 2012 Design Meeting‏‎ (2 revisions)
  40. April 06, 2009 Tracking CDC/FDC‏‎ (2 revisions)
  41. GlueX Start Counter Meeting, June 28, 2018‏‎ (2 revisions)
  42. Π polarizability Meeting Aug 19, 2013‏‎ (2 revisions)
  43. JEF meeting, March 10, 2017‏‎ (2 revisions)
  44. 2021-07-29‏‎ (2 revisions)
  45. Π polarizability Meeting Nov 7, 2017‏‎ (2 revisions)
  46. June 29, 2006‏‎ (2 revisions)
  47. Conference Call, August 22, 2006‏‎ (2 revisions)
  48. Minutes-5-22-2008‏‎ (2 revisions)
  49. Reconstruction, March 2, 2010 Physics‏‎ (2 revisions)
  50. Beam Test Meeting Mon. Apr. 09, 2012‏‎ (2 revisions)
  51. Π polarizability Meeting Jan 16, 2018‏‎ (2 revisions)
  52. HDGeant4 Meeting, June 29, 2021‏‎ (2 revisions)
  53. Π polarizability Meeting Sep 6, 2016‏‎ (2 revisions)
  54. Physics Simulation Meetings‏‎ (2 revisions)
  55. 2008-06-04‏‎ (2 revisions)
  56. JEF meeting, August 26, 2022‏‎ (2 revisions)
  57. October 26, 2022 Calorimeter‏‎ (2 revisions)
  58. University MOUs and Contracts‏‎ (2 revisions)
  59. GlueX PID Meeting, December 13, 2022‏‎ (2 revisions)
  60. Meeting 2022 03 07‏‎ (2 revisions)
  61. GlueX Start Counter Meeting, February 6, 2020‏‎ (2 revisions)
  62. November 10, 2022‏‎ (2 revisions)
  63. GlueX PID Meeting, March 12, 2020‏‎ (2 revisions)
  64. Meeting 2022 11 28‏‎ (2 revisions)
  65. CDC HV scan‏‎ (2 revisions)
  66. Π polarizability Meeting Apr 22, 2020‏‎ (2 revisions)
  67. Π polarizability Meeting Apr 3, 2024‏‎ (2 revisions)
  68. Software Documentation Structure‏‎ (2 revisions)
  69. August 18, 2022‏‎ (2 revisions)
  70. Tests for ASIC design optimizations‏‎ (2 revisions)
  71. Minutes 12-20-2006‏‎ (2 revisions)
  72. November 20, 2015 PID Upgrade‏‎ (2 revisions)
  73. Minutes 2-7-2008‏‎ (2 revisions)
  74. JEF meeting, November 22, 2019‏‎ (2 revisions)
  75. GlueX TOF Meeting, August 23, 2016‏‎ (2 revisions)
  76. August 21, 2015 PID Upgrade‏‎ (2 revisions)
  77. BLTWG Meeting 01/19/2015‏‎ (2 revisions)
  78. GlueX Start Counter Meeting, December 12, 2019‏‎ (2 revisions)
  79. Chi-squared tracker‏‎ (2 revisions)
  80. December 14, 2023‏‎ (2 revisions)
  81. Run Coordinator report: Fall 2021 w13‏‎ (2 revisions)
  82. February 29, 2024‏‎ (2 revisions)
  83. Π polarizability Meeting Mar 22, 2019‏‎ (2 revisions)
  84. BLTWG Meeting 11/09/2022‏‎ (2 revisions)
  85. 2011-07-13‏‎ (2 revisions)
  86. GlueX PID Meeting, May 18, 2021‏‎ (2 revisions)
  87. Run Coordinator report: Spring 2018 r9‏‎ (2 revisions)
  88. March 7, 2024‏‎ (2 revisions)
  89. Meeting 2023 03 13‏‎ (2 revisions)
  90. Controls Meeting 3-Aug-2017‏‎ (2 revisions)
  91. FDC prototype magnet test status (Simon T.)‏‎ (2 revisions)
  92. Coil Test Weekly Meeting 29-Jul-2010‏‎ (2 revisions)
  93. JEF meeting, June 26, 2020‏‎ (2 revisions)
  94. Minutes 1-3-2007‏‎ (2 revisions)
  95. GlueX Target Design Mtg, Nov 19, 2013‏‎ (2 revisions)
  96. Run Coordinator report: fall 2022 w9‏‎ (2 revisions)
  97. Forward Calorimeter‏‎ (2 revisions)
  98. Prototypes of FDC online monitoring histograms‏‎ (2 revisions)
