Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #751 to #1,250.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. Controls Meeting 30-Nov-2023
  2. Controls Meeting 31-Aug-2017
  3. Controls Meeting 31-Oct-2019
  4. Controls Meeting 4-Apr-2019
  5. Controls Meeting 4-Aug-2016
  6. Controls Meeting 4-Feb-2016
  7. Controls Meeting 4-Sep-2014
  8. Controls Meeting 5-Feb-2015
  9. Controls Meeting 5-Jan-2017
  10. Controls Meeting 7-Aug-2014
  11. Controls Meeting 7-Feb-2019
  12. Controls Meeting 7-Jan-2016
  13. Controls Meeting 8-Aug-2019
  14. Controls Meeting 8-Jan-2015
  15. Controls Meeting 8-Jun-2017
  16. Controls Meeting 9-Jul-2020
  17. Controls Meeting 9-Jun-2016
  18. Controls Meeting 9-Nov-2017
  19. Controls To Do List
  20. Converting sim-recon tags and branches to the split repositories
  21. Cosmic Particle Oscilloscope Coincidence Test
  22. Cosmic Particle Oscilloscope Readings
  23. Cosmic Particle Oscilloscope Readings (Lower Threshold)
  24. Cosmic ray test stand setup
  25. Counter Repair, Summer 2019
  26. Counting House
  27. Counting House DAQ
  28. Crate and channel assignment
  29. Crate data rates
  30. Cross check yields
  31. Crystal QA Check using Pair Spectrometer
  32. Curtis on DC-1
  33. Cut open straws
  34. DAC Calibration
  35. DANA objects
  36. DAQTree plugin
  37. DAQ Controller diskless setup
  38. DAQ Outline for May 2008
  39. DAQ Tasks for Spring 2015 Commissioning Run
  40. DAQ settings
  41. DAQ test computer
  42. DE/dx 250 MeV pions/kaons
  43. DE/dx 350 MeV pions/koans/protons
  44. DE/dx 350 MeV pions/protons
  45. DEPRECATED Offline Monitoring Archived Data
  46. DIRC CCDB Tables
  47. DIRC LV Power Cycling Schedule
  48. DIRC Planning for FY16
  49. DIRC Readout
  50. DIRC Software Tasks
  51. DIRC Spare Parts and Storage location
  52. DNP-2014 abstract submitted by Richard Jones
  53. DNP 2020 Planning
  54. DOE Medium Energy 2010
  55. DSelector SWIF Jobs
  56. Daq test stand-22-aug-2008
  57. Data Challenge 1
  58. Data Challenge 2 Event Tally Board
  59. Data Challenge 3
  60. Data Monitoring Database
  61. Data Plan Meeting, February 13, 2014
  62. Data Skimming
  63. Dec. 13, 2007 Tracking CDC/FDC
  64. Dec 1, 2011 SiPM Electrical and Cooling
  65. Dec 10, 2009 Calorimetry
  66. Dec 10, 2010 SiPM Electrical and Cooling
  67. Dec 11,2012 Readout
  68. Dec 11, 2013 Design Meeting
  69. Dec 13, 2013 Design Meeting
  70. Dec 14, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  71. Dec 16
  72. Dec 16, 2010 Readout
  73. Dec 2, 2010 Readout
  74. Dec 20, 2010 Replacement Solenoid
  75. Dec 2019 Simulation branches
  76. Dec 5, 2011 SiPM Electrical and Cooling
  77. Dec 5, 2023 HallD AI/ML meeting
  78. Dec 6, 2019 Engineering Group Meeting
  79. Dec 7, 2021 PrimEx-Eta (informal) Calibration & Analysis Meeting
  80. Dec 9, 2022
  81. December10, 2013
  82. December 02, 2011 Design Meeting
  83. December 02, 2021 CPP Design Meeting
  84. December 02, 2022 Tech group meeting
  85. December 09, 2021 KLONG Design Meeting
  86. December 1, 2008 Trackine CDC/FDC
  87. December 1, 2022
  88. December 10, 2010 Des/Fab Meeting
  89. December 10, 2019 FCAL Insert Design Meeting
  90. December 12, 2016
  91. December 14, 2009 Tracking CDC/FDC
  92. December 14, 2023
  93. December 15, 2008 Tracking CDC/FDC
  94. December 15, 2022
  95. December 16, 2013, Physics Working Group
