Pages with the most revisions

From GlueXWiki
Jump to: navigation, search

Showing below up to 250 results in range #251 to #500.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. Run Planning Meeting Notes, February 2 - February 9, 2023‏‎ (70 revisions)
  2. Test Setup for SiPMs‏‎ (69 revisions)
  3. CRYTUR‏‎ (69 revisions)
  4. Trigger Commissioning‏‎ (69 revisions)
  5. Run Planning Meeting Notes, Jan 30-Feb 05, 2020‏‎ (69 revisions)
  6. Run Planning Meeting Notes, Sep 28-Oct 3, 2018‏‎ (69 revisions)
  7. Sim-Recon Tagged Releases‏‎ (69 revisions)
  8. Private:UConn test setup‏‎ (68 revisions)
  9. Run Planning Meeting Notes, June 8 - June 15, 2022‏‎ (68 revisions)
  10. Run Planning Meeting Notes, July 07 - July 14, 2022‏‎ (68 revisions)
  11. Getting started with GlueX Software‏‎ (67 revisions)
  12. Tagger Microscope‏‎ (67 revisions)
  13. RunPeriod-2017-01 Validation‏‎ (67 revisions)
  14. FCAL Insert‏‎ (67 revisions)
  15. GlueX-Collaboration-Feb-2023‏‎ (67 revisions)
  16. Run Planning Meeting Notes, October 21 - October 27, 2021‏‎ (67 revisions)
  17. Offline Monitoring Archived Data‏‎ (67 revisions)
  18. 2017-01-recon v2-sims‏‎ (66 revisions)
  19. Specification for 12 GeV electron beam and associated instrumentation‏‎ (66 revisions)
  20. Light Guide Information‏‎ (66 revisions)
  21. CDC q vs n‏‎ (65 revisions)
  22. Trigger and Readout Electronics‏‎ (65 revisions)
  23. Run Planning Meeting Notes, Feb 16-Feb 22, 2017‏‎ (65 revisions)
  24. DIRC‏‎ (65 revisions)
  25. CDC 60 40‏‎ (65 revisions)
  26. FA125 chip occupancy‏‎ (64 revisions)
  27. Time-of-Flight‏‎ (64 revisions)
  28. GlueX phase 2, 2023-01 data set‏‎ (64 revisions)
  29. Calibration Train‏‎ (64 revisions)
  30. HOWTO install and run HDGeant4‏‎ (63 revisions)
  31. MEDCON6 Shutdown Plan‏‎ (63 revisions)
  32. Specification for active photon collimator system‏‎ (63 revisions)
  33. GlueX Software Setup‏‎ (63 revisions)
  34. GlueX-Collaboration-May-2008‏‎ (63 revisions)
  35. Automatic Builds of GlueX Software‏‎ (63 revisions)
  36. TS front panel connections‏‎ (63 revisions)
  37. Analysis Launch Plugin Requirements‏‎ (63 revisions)
  38. Run Planning Meeting Notes, November 30 - December 7, 2022‏‎ (63 revisions)
  39. DSelector‏‎ (63 revisions)
  40. Calibration-Monitoring‏‎ (62 revisions)
  41. DC and PID Review‏‎ (62 revisions)
  42. Fall 2015 Commissioning Plan‏‎ (62 revisions)
  43. Mattione BCAL Segmentation‏‎ (62 revisions)
  44. Run Planning Meeting Notes, August 18 - August 23, 2022‏‎ (62 revisions)
  45. Mattione Study b1pi‏‎ (62 revisions)
  46. Online builds 10-apr-2013‏‎ (61 revisions)
  47. Practice Talks‏‎ (60 revisions)
  48. For the second coil‏‎ (60 revisions)
  49. Run Planning Meeting Notes, Feb 9-Feb 15, 2017‏‎ (60 revisions)
  50. Run Planning Meeting Notes, January 19 - January 25, 2023‏‎ (60 revisions)
  51. Improved timing‏‎ (60 revisions)
  52. Mattione Particle Classes‏‎ (60 revisions)
  53. Run Planning Meeting Notes, August 13 -17, 2020‏‎ (60 revisions)
  54. GlueX-II and DIRC ERR‏‎ (60 revisions)
  55. Run Planning Meeting Notes, October 6 - October 12, 2022‏‎ (59 revisions)
  56. PMT tiles missing after restarting data taking‏‎ (59 revisions)
  57. Photon Beam Design Requirements‏‎ (59 revisions)
  58. Run Planning Meeting Notes, September 1 - September 7, 2022‏‎ (58 revisions)
  59. CPP FCAL time/energy calibrations‏‎ (58 revisions)
  60. Readiness Review: Testing of light sensors for Bcal‏‎ (58 revisions)