  99. Run Coordinator report: spring 2019 w9‏‎ (2 revisions)
  100. April 12, 2023, FCAL Insert Installation Meeting‏‎ (2 revisions)
  101. PSC-13 Coincidence Voltage Test‏‎ (2 revisions)
  102. Reconstruction‏‎ (2 revisions)
  103. Π polarizability Meeting Oct 19, 2018‏‎ (2 revisions)
  104. Eljen Technologies QA Evaluation Meeting, March 17, 2014‏‎ (2 revisions)
  105. HDGeant4 Meeting, July 14, 2020‏‎ (2 revisions)
  106. Mini FCAL Meeting Mon. Feb. 13, 2012‏‎ (2 revisions)
  107. Removing FCAL cables from the detector‏‎ (2 revisions)
  108. Beam request (run in 2021)‏‎ (2 revisions)
  109. Physics Analysis‏‎ (2 revisions)
  110. Nofield plan‏‎ (2 revisions)
  111. Run Planning Meeting Notes, Mar 19-Mar 28, 2018‏‎ (2 revisions)
  112. February 2, 2023‏‎ (2 revisions)
  113. GlueX TOF Meeting, December 1, 2015‏‎ (2 revisions)
  114. 2016-09-20‏‎ (2 revisions)
  115. FADC Data Format Apr 22, 2014‏‎ (2 revisions)
  116. HOWTO Run Gluex Software with a GCC 8 module‏‎ (2 revisions)
  117. TOF-17Apr09‏‎ (2 revisions)
  118. Meeting-9-6-2018‏‎ (2 revisions)
  119. 2017-07-18‏‎ (2 revisions)
  120. Kontron PC104 Hardware configuration‏‎ (2 revisions)
  121. Apr 13,2020 Tech group meeting‏‎ (2 revisions)
  122. February 8, 2024‏‎ (2 revisions)
  123. March 29, 2013 Installation‏‎ (2 revisions)
  124. Meeting 2022 09 19‏‎ (2 revisions)
  125. Π polarizability Meeting Mar 29, 2023‏‎ (2 revisions)
  126. FCAL insert fabrication‏‎ (2 revisions)
  127. 2011 Hall B Bcal Goals‏‎ (2 revisions)
  128. Coil Test Weekly Meeting 22-Apr-2011‏‎ (2 revisions)
  129. GlueX PID Meeting, November 30, 2021‏‎ (2 revisions)
  130. SRC FCAL calibration version 2‏‎ (2 revisions)
  131. June 19, 2015 PID Upgrade‏‎ (2 revisions)
  132. Hall D Work Disk Request‏‎ (2 revisions)
  133. Testing123‏‎ (2 revisions)
  134. Design of Monochromator for Diamond Diffraction‏‎ (2 revisions)
  135. Minutes 11-15-2007‏‎ (2 revisions)
  136. Π polarizability Meeting Nov 8, 2022‏‎ (2 revisions)
  137. June 29, 2009 Tracking CDC/FDC‏‎ (2 revisions)
  138. HDGeant4 Meeting, August 24, 2021‏‎ (2 revisions)
  139. Π polarizability Meeting Oct 30, 2019‏‎ (2 revisions)
  140. April 25, 2024‏‎ (2 revisions)
  141. Jan 30, 2024 PrimEx-eta (informal) Calibration & Analysis Meeting‏‎ (2 revisions)
  142. Responses from Kappos‏‎ (2 revisions)
  143. March 01 2023 Tech group meeting‏‎ (2 revisions)
  144. GlueX TOF Meeting, August 14, 2019‏‎ (2 revisions)
  145. 2016-03-01‏‎ (2 revisions)
  146. Explanation of ROOT tree leaves‏‎ (2 revisions)
  147. Dec 7, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting‏‎ (2 revisions)
  148. 2009-11-16‏‎ (2 revisions)
  149. December 1, 2022‏‎ (2 revisions)
  150. 2017-10-04‏‎ (2 revisions)
  151. OWG Meeting 25-Nov-2009‏‎ (2 revisions)
  152. Coil Test Weekly Meeting 15-Apr-2011‏‎ (2 revisions)
  153. December 2, 2014‏‎ (2 revisions)
  154. GlueX PID Meeting, March 14, 2019‏‎ (2 revisions)
  155. SRC-CT ReactionFilter‏‎ (2 revisions)
  156. Feedback from Joerg‏‎ (2 revisions)
