Pages with the most revisions
From GlueXWiki
Showing below up to 250 results in range #251 to #500.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
- Run Planning Meeting Notes, February 2 - February 9, 2023 (70 revisions)
- Test Setup for SiPMs (69 revisions)
- CRYTUR (69 revisions)
- Trigger Commissioning (69 revisions)
- Run Planning Meeting Notes, Jan 30-Feb 05, 2020 (69 revisions)
- Run Planning Meeting Notes, Sep 28-Oct 3, 2018 (69 revisions)
- Sim-Recon Tagged Releases (69 revisions)
- Private:UConn test setup (68 revisions)
- Run Planning Meeting Notes, June 8 - June 15, 2022 (68 revisions)
- Run Planning Meeting Notes, July 07 - July 14, 2022 (68 revisions)
- Getting started with GlueX Software (67 revisions)
- Tagger Microscope (67 revisions)
- RunPeriod-2017-01 Validation (67 revisions)
- FCAL Insert (67 revisions)
- GlueX-Collaboration-Feb-2023 (67 revisions)
- Run Planning Meeting Notes, October 21 - October 27, 2021 (67 revisions)
- Offline Monitoring Archived Data (67 revisions)
- 2017-01-recon v2-sims (66 revisions)
- Specification for 12 GeV electron beam and associated instrumentation (66 revisions)
- Light Guide Information (66 revisions)
- CDC q vs n (65 revisions)
- Trigger and Readout Electronics (65 revisions)
- Run Planning Meeting Notes, Feb 16-Feb 22, 2017 (65 revisions)
- DIRC (65 revisions)
- CDC 60 40 (65 revisions)
- FA125 chip occupancy (64 revisions)
- Time-of-Flight (64 revisions)
- GlueX phase 2, 2023-01 data set (64 revisions)
- Calibration Train (64 revisions)
- HOWTO install and run HDGeant4 (63 revisions)
- MEDCON6 Shutdown Plan (63 revisions)
- Specification for active photon collimator system (63 revisions)
- GlueX Software Setup (63 revisions)
- GlueX-Collaboration-May-2008 (63 revisions)
- Automatic Builds of GlueX Software (63 revisions)
- TS front panel connections (63 revisions)
- Analysis Launch Plugin Requirements (63 revisions)
- Run Planning Meeting Notes, November 30 - December 7, 2022 (63 revisions)
- DSelector (63 revisions)
- Calibration-Monitoring (62 revisions)
- DC and PID Review (62 revisions)
- Fall 2015 Commissioning Plan (62 revisions)
- Mattione BCAL Segmentation (62 revisions)
- Run Planning Meeting Notes, August 18 - August 23, 2022 (62 revisions)
- Mattione Study b1pi (62 revisions)
- Online builds 10-apr-2013 (61 revisions)
- Practice Talks (60 revisions)
- For the second coil (60 revisions)
- Run Planning Meeting Notes, Feb 9-Feb 15, 2017 (60 revisions)
- Run Planning Meeting Notes, January 19 - January 25, 2023 (60 revisions)
- Improved timing (60 revisions)
- Mattione Particle Classes (60 revisions)
- Run Planning Meeting Notes, August 13 -17, 2020 (60 revisions)
- GlueX-II and DIRC ERR (60 revisions)
- Run Planning Meeting Notes, October 6 - October 12, 2022 (59 revisions)
- PMT tiles missing after restarting data taking (59 revisions)
- Photon Beam Design Requirements (59 revisions)
- Run Planning Meeting Notes, September 1 - September 7, 2022 (58 revisions)
- CPP FCAL time/energy calibrations (58 revisions)
- Readiness Review: Testing of light sensors for Bcal (58 revisions)
- 12 GeV Trigger/Online Workshop (58 revisions)
- Hodoscope Fabrication Readiness Review (57 revisions)
- BCAL Beam Tests (57 revisions)
- RunPeriod-2021-08 Validation (57 revisions)
- Run Planning Meeting Notes, Apr 11 - Apr 17, 2019 (57 revisions)
- GlueX-Collaboration-Jan-2008 (56 revisions)
- Addressing ERR review recommendations (56 revisions)
- Collaboration Board (56 revisions)
- Run Planning Meeting Notes, August 3- August 10, 2022 (56 revisions)
- Detector Rates and Lifetime (56 revisions)
- Recoil proton reconstruction (55 revisions)
- Mattione Kaon PID Studies Y2175 (55 revisions)
- Mattione Update 07092012 (55 revisions)
- Publications (55 revisions)
- CPP Test 2020 - Schedule (55 revisions)
- Photon beam pipe (55 revisions)
- GlueX Tutorial 2019 (55 revisions)
- Run Coordination Meetings:Fall2022 (55 revisions)
- CDC straight straws (54 revisions)
- Short-Range Correlations and CT (54 revisions)
- FCAL (54 revisions)