  96. December 16, 2022 Tech group meeting
  97. December 17, 2012 (11:30AM), Physics Working Group
  98. December 17, 2013 Tracking FADC
  99. December 17, 2020 CPP Design Meeting
  100. December 18, 2009 CDC Meeting
  101. December 18, 2013 Calibration
  102. December 19, 2011 (11:30AM), Physics Working Group
  103. December 19, 2012 tracking CDC/FDC
  104. December 2, 2013, Physics Working Group
  105. December 2, 2014
  106. December 2, 2020
  107. December 21, 2011 Tracking CDC/FDC
  108. December 22,2010 Tracking CDC/FDC
  109. December 22, 2022
  110. December 29, 2022
  111. December 3, 2010 Des/Fab Meeting
  112. December 3, 2012 (11:30AM), Physics Working Group
  113. December 3, 2020 CPP Design Meeting
  114. December 4, 2006 Software
  115. December 4, 2013 Calibration
  116. December 6, 2010 (11AM), Physics Working Group
  117. December 7, 2011 Tracking CDC/FDC
  118. December 7, 2012
  119. December 7. 2023
  120. December 8, 2022
  121. December 9, 2011 Fab Meeting
  122. Ded
  123. Defining role of Physics Coordinator
  124. Deprecated: Computer Farms
  125. Deprecated: JANA/DANA
  126. Deprecated: Kinematic Fitter
  127. Deprecated: Offline Projects
  128. Deprecated: RSS Feeds
  129. Depth-Sensitive Diamond Topography
  130. Design of an asymmetric monochromator
  131. Detailed L3 Beam Test Plan Spring 2017
  132. Detailed sub-periods
  133. Detector Alignment
  134. Detector Rates and Lifetime
  135. Detector naming scheme
  136. Device for finding/verifying the beam plane location
  137. Diagnosing segmentation faults in reconstruction software
  138. Dimensions
  139. Dinner 18:00
  140. Dinner 18:00 ( Das Waldcafe)
  141. Dinner 18:30
  142. Discussion about the X-ray beam divergence
  143. Discussion of e+/e- tertiary beams in Hall D
  144. Discussion with Serguei Gevorkyan / Mon Apr 13
  145. Disk Space for Hall D at JLab
  146. Display Management Framework Options
  147. Divider test
  148. Dose Calculation
  149. Double Regge Exchange Meeting
  150. Draft By-law on Shift-taking
  151. Draft Start Counter Commissioning Plan
  152. Drawings Awaiting Release
  153. Drift Chamber Gas System
  154. Drift time comparison (gas check)
  155. Dump solenoid plc archive data
  156. E+e- Pair Production off target
  157. ECAL Controllers and VTPs
  158. ECAL IP addresses and names
  159. EM background rate studies
  160. EPICS archiving with MYA
  161. ESH&Q
  162. ESNET Registration
  163. EVO and H.323 Client
  164. EVO general
  165. Earth Magnetic Field
  166. Electron trajectories
  167. Electronic chain simulation
  168. Electronics: CFD delay and treshold
  169. Electronics Action Items
  170. Electronics Outline for May 2008
  171. Electronics Testing Readiness Review Checklist
  172. Electronics Workshops/Pre-Meetings
  173. Elton Smith - The 12 GeV JLab Upgrade Project
  174. Email from Richard Jones (06/14/2021)
  175. Email from Vanderhaeghen
  176. Email sent by David on April 13, 2012
  177. Emittance measurements
  178. Energy/Amplitude as a function of drift time
  179. Energy Resolution Plot
  180. Energy threshold for various assumed PDE and DR combinations
  181. Errors from hd dump
  182. EventStore File Formats
  183. EventStore Run Metadata
  184. EventStore Table Definitions
  185. Event Analyzer
  186. Event generators
  187. Event pics