  157. Π polarizability Meeting May 1, 2019‏‎ (2 revisions)
  158. Target Cheat Sheet‏‎ (2 revisions)
  159. Minutes 060829‏‎ (2 revisions)
  160. GlueX Target Design Mtg, April 12, 2013‏‎ (2 revisions)
  161. Software Review4 Meeting, September 9, 2016‏‎ (2 revisions)
  162. Production run, Spring 2019‏‎ (2 revisions)
  163. Π polarizability Meeting May 9, 2018‏‎ (2 revisions)
  164. PSC-15 Coincidence Voltage Test‏‎ (2 revisions)
  165. Patch panels and cables‏‎ (2 revisions)
  166. Conference Call, May 15, 2006‏‎ (2 revisions)
  167. Registering on the Wiki‏‎ (2 revisions)
  168. 2015-07-22‏‎ (2 revisions)
  169. September 19, 2013 PID Upgrade‏‎ (2 revisions)
  170. Pi0 Polarizability Meeting Aug 21, 2020‏‎ (2 revisions)
  171. FA125 Update April 14, 2015‏‎ (2 revisions)
  172. 2009, Physics Working Group‏‎ (2 revisions)
  173. September 8, 2022‏‎ (2 revisions)
  174. December 15, 2008 Tracking CDC/FDC‏‎ (2 revisions)
  175. Position and Energy Boundaries for all installed Counters‏‎ (2 revisions)
  176. Yves DNP07 Abstract‏‎ (2 revisions)
  177. Π polarizability Meeting Mar 22, 2023‏‎ (2 revisions)
  178. Sim-Recon Split Update, June 15, 2018‏‎ (2 revisions)
  179. BCAL Pb Sheet Widths‏‎ (2 revisions)
  180. List of channels to fix from Beni 20200729‏‎ (2 revisions)
  181. GlueX Start Counter Meeting, June 14, 2018‏‎ (2 revisions)
  182. BLTWG Meeting 05/11/2021‏‎ (2 revisions)
  183. Meeting 2023 12 11‏‎ (2 revisions)
  184. Minutes-3-6-2008‏‎ (2 revisions)
  185. (12-6-06)‏‎ (2 revisions)
  186. Sep 29, 2014 Design Meeting‏‎ (2 revisions)
  187. Feb 27, 2014 Calorimetry‏‎ (2 revisions)
  188. Elton Smith - The 12 GeV JLab Upgrade Project‏‎ (2 revisions)
  189. HDGeant4 Meeting, July 2, 2019‏‎ (2 revisions)
  190. September 12, 2008 Software‏‎ (2 revisions)
  191. May 18, 2017 Calorimeter‏‎ (2 revisions)
  192. Beni's PMT replacement email‏‎ (2 revisions)
  193. OWG Meeting 13-Aug-2014‏‎ (2 revisions)
  194. HDGeant4 Meeting, October 4, 2021‏‎ (2 revisions)
  195. GlueX TOF Meeting, December 1, 2021‏‎ (2 revisions)
  196. BoardAgenda201510‏‎ (2 revisions)
  197. Controls Meeting 17-May-2018‏‎ (2 revisions)
  198. FADC Data Format Apr 8, 2014‏‎ (2 revisions)
  199. GlueX Start Counter Meeting, August 20, 2020‏‎ (2 revisions)
  200. CCDB Example Session‏‎ (2 revisions)
  201. October 6, 2022‏‎ (2 revisions)
  202. Pi0 Polarizability Meeting may 7, 2020‏‎ (2 revisions)
  203. HOWTO merge events from different sources‏‎ (2 revisions)
  204. GlueX TOF Meeting, November 3, 2021‏‎ (2 revisions)
  205. Run Coordinator report: Spring 2017 r1‏‎ (2 revisions)
  206. Meeting 2022 09 26‏‎ (2 revisions)
  207. JEF meeting, July 7, 2023‏‎ (2 revisions)
  208. June 2, 2014‏‎ (2 revisions)
  209. Meeting 2024 03 18‏‎ (2 revisions)
  210. June 29, 2012 Design Meeting‏‎ (2 revisions)
  211. Π polarizability Meeting Feb 14, 2024‏‎ (2 revisions)
  212. November 30, 2009 Tracking CDC/FDC‏‎ (2 revisions)
  213. GlueX TOF Meeting, January 15, 2020‏‎ (2 revisions)
  214. Π polarizability Meeting Oct 31, 2013‏‎ (2 revisions)