- Run Planning Meeting Notes, September 16 - September 23, 2021 (53 revisions)
- SRC/CT Data Reconstruction (53 revisions)
- HOWTO documentation (53 revisions)
- OWG Meeting 13-Apr-2011 (53 revisions)
- Hall Network Specifications (53 revisions)
- Tagger Magnetic Field Mapping (53 revisions)
- CDC algo tuning (52 revisions)
- Online Action Items (52 revisions)
- Motion Control Applications (52 revisions)
- Experiment Readiness Review 2017 (52 revisions)
- Barrel Calorimeter (52 revisions)
- Pi0 polarizability Meetings (52 revisions)
- Run Planning Meeting Notes, Mar 2 - Mar 8, 2017 (52 revisions)
- Run Planning Meeting Notes, Apr 26-May 2, 2018 (52 revisions)
- HOWTO get your jobs to run on the Grid (51 revisions)
- Run Planning Meeting Notes, Feb 1-Feb 7, 2018 (51 revisions)
- FCAL Fabrication Readiness Review (51 revisions)
- GlueX Project Overviews (51 revisions)
- CDC Construction Details (51 revisions)
- RunPeriod-2018-08 Validation (51 revisions)
- Fall 2019 DIRC Commissioning (51 revisions)
- FADC FPGA Programming Meetings (51 revisions)
- Mapping PS results (51 revisions)
- Final Design (51 revisions)
- Run Planning Meeting Notes, May 2-May 6, 2018 (51 revisions)
- Mini-BCAL Update June 19, 2012 (51 revisions)
- Charged Pion Polarizability Experiment in Hall-D (50 revisions)
- GlueX Data Classes (50 revisions)
- Run Planning Meeting Notes, December 16 - December 22, 2021 (50 revisions)
- Conference Proceedings (50 revisions)
- Run Planning Meeting Notes, Nov 8-Nov 14, 2018 (50 revisions)
- BCAL reconstruction 11/28/11 (50 revisions)
- Run Coordination Meetings: Fall 2015 Run (50 revisions)
- Run Coordination Meetings:Fall2021 (50 revisions)
- Mattione Update 04302014 (50 revisions)
- Analysis Shift Meeting Agenda, November 21 - November 27, 2021 (50 revisions)
- CDC gain calibrations (50 revisions)
- March 1, 2017, Production & Analysis Working Group (50 revisions)
- Data Monitoring Database (49 revisions)
- Run Planning Meeting Notes, Jan 23-Jan 29, 2020 (49 revisions)
- CDC bad channels (49 revisions)
- BLTWG Meeting 12/6/2007 (49 revisions)
- Run Planning Meeting Notes, Mar 28 - Apr 3, 2019 (49 revisions)
- SRC/CT Calibrations (49 revisions)
- Baby BCAL at JLab (48 revisions)
- Mini BCAL for EIC (48 revisions)
- Raid-to-Silo Transfer Strategy (48 revisions)
- Mark's Sandbox (48 revisions)
- Locking in JANA (48 revisions)
- Run Planning Meeting Notes, April 19-April 25, 2016 (48 revisions)
- Run Coordination Meetings:Winter2024 (48 revisions)
- Active Collimator (48 revisions)
- Mattione sim-recon Code Documentation (48 revisions)
- SCONS for online (48 revisions)
- Run Planning Meeting Notes, November 4 - November 10, 2021 (47 revisions)
- Trigger Commissioning Meetings (47 revisions)
- Comparison of radiation damage between FLUKA and Geant (47 revisions)
- Configuration Management (47 revisions)
- Run Planning Meeting Notes, August 6 - 12, 2020 (47 revisions)
- Beam Simulations (47 revisions)
- September 19, 2014 Data Monitoring (47 revisions)
- GlueX Physics Review Papers (46 revisions)
- Planning for 2015 DIRC Review (46 revisions)
- Tagger Engineering Design (46 revisions)
- Analysis FAQ (46 revisions)
- CHESS X-ray measurements 11/2006 (46 revisions)
- CDC Fabrication Readiness Review (46 revisions)
- Mattione Update 09172012 (46 revisions)
- Run Planning Meeting Notes, Feb 27-Mar 05, 2020 (45 revisions)
- CPP DAQ/Monitoring Test Spring 2022 (45 revisions)
- HOWTO use AmpTools on the JLab farm GPUs (45 revisions)
- Photon Reconstruction in b1pi events 02/10/2012 (45 revisions)
- May 7, 2009 Readout (45 revisions)
- GlueX Physics Exotc Quantum Number Mesons (45 revisions)
- Meeting with SICCAS (45 revisions)
- Run Planning Meeting Notes, Mar 21 - Mar 27, 2019 (45 revisions)
- List of FCAL Beamtest Component IDs (45 revisions)
- Spring 2016 Recon Checklist (45 revisions)
- Possible Meeting Topics (45 revisions)
- Results with the active collimator in the Hall B photon beam (45 revisions)
- JEF meeting, April 8, 2022 (45 revisions)
- 2013 Software Review (44 revisions)