  61. 12 GeV Trigger/Online Workshop‏‎ (58 revisions)
  62. Hodoscope Fabrication Readiness Review‏‎ (57 revisions)
  63. BCAL Beam Tests‏‎ (57 revisions)
  64. RunPeriod-2021-08 Validation‏‎ (57 revisions)
  65. Run Planning Meeting Notes, Apr 11 - Apr 17, 2019‏‎ (57 revisions)
  66. GlueX-Collaboration-Jan-2008‏‎ (56 revisions)
  67. Addressing ERR review recommendations‏‎ (56 revisions)
  68. Collaboration Board‏‎ (56 revisions)
  69. Run Planning Meeting Notes, August 3- August 10, 2022‏‎ (56 revisions)
  70. Detector Rates and Lifetime‏‎ (56 revisions)
  71. Recoil proton reconstruction‏‎ (55 revisions)
  72. Mattione Kaon PID Studies Y2175‏‎ (55 revisions)
  73. Mattione Update 07092012‏‎ (55 revisions)
  74. Publications‏‎ (55 revisions)
  75. CPP Test 2020 - Schedule‏‎ (55 revisions)
  76. Photon beam pipe‏‎ (55 revisions)
  77. GlueX Tutorial 2019‏‎ (55 revisions)
  78. Run Coordination Meetings:Fall2022‏‎ (55 revisions)
  79. CDC straight straws‏‎ (54 revisions)
  80. Short-Range Correlations and CT‏‎ (54 revisions)
  81. FCAL‏‎ (54 revisions)
  82. Run Planning Meeting Notes, September 16 - September 23, 2021‏‎ (53 revisions)
  83. SRC/CT Data Reconstruction‏‎ (53 revisions)
  84. HOWTO documentation‏‎ (53 revisions)
  85. OWG Meeting 13-Apr-2011‏‎ (53 revisions)
  86. Hall Network Specifications‏‎ (53 revisions)
  87. Tagger Magnetic Field Mapping‏‎ (53 revisions)
  88. CDC algo tuning‏‎ (52 revisions)
  89. Online Action Items‏‎ (52 revisions)
  90. Motion Control Applications‏‎ (52 revisions)
  91. Experiment Readiness Review 2017‏‎ (52 revisions)
  92. Barrel Calorimeter‏‎ (52 revisions)
  93. Pi0 polarizability Meetings‏‎ (52 revisions)
  94. Run Planning Meeting Notes, Mar 2 - Mar 8, 2017‏‎ (52 revisions)
  95. Run Planning Meeting Notes, Apr 26-May 2, 2018‏‎ (52 revisions)
  96. HOWTO get your jobs to run on the Grid‏‎ (51 revisions)
  97. Run Planning Meeting Notes, Feb 1-Feb 7, 2018‏‎ (51 revisions)
  98. FCAL Fabrication Readiness Review‏‎ (51 revisions)
  99. GlueX Project Overviews‏‎ (51 revisions)
  100. CDC Construction Details‏‎ (51 revisions)
  101. RunPeriod-2018-08 Validation‏‎ (51 revisions)
  102. Fall 2019 DIRC Commissioning‏‎ (51 revisions)
  103. FADC FPGA Programming Meetings‏‎ (51 revisions)
  104. Mapping PS results‏‎ (51 revisions)
  105. Final Design‏‎ (51 revisions)
  106. Run Planning Meeting Notes, May 2-May 6, 2018‏‎ (51 revisions)
  107. Mini-BCAL Update June 19, 2012‏‎ (51 revisions)
  108. Charged Pion Polarizability Experiment in Hall-D‏‎ (50 revisions)
  109. GlueX Data Classes‏‎ (50 revisions)
  110. Run Planning Meeting Notes, December 16 - December 22, 2021‏‎ (50 revisions)
  111. Conference Proceedings‏‎ (50 revisions)
  112. Run Planning Meeting Notes, Nov 8-Nov 14, 2018‏‎ (50 revisions)
  113. BCAL reconstruction 11/28/11‏‎ (50 revisions)
  114. Run Coordination Meetings: Fall 2015 Run‏‎ (50 revisions)
  115. Run Coordination Meetings:Fall2021‏‎ (50 revisions)
  116. Mattione Update 04302014‏‎ (50 revisions)
  117. Analysis Shift Meeting Agenda, November 21 - November 27, 2021‏‎ (50 revisions)
  118. CDC gain calibrations‏‎ (50 revisions)
  119. March 1, 2017, Production & Analysis Working Group‏‎ (50 revisions)
  120. Data Monitoring Database‏‎ (49 revisions)
  121. Run Planning Meeting Notes, Jan 23-Jan 29, 2020‏‎ (49 revisions)
  122. CDC bad channels‏‎ (49 revisions)
  123. BLTWG Meeting 12/6/2007‏‎ (49 revisions)
  124. Run Planning Meeting Notes, Mar 28 - Apr 3, 2019‏‎ (49 revisions)