  215. April 26, 2010 (11AM), Physics Working Group‏‎ (2 revisions)
  216. GlueX Start Counter Meeting, September 4, 2014‏‎ (2 revisions)
  217. September 14, 2023‏‎ (2 revisions)
  218. Start Counter Drawings‏‎ (2 revisions)
  219. March 03, 2022 KLONG Phase II Design Meeting‏‎ (2 revisions)
  220. February 14, 2017 DIRC‏‎ (2 revisions)
  221. Summary Spring 2017 Run‏‎ (2 revisions)
  222. January 14, 2014 Tracking CDC/FDC/FADC‏‎ (2 revisions)
  223. GlueX TOF Meeting, March 10, 2015‏‎ (2 revisions)
  224. October 26, 2023‏‎ (2 revisions)
  225. Jun 12, 2012 Readout‏‎ (2 revisions)
  226. January 22, 2019 DIRC‏‎ (2 revisions)
  227. GlueX PID Meeting, December 15, 2020‏‎ (2 revisions)
  228. August 5, 2022 Tech group meeting‏‎ (2 revisions)
  229. Where Do I Start with GlueX Software?‏‎ (2 revisions)
  230. Π polarizability Meeting Mar 11, 2020‏‎ (2 revisions)
  231. Controls Meeting 23-Jan-2020‏‎ (2 revisions)
  232. GlueX Start Counter Meeting, February 7, 2019‏‎ (2 revisions)
  233. SiPM Readout Electronics Design‏‎ (2 revisions)
  234. January 4, 2023 Calorimeter‏‎ (2 revisions)
  235. March 4‏‎ (2 revisions)
  236. BCAL Gain Calibration‏‎ (2 revisions)
  237. CDC High Voltage Board (HVB)‏‎ (2 revisions)
  238. Controls Meeting 28-Jun-2018‏‎ (2 revisions)
  239. GlueX Start Counter Meeting, July 26, 2018‏‎ (2 revisions)
  240. November 2, 2015, Physics Working Group‏‎ (2 revisions)
  241. Jul 21, 2011 SiPM Electrical and Cooling‏‎ (2 revisions)
  242. JEF meeting, June 16, 2017‏‎ (2 revisions)
  243. Run Coordinator report: fall 2022 w14‏‎ (2 revisions)
  244. Meeting 2023 09 25‏‎ (2 revisions)
  245. CDC geometry April09‏‎ (2 revisions)
  246. Π polarizability Meeting Aug 5, 2020‏‎ (2 revisions)
  247. PSC-18 Background Voltage Test‏‎ (2 revisions)
  248. Comments on draft 1 of pac presentation‏‎ (2 revisions)
  249. Minutes 3-21-2007‏‎ (2 revisions)
  250. Π polarizability Meeting Oct 14, 2019‏‎ (2 revisions)
  251. 2014-08-14‏‎ (2 revisions)
  252. BCAL Reconstruction Meeting 2015-10-15‏‎ (2 revisions)
  253. GlueX TOF Meeting, January 26, 2022‏‎ (2 revisions)
  254. JEF meeting, September 17, 2021‏‎ (2 revisions)
  255. HDGeant4 Meeting, May 4, 2021‏‎ (2 revisions)
  256. Start Counter geometry changes‏‎ (2 revisions)
  257. GlueX/PANDA/EIC Machine Learning Workshop, May 25-29, 2020, Darmstadt, Germany‏‎ (2 revisions)
  258. February 16, 2023‏‎ (2 revisions)
  259. Π polarizability Meeting July 12, 2023‏‎ (2 revisions)
  260. OWG Meeting 17-Dec-2014‏‎ (2 revisions)
  261. TAC V-wire commissioning‏‎ (2 revisions)
  262. August 29, 2022 FCAL Insert Installation Meeting‏‎ (2 revisions)
  263. Meeting-6-14-2018‏‎ (2 revisions)
  264. 2010-05-19‏‎ (2 revisions)
  265. January 26, 2023‏‎ (2 revisions)
  266. Minutes-11-5-2009‏‎ (2 revisions)
  267. June 17, 2015 Calibration‏‎ (2 revisions)
  268. Minutes 1-31-2008‏‎ (2 revisions)
  269. Minutes 5-9-2007‏‎ (2 revisions)
  270. May 10, 2018 DIRC Optical Box‏‎ (2 revisions)
  271. GlueX TOF Meeting, February 24, 2015‏‎ (2 revisions)