- Run Planning Meeting Notes, Mar 9 - Mar 15, 2017 (44 revisions)
- CPP Design Meetings (44 revisions)
- Solenoid Controls Redesign (44 revisions)
- Resolutions (44 revisions)
- KPP November 30, 2014 (44 revisions)
- DIRC Software Overview (44 revisions)
- Run Planning Meeting Notes, March 15 - March 22, 2023 (44 revisions)
- FA125 Data Format July 7, 2015 (44 revisions)
- Run Coordination Meetings:Summer Fall2022 (44 revisions)
- Slow controls (44 revisions)
- GlueX PAC 2010 (44 revisions)
- Run Planning Meeting Notes, September 10 - 16, 2020 (44 revisions)
- Simulations (44 revisions)
- Email Lists (43 revisions)
- CDC prototype drift times (43 revisions)
- CDC transfer func attempt (43 revisions)
- Run Planning Meeting Notes, Feb 28 - Mar 6, 2019 (43 revisions)
- Bill's to do list (43 revisions)
- Microscope Fabrication Readiness Review (43 revisions)
- FCAL Installation (43 revisions)
- Basic formalism for X-ray monochromator resolution (43 revisions)
- Run Planning Meeting Notes, October 26 - November 2, 2022 (43 revisions)
- Mattione Kaon PID Studies h2Prime(2600) (42 revisions)
- BLTWG Meeting 11/25/2013 (42 revisions)
- Run Planning Meeting Notes, October 14 - October 20, 2021 (42 revisions)
- Optical link connections (42 revisions)
- CDC events (42 revisions)
- Commissioning Calibration Data (42 revisions)
- FCAL energy calibration (42 revisions)
- Photon Beam Polarimetry (42 revisions)
- Run Planning Meeting Notes, Dec 5-Dec 11, 2018 (42 revisions)
- Hall D Package Manager (42 revisions)
- Event Analyzer (42 revisions)
- Offline Monitoring Incoming Data (41 revisions)
- BCAL hadronic efficiencies (41 revisions)
- CDC travel plans (41 revisions)
- FA125 Data Format June 23, 2015 (41 revisions)
- Run Planning Meeting Notes, Feb 15-Feb 21, 2018 (41 revisions)
- Mattione Update 08212013 (41 revisions)
- CPP and NPP Experiment Configuration (41 revisions)
- CDC prototype more on timing 3 (41 revisions)
- ADC data (41 revisions)
- First look at TOF calibration (40 revisions)
- Run Planning Meeting Notes, Nov 14-Nov 21, 2018 (40 revisions)
- How to Setup Visual Studio Code for the ifarm (40 revisions)
- 2023 Data Production (40 revisions)
- Run Coordination Meetings:Fall2018 Run (40 revisions)
- FDC Fabrication Readiness Review (40 revisions)
- Neutral Particle PID May 2007 (40 revisions)
- Action Items (40 revisions)
- Monitoring System Requirements (40 revisions)
- Run Planning Meeting Notes, Apr 4 - Apr 10, 2019 (39 revisions)
- Mattione Kaon PID Studies (39 revisions)
- PrimEx-eta Short Term Run Plan (39 revisions)
- OWG Meeting 3-Aug-2011 (39 revisions)
- CDC 06 02 2008 (39 revisions)
- Apr 15, 2010 Calorimetry (39 revisions)
- CDC time spikes (39 revisions)
- Photon flux for GlueX empty target runs (39 revisions)
- Monte Carlo simulation of the CHESS C1 beamline (39 revisions)
- Crystals (39 revisions)
- JEF meeting, October 13, 2023 (39 revisions)
- FCAL2 Crates (38 revisions)
- HOWTO use the GlueX Singularity Container (38 revisions)
- SRC/CT Detector Calibration (38 revisions)
- ASIC meeting June 14, 2010 (38 revisions)
- Polycom Equipment (38 revisions)
- Calorimeter Review (38 revisions)
- FDC (38 revisions)
- Mattione Kaon PID Studies eta1Prime(2300) (38 revisions)
- Aug 20, 2009 Calorimetry (38 revisions)
- C++11 in Hall D Online (38 revisions)
- CDC tilted detectors (38 revisions)
- GlueX-2023-01 data reconstruction (38 revisions)
- PrimEx-eta phase3 FCAL time/energy calibrations (38 revisions)
- Design of an asymmetric monochromator (37 revisions)
- GlueX Offline Meeting, March 23, 2010 (37 revisions)
- Alarm System for EPICS (37 revisions)
- DAQ test computer (37 revisions)
- Online Data Challenge 2013 List of Issues (37 revisions)
- Detector Alignment (37 revisions)
- Private:SiPM timing measurements (37 revisions)
- Run Planning Meeting Notes, November 18 - November 24, 2021 (37 revisions)
- Analysis Shift Meeting Agenda, November 14 - November 20, 2021 (37 revisions)
- Barrel Calorimeter Shift (37 revisions)
- Minutes-9-27-2012 (37 revisions)
- Silicon Photomultiplier Performance (36 revisions)