  125. SRC/CT Calibrations‏‎ (49 revisions)
  126. Baby BCAL at JLab‏‎ (48 revisions)
  127. Mini BCAL for EIC‏‎ (48 revisions)
  128. Raid-to-Silo Transfer Strategy‏‎ (48 revisions)
  129. Mark's Sandbox‏‎ (48 revisions)
  130. Locking in JANA‏‎ (48 revisions)
  131. Run Planning Meeting Notes, April 19-April 25, 2016‏‎ (48 revisions)
  132. Run Coordination Meetings:Winter2024‏‎ (48 revisions)
  133. Active Collimator‏‎ (48 revisions)
  134. Mattione sim-recon Code Documentation‏‎ (48 revisions)
  135. SCONS for online‏‎ (48 revisions)
  136. Run Planning Meeting Notes, November 4 - November 10, 2021‏‎ (47 revisions)
  137. Trigger Commissioning Meetings‏‎ (47 revisions)
  138. Comparison of radiation damage between FLUKA and Geant‏‎ (47 revisions)
  139. Configuration Management‏‎ (47 revisions)
  140. Run Planning Meeting Notes, August 6 - 12, 2020‏‎ (47 revisions)
  141. Beam Simulations‏‎ (47 revisions)
  142. September 19, 2014 Data Monitoring‏‎ (47 revisions)
  143. GlueX Physics Review Papers‏‎ (46 revisions)
  144. Planning for 2015 DIRC Review‏‎ (46 revisions)
  145. Tagger Engineering Design‏‎ (46 revisions)
  146. Analysis FAQ‏‎ (46 revisions)
  147. CHESS X-ray measurements 11/2006‏‎ (46 revisions)
  148. CDC Fabrication Readiness Review‏‎ (46 revisions)
  149. Mattione Update 09172012‏‎ (46 revisions)
  150. Run Planning Meeting Notes, Feb 27-Mar 05, 2020‏‎ (45 revisions)
  151. CPP DAQ/Monitoring Test Spring 2022‏‎ (45 revisions)
  152. HOWTO use AmpTools on the JLab farm GPUs‏‎ (45 revisions)
  153. Photon Reconstruction in b1pi events 02/10/2012‏‎ (45 revisions)
  154. May 7, 2009 Readout‏‎ (45 revisions)
  155. GlueX Physics Exotc Quantum Number Mesons‏‎ (45 revisions)
  156. Meeting with SICCAS‏‎ (45 revisions)
  157. Run Planning Meeting Notes, Mar 21 - Mar 27, 2019‏‎ (45 revisions)
  158. List of FCAL Beamtest Component IDs‏‎ (45 revisions)
  159. Spring 2016 Recon Checklist‏‎ (45 revisions)
  160. Possible Meeting Topics‏‎ (45 revisions)
  161. Results with the active collimator in the Hall B photon beam‏‎ (45 revisions)
  162. JEF meeting, April 8, 2022‏‎ (45 revisions)
  163. 2013 Software Review‏‎ (44 revisions)
  164. Run Planning Meeting Notes, Mar 9 - Mar 15, 2017‏‎ (44 revisions)
  165. CPP Design Meetings‏‎ (44 revisions)
  166. Solenoid Controls Redesign‏‎ (44 revisions)
  167. Resolutions‏‎ (44 revisions)
  168. KPP November 30, 2014‏‎ (44 revisions)
  169. DIRC Software Overview‏‎ (44 revisions)
  170. Run Planning Meeting Notes, March 15 - March 22, 2023‏‎ (44 revisions)
  171. FA125 Data Format July 7, 2015‏‎ (44 revisions)
  172. Run Coordination Meetings:Summer Fall2022‏‎ (44 revisions)
  173. Slow controls‏‎ (44 revisions)
  174. GlueX PAC 2010‏‎ (44 revisions)
  175. Run Planning Meeting Notes, September 10 - 16, 2020‏‎ (44 revisions)
  176. Simulations‏‎ (44 revisions)
  177. Email Lists‏‎ (43 revisions)
  178. CDC prototype drift times‏‎ (43 revisions)
  179. CDC transfer func attempt‏‎ (43 revisions)
  180. Run Planning Meeting Notes, Feb 28 - Mar 6, 2019‏‎ (43 revisions)
  181. Bill's to do list‏‎ (43 revisions)
  182. Microscope Fabrication Readiness Review‏‎ (43 revisions)
  183. FCAL Installation‏‎ (43 revisions)
  184. Basic formalism for X-ray monochromator resolution‏‎ (43 revisions)
  185. Run Planning Meeting Notes, October 26 - November 2, 2022‏‎ (43 revisions)
  186. Mattione Kaon PID Studies h2Prime(2600)‏‎ (42 revisions)