  272. ASIC meeting June 2x, 2010‏‎ (2 revisions)
  273. BCAL Reconstruction Task list‏‎ (2 revisions)
  274. GlueX TOF Meeting, April 6, 2022‏‎ (2 revisions)
  275. October 13, 2022‏‎ (2 revisions)
  276. July 29, 2014 BCAL Commissioning‏‎ (2 revisions)
  277. Calorimetry‏‎ (2 revisions)
  278. March 13, 2024 Calorimeter‏‎ (2 revisions)
  279. Π polarizability Meeting July 5, 2023‏‎ (2 revisions)
  280. January 19, 2023‏‎ (2 revisions)
  281. CCDB Schema Changes in Version 1.00‏‎ (2 revisions)
  282. Kuraray No of pe - April 2, 2009‏‎ (2 revisions)
  283. Nov 8, 2013 Design Meeting‏‎ (2 revisions)
  284. Tagged Beam Group Meetings 2009‏‎ (2 revisions)
  285. Running Spring 2017‏‎ (2 revisions)
  286. Old Physics Analysis Old Physics Analysis‏‎ (2 revisions)
  287. June 12, 2015 PID Upgrade‏‎ (2 revisions)
  288. 2012, Physics Working Group‏‎ (2 revisions)
  289. November 18, 2016 PID Upgrade‏‎ (2 revisions)
  290. BLTWG Meeting 04/13/2022‏‎ (2 revisions)
  291. Minutes 060519‏‎ (2 revisions)
  292. GlueX Start Counter Meeting, June 30, 2016‏‎ (2 revisions)
  293. GlueX Target Meeting, May 22, 2014‏‎ (2 revisions)
  294. Gas Systems‏‎ (2 revisions)
  295. Meetings-10-15-2020‏‎ (2 revisions)
  296. Minutes-4-23-2015‏‎ (2 revisions)
  297. Mar 15, 2013 Design Meeting‏‎ (2 revisions)
  298. May 27,2020 Tech group meeting‏‎ (2 revisions)
  299. Π polarizability Meeting Feb 15, 2019‏‎ (2 revisions)
  300. Π polarizability Meeting Oct 4, 2022‏‎ (2 revisions)
  301. HDGeant4 Meeting, March 10, 2020‏‎ (2 revisions)
  302. August 2, 2018 DIRC Optical Box‏‎ (2 revisions)
  303. July 31, 2006 Software‏‎ (2 revisions)
  304. GlueX TOF Meeting, March 10, 2021‏‎ (2 revisions)
  305. Update on tracking residuals‏‎ (2 revisions)
  306. HOWTO build and install GEANT4.10.02 on OS X‏‎ (2 revisions)
  307. TOF Rates 2023‏‎ (2 revisions)
  308. GlueX PID Meeting, December 20, 2018‏‎ (2 revisions)
  309. CDC/FDC ASIC Discussion Meeting, September 3, 2008‏‎ (2 revisions)
  310. Controls Meeting 23-Jul-2015‏‎ (2 revisions)
  311. GlueX Start Counter Meeting, February 8, 2018‏‎ (2 revisions)
  312. SiPM Test Log‏‎ (2 revisions)
  313. January 4, 2024‏‎ (2 revisions)
  314. GlueX PID Meeting, March 22, 2022‏‎ (2 revisions)
  315. Controls Meeting 28-May-2015‏‎ (2 revisions)
  316. GlueX Start Counter Meeting, July 27, 2017‏‎ (2 revisions)
  317. Π polarizability Meeting Apr 5, 2023‏‎ (2 revisions)
  318. GlueX Target Design Mtg, February 22, 2013‏‎ (2 revisions)
  319. Meeting 2023 10 02‏‎ (2 revisions)
  320. CDC max drift times from Garfield‏‎ (2 revisions)
  321. GlueX Start Counter Meeting, March 31, 2022‏‎ (2 revisions)
  322. Hit pruning has been tuned and "broken track" recovery is now on by default‏‎ (2 revisions)
  323. Minutes 3-28-2007‏‎ (3 revisions)
  324. Π polarizability Meeting Sep 12, 2017‏‎ (3 revisions)
  325. Tracking / extrapolation to MWPCs‏‎ (3 revisions)
  326. January 06, 2012 Design Meeting‏‎ (3 revisions)
  327. Calibration Constants, Tagged Versions‏‎ (3 revisions)
  328. March 11, 2015 Calibration‏‎ (3 revisions)
  329. GlueX PID Meeting, January 25, 2022‏‎ (3 revisions)
  330. 2018-03-27‏‎ (3 revisions)
  331. Controls Meeting 25-Jan-2018‏‎ (3 revisions)
  332. December 3, 2012 (11:30AM), Physics Working Group‏‎ (3 revisions)
  333. August 15, 2014 PID Upgrade‏‎ (3 revisions)
  334. Meeting 2023 04 03‏‎ (3 revisions)
  335. Π polarizability Meeting May 2, 2023‏‎ (3 revisions)
  336. FSU Data Challenge 2‏‎ (3 revisions)
  337. JEF meeting, June 30, 2023‏‎ (3 revisions)
  338. GlueX Target Design Review, January 24, 2012‏‎ (3 revisions)
  339. Software Review January 6, 2015‏‎ (3 revisions)
  340. BCAL Reconstruction Meeting 2013-06-20‏‎ (3 revisions)
  341. RCDB Conditions Help‏‎ (3 revisions)
  342. GlueX Software Meeting, February 16, 2022‏‎ (3 revisions)
  343. Impact of FDC Design on Momentum Resolution‏‎ (3 revisions)
  344. GlueX TOF Meeting, February 27, 2019‏‎ (3 revisions)
  345. CPP Scintillators‏‎ (3 revisions)
  346. GlueX TOF Meeting, July 12, 2016‏‎ (3 revisions)
  347. Π polarizability Meeting Sep 27, 2022‏‎ (3 revisions)
  348. Dec 1, 2011 SiPM Electrical and Cooling‏‎ (3 revisions)
  349. GlueX TOF Meeting, April 8, 2020‏‎ (3 revisions)
  350. Studies of Direct Photon Polarimetry Options‏‎ (3 revisions)
  351. August 26, 2010 Des/Fab Meeting‏‎ (3 revisions)
  352. September 29, 2022‏‎ (3 revisions)
  353. GlueX PID Meeting, August 20, 2010‏‎ (3 revisions)
  354. 2017-08-02‏‎ (3 revisions)
  355. L1 Trigger‏‎ (3 revisions)
  356. Controls Meeting 22-Jun-2017‏‎ (3 revisions)
  357. Jan 18, 2022 PrimEx-Eta (informal) Calibration & Analysis Meeting‏‎ (3 revisions)
  358. GlueX Start Counter Meeting, February 17, 2022‏‎ (3 revisions)
  359. GlueX TOF Meeting, November 4, 2020‏‎ (3 revisions)
  360. Meeting 2022 10 10‏‎ (3 revisions)
  361. OWG Meeting 30-Jan-2013‏‎ (3 revisions)
  362. Jul 14, 2011 SiPM Electrical and Cooling‏‎ (3 revisions)
  363. June 20, 2011 (11:30AM), Physics Working Group‏‎ (3 revisions)
  364. BLTWG Meeting 12/22/2020‏‎ (3 revisions)
  365. Meetings-10-21-2021‏‎ (3 revisions)
  366. Jan 2, 2024 HallD AI/ML meeting‏‎ (3 revisions)
  367. Jan 31, 2014 Design Meeting‏‎ (3 revisions)
  368. May 20, 2021 CPP Design Meeting‏‎ (3 revisions)
  369. October 19, 2015, Physics Working Group‏‎ (3 revisions)
  370. Alignment‏‎ (3 revisions)
  371. JEF meeting Jan 26, 2015‏‎ (3 revisions)
  372. 2008-07-30‏‎ (3 revisions)
  373. GlueX TOF Meeting, March 11, 2020‏‎ (3 revisions)
  374. March 16, 2012 Fab Meeting‏‎ (3 revisions)
  375. OWG Meeting 2-Sep-2009‏‎ (3 revisions)
  376. August 7, 2015 PID Upgrade‏‎ (3 revisions)
  377. Plots for informal island algorithm discussion‏‎ (3 revisions)
  378. March 4-10‏‎ (3 revisions)
  379. BCAL Installation‏‎ (3 revisions)
  380. OWG Meeting 5-May-2016‏‎ (3 revisions)
  381. Coil Test Weekly Meeting 27-Aug-2009‏‎ (3 revisions)
  382. December 9, 2011 Fab Meeting‏‎ (3 revisions)
  383. Run Coordinator report: spring 2019 w11‏‎ (3 revisions)
  384. Commissioning Event Rates‏‎ (3 revisions)
  385. May 06, 2021 CPP Design Meeting‏‎ (3 revisions)