  187. BLTWG Meeting 11/25/2013‏‎ (42 revisions)
  188. Run Planning Meeting Notes, October 14 - October 20, 2021‏‎ (42 revisions)
  189. Optical link connections‏‎ (42 revisions)
  190. CDC events‏‎ (42 revisions)
  191. Commissioning Calibration Data‏‎ (42 revisions)
  192. FCAL energy calibration‏‎ (42 revisions)
  193. Photon Beam Polarimetry‏‎ (42 revisions)
  194. Run Planning Meeting Notes, Dec 5-Dec 11, 2018‏‎ (42 revisions)
  195. Hall D Package Manager‏‎ (42 revisions)
  196. Event Analyzer‏‎ (42 revisions)
  197. Offline Monitoring Incoming Data‏‎ (41 revisions)
  198. BCAL hadronic efficiencies‏‎ (41 revisions)
  199. CDC travel plans‏‎ (41 revisions)
  200. FA125 Data Format June 23, 2015‏‎ (41 revisions)
  201. Run Planning Meeting Notes, Feb 15-Feb 21, 2018‏‎ (41 revisions)
  202. Mattione Update 08212013‏‎ (41 revisions)
  203. CPP and NPP Experiment Configuration‏‎ (41 revisions)
  204. CDC prototype more on timing 3‏‎ (41 revisions)
  205. ADC data‏‎ (41 revisions)
  206. First look at TOF calibration‏‎ (40 revisions)
  207. Run Planning Meeting Notes, Nov 14-Nov 21, 2018‏‎ (40 revisions)
  208. How to Setup Visual Studio Code for the ifarm‏‎ (40 revisions)
  209. 2023 Data Production‏‎ (40 revisions)
  210. Run Coordination Meetings:Fall2018 Run‏‎ (40 revisions)
  211. FDC Fabrication Readiness Review‏‎ (40 revisions)
  212. Neutral Particle PID May 2007‏‎ (40 revisions)
  213. Action Items‏‎ (40 revisions)
  214. Monitoring System Requirements‏‎ (40 revisions)
  215. Run Planning Meeting Notes, Apr 4 - Apr 10, 2019‏‎ (39 revisions)
  216. Mattione Kaon PID Studies‏‎ (39 revisions)
  217. PrimEx-eta Short Term Run Plan‏‎ (39 revisions)
  218. OWG Meeting 3-Aug-2011‏‎ (39 revisions)
  219. CDC 06 02 2008‏‎ (39 revisions)
  220. Apr 15, 2010 Calorimetry‏‎ (39 revisions)
  221. CDC time spikes‏‎ (39 revisions)
  222. Photon flux for GlueX empty target runs‏‎ (39 revisions)
  223. Monte Carlo simulation of the CHESS C1 beamline‏‎ (39 revisions)
  224. Crystals‏‎ (39 revisions)
  225. JEF meeting, October 13, 2023‏‎ (39 revisions)
  226. FCAL2 Crates‏‎ (38 revisions)
  227. HOWTO use the GlueX Singularity Container‏‎ (38 revisions)
  228. SRC/CT Detector Calibration‏‎ (38 revisions)
  229. ASIC meeting June 14, 2010‏‎ (38 revisions)
  230. Polycom Equipment‏‎ (38 revisions)
  231. Calorimeter Review‏‎ (38 revisions)
  232. FDC‏‎ (38 revisions)
  233. Mattione Kaon PID Studies eta1Prime(2300)‏‎ (38 revisions)
  234. Aug 20, 2009 Calorimetry‏‎ (38 revisions)
  235. C++11 in Hall D Online‏‎ (38 revisions)
  236. CDC tilted detectors‏‎ (38 revisions)
  237. GlueX-2023-01 data reconstruction‏‎ (38 revisions)
  238. PrimEx-eta phase3 FCAL time/energy calibrations‏‎ (38 revisions)
  239. Design of an asymmetric monochromator‏‎ (37 revisions)
  240. GlueX Offline Meeting, March 23, 2010‏‎ (37 revisions)
  241. Alarm System for EPICS‏‎ (37 revisions)
  242. DAQ test computer‏‎ (37 revisions)
  243. Online Data Challenge 2013 List of Issues‏‎ (37 revisions)
  244. Detector Alignment‏‎ (37 revisions)
  245. Private:SiPM timing measurements‏‎ (37 revisions)
  246. Run Planning Meeting Notes, November 18 - November 24, 2021‏‎ (37 revisions)
  247. Analysis Shift Meeting Agenda, November 14 - November 20, 2021‏‎ (37 revisions)
  248. Barrel Calorimeter Shift‏‎ (37 revisions)
  249. Minutes-9-27-2012‏‎ (37 revisions)
  250. Silicon Photomultiplier Performance‏‎ (36 revisions)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)