  386. GlueX TOF Meeting, December 6, 2017‏‎ (3 revisions)
  387. Π polarizability Meeting Oct 15, 2015‏‎ (3 revisions)
  388. GlueX Start Counter Meeting, October 20, 2016‏‎ (3 revisions)
  389. Background studies‏‎ (3 revisions)
  390. GlueX TOF Meeting, January 27, 2021‏‎ (3 revisions)
  391. GlueX TOF Meeting, April 14, 2015‏‎ (3 revisions)
  392. July 28, 2008 Tracking CDC/FDC‏‎ (3 revisions)
  393. 2007-07-18‏‎ (3 revisions)
  394. January 06, 2012 Fab Meeting‏‎ (3 revisions)
  395. 2009-02-25‏‎ (3 revisions)
  396. JEF meeting, December 13, 2019‏‎ (3 revisions)
  397. Minutes-7-30-2009‏‎ (3 revisions)
  398. Run Coordination Meetings: Fall 2015 min09 22‏‎ (3 revisions)
  399. 2017-05-24‏‎ (3 revisions)
  400. Nov 30, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting‏‎ (3 revisions)
  401. September 9, 2016 PID Upgrade‏‎ (3 revisions)
  402. Controls Meeting 25-Jan-2024‏‎ (3 revisions)
  403. Π polarizability Meeting May 20, 2014‏‎ (3 revisions)
  404. Controls Meeting 30-Mar-2017‏‎ (3 revisions)
  405. Fabrication‏‎ (3 revisions)
  406. 2012 Offline Computing Schedule‏‎ (3 revisions)
  407. Hall D Majordomo Email Archives‏‎ (3 revisions)
  408. GlueX Target Design Review, September 29, 2011‏‎ (3 revisions)
  409. Full Crate Acceptance‏‎ (3 revisions)
  410. Run Coordinator report: summer 2022 w4‏‎ (3 revisions)
  411. June 26, 2014 BCAL Commissioning‏‎ (3 revisions)
  412. May 31, 2013 Fab Meeting‏‎ (3 revisions)
  413. Oct 3, 2023 HallD AI/ML meeting‏‎ (3 revisions)
  414. July 23, 2012 PID Upgrade‏‎ (3 revisions)
  415. Email from Richard Jones (06/14/2021)‏‎ (3 revisions)
  416. October 14, 2011 Design/Fab Meeting‏‎ (3 revisions)
  417. OWG Meeting 13-Jul-2016‏‎ (3 revisions)
  418. BCal Raw ADC Plots, June 18, 2007‏‎ (3 revisions)
  419. October 24, 2013 PID Upgrade‏‎ (3 revisions)
  420. June 8, 2022 Calorimeter‏‎ (3 revisions)
  421. TOF DAQ Tasks, January 22, 2015‏‎ (3 revisions)
  422. Run Coordinator report: Fall 2017‏‎ (3 revisions)
  423. Aug 30, 2011 Readout‏‎ (3 revisions)
  424. Jan 18, 2024 HallD AI/ML meeting‏‎ (3 revisions)
  425. BLTWG Meeting 10/23/2008‏‎ (3 revisions)
  426. OWG Meeting 24-Nov-2010‏‎ (3 revisions)
  427. Tagged Beam Group Meetings 2011‏‎ (3 revisions)
  428. GlueX TOF Meeting, November 6, 2019‏‎ (3 revisions)
  429. CDC Detector Studies‏‎ (3 revisions)
  430. OWG Meeting 30-Jul-2014‏‎ (3 revisions)
  431. November 19, 2010 Des/Fab Meeting‏‎ (3 revisions)
  432. 2012 Software Review Planning Meeting: Jan. 20, 2012‏‎ (3 revisions)
  433. April 2, 2021 DIRC‏‎ (3 revisions)
  434. ESNET Registration‏‎ (3 revisions)
  435. Minutes 8-8-2007‏‎ (3 revisions)
  436. May 13, 2022 Tech group SAD meeting‏‎ (3 revisions)
  437. GlueX TOF Meeting, January 16, 2019‏‎ (3 revisions)
  438. Reconstruction, Oct 20, 2009‏‎ (3 revisions)
  439. 2015-05-28‏‎ (3 revisions)
  440. HDGeant4 Meeting, March 23, 2021‏‎ (3 revisions)
  441. Π polarizability Software Meeting Apr 21, 2022‏‎ (3 revisions)
  442. OWG Meeting 15-Jun-2016‏‎ (3 revisions)
  443. Pi0 Polarizability Meeting Mar 26, 2021‏‎ (3 revisions)
  444. February 27, 2020 CPP Design Meeting‏‎ (3 revisions)
  445. BLTWG Meeting 12/04/2017‏‎ (3 revisions)
  446. December 9, 2016 PID Upgrade‏‎ (3 revisions)
  447. Flux and luminosity‏‎ (3 revisions)
  448. April 12, 2010 (11AM), Physics Working Group‏‎ (3 revisions)
  449. BLTWG Meeting 3/20/2008‏‎ (3 revisions)
  450. Π polarizability Meeting Dec 16, 2020‏‎ (3 revisions)
  451. Commissioning Run, Fall 2018‏‎ (3 revisions)
  452. Disk Space for Hall D at JLab‏‎ (3 revisions)
  453. November 22, 2013 Installation‏‎ (3 revisions)
  454. BCAL Reconstruction Meeting 2015-11-26‏‎ (3 revisions)
  455. Data Challenge 3‏‎ (3 revisions)
  456. Beam commissioning: Fall 2015‏‎ (3 revisions)
  457. Photon resolution‏‎ (3 revisions)
  458. JEF meeting, September 25, 2020‏‎ (3 revisions)
  459. January 11, 2010 Tracking CDC/FDC‏‎ (3 revisions)
  460. BCAL reconstruction test with pi0‏‎ (3 revisions)
  461. Minutes-6-5-2008‏‎ (3 revisions)
  462. Π polarizability Meeting July 17, 2018‏‎ (3 revisions)
  463. Nov 16, 2012 Design Meeting‏‎ (3 revisions)
  464. Pi0 Polarizability Meeting Oct 11, 2019‏‎ (3 revisions)
  465. Run Coordinator report: Fall 2021 w18‏‎ (3 revisions)
  466. GlueX Start Counter Meeting, January 24, 2019‏‎ (3 revisions)
  467. Sim-recon-1.2.0 Release Notes‏‎ (3 revisions)
  468. Π polarizability Meeting May 20, 2020‏‎ (3 revisions)
  469. GlueX Start Counter Meeting, June 2, 2016‏‎ (3 revisions)
  470. G3G4 comparison sim‏‎ (3 revisions)
  471. Making GitHub Topic Branches‏‎ (3 revisions)
  472. PS and ST‏‎ (3 revisions)
  473. Drawings Awaiting Release‏‎ (3 revisions)
  474. GlueX TOF Meeting, February 7, 2017‏‎ (3 revisions)
  475. 2016-01-15‏‎ (3 revisions)
  476. Π polarizability Meeting Jul 11, 2017‏‎ (3 revisions)
  477. 2016-11-09-SESAPS‏‎ (3 revisions)
  478. October 24, 2014 PID Upgrade‏‎ (3 revisions)
  479. JLab group chat on tracking progress, March 13, 2009‏‎ (3 revisions)
  480. Nov 2, 2022‏‎ (3 revisions)
  481. January 20, 2012 Fab Meeting‏‎ (3 revisions)
  482. August 31, 2020 DIRC‏‎ (3 revisions)
  483. CDC Electrical Hook Up Photos‏‎ (3 revisions)
  484. GlueX PID Meeting, October 10, 2019‏‎ (3 revisions)
  485. Meeting 2023 07 31‏‎ (3 revisions)
  486. Luminosity‏‎ (3 revisions)
  487. JEF meeting, March 17, 2017‏‎ (3 revisions)
  488. Solenoid Meeting 2014-02-04‏‎ (3 revisions)
  489. Mar 16, 2020 MEDCON5 Meeting‏‎ (3 revisions)
  490. GlueX Start Counter Meeting, November 29, 2018‏‎ (3 revisions)
  491. JEF meeting, November 15, 2019‏‎ (3 revisions)
  492. Minutes-5-29-2008‏‎ (3 revisions)
  493. 2015-06-04‏‎ (3 revisions)
  494. Oct 8, 2013 Calorimetry‏‎ (3 revisions)
  495. Photon Energy Deposit‏‎ (3 revisions)
  496. GlueX Software Meeting, November 10, 2020‏‎ (3 revisions)
  497. BLTWG Meeting 09/28/2009‏‎ (3 revisions)
  498. JEF meeting, April 2, 2021‏‎ (3 revisions)
  499. Minutes-6-25-2009‏‎ (3 revisions)
  500. 2016-04-13-APS‏‎ (3 revisions)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)