  188. Example CCDB session
  189. Example of Monitoring Histogram Email
  190. Excursions in Hall D beam positions
  191. Exotic Review
  192. ExpDocs Introduction
  193. Expected Statistics for GlueX
  194. Experiment Readiness Review
  195. Experiment Readiness Review 2016
  196. Experiment Readiness Review 2017
  197. Experiment Readiness Review 2020
  198. Experimental Hall-D
  199. Experimental Sensitivity to Solenoidal Field
  200. Explanation of ROOT tree leaves
  201. F125ADC Tests with FDC
  202. F425962
  203. FA125 Meeting May 13, 2016
  204. FA125 chip occupancy
  205. FA125 firmware check
  206. FA125 firmware check 2.00D+
  207. FADC250 Firmware Versions
  208. FADC 250
  209. FADC Emulation Meeting, August 26, 2015
  210. FADC algorithm
  211. FADC timing
  212. FCAL-Insert
  213. FCALLeadGlass
  214. FCALPMT
  215. FCAL Beamtest Geometry
  216. FCAL Beamtest Setup Pictures
  217. FCAL Construction Readiness Review Checklist
  218. FCAL DAQ Meetings
  219. FCAL GEANT simulations http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf
  220. FCAL HV scan
  221. FCAL Magnetic Shield Design
  222. FCAL Readout Electronics
  223. FCAL Reconstruction 04/08/2012
  224. FCAL Reconstruction MIN BLOCK 04/24/2012
  225. FCAL Reconstruction in b1pi events 03/06/2012
  226. FCAL preparation status
  227. FCAL timing 7/1/15
  228. FDC Beam hole size
  229. FDC Nominal Design Parameters
  230. FDC Overview
  231. FDC Readiness Agenda
  232. FDC Readiness Checklist
  233. FDC Test
  234. FDC geometry May09
  235. FDC geometry study
  236. FDC procedures
  237. FDC prototype magnet test status (Simon T.)
  238. FDC tilt/alignment update
  239. FSRoot
  240. FSU Data Challenge 2
  241. Fall-2018-Running
  242. Fall 2015
  243. Fall 2015 Commissioning Plan
  244. Fall 2015 spring 2016
  245. Fall 2016
  246. Fall 2016 High Intensity/L3 beam test
  247. Fall 2016 Run time charts
  248. Fall 2016 Run time charts nogoni
  249. Fall 2016 Run time charts progress
  250. Fall 2019 TRD/GEM Commissioning
  251. Fall 2022 Run Coordination Meetings
  252. Fast Monitoring System - PXI
  253. Fast access procedureV1
  254. Fast shutdown requirements for voltages
  255. Fcal Readiness Checklist
  256. Fe-55 spectra
  257. Fe55 peak shape
  258. Feb. 07, 2008 Tracking CDC/FDC
  259. Feb 09
  260. Feb 10, 2011 Readout
  261. Feb 11, 2010 Readout
  262. Feb 11, 2011 Replacement Solenoid
  263. Feb 14, 2013 SiPM Electrical and Cooling
  264. Feb 14, 2014 Design Meeting
  265. Feb 15, 2013 Fab Meeting
  266. Feb 18, 2010 Calorimetry
  267. Feb 19,2013 Readout
  268. Feb 2, 2011 SiPM Electrical and Cooling
  269. Feb 20, 2024 HallD AI/ML meeting
  270. Feb 23, 2011 SiPM Electrical and Cooling
  271. Feb 24
  272. Feb 24, 2011 Readout
  273. Feb 25, 2010 Readout
  274. Feb 28, 2013 SiPM Electrical and Cooling
  275. Feb 28, 2014 Design Meeting
  276. Feb 4, 2010 Calorimetry
  277. Feb 7, 2020 Engineering Group Meeting
  278. Feb 8, 2013 Design Meeting
  279. Feb 9, 2011 SiPM Electrical and Cooling
  280. Feb 9, 2017
  281. Feb 9, 2018
  282. February 03, 2012 Fab Meeting
  283. February 08, 2023 Tech group meeting
  284. February 1, 2012 Tracking CDC/FDC
  285. February 1, 2024
  286. February 10, 2012 Design Meeting
  287. February 12, 2024 KLONG CPS Design Meeting
  288. February 13, 2012 (11:30AM), Physics Working Group
  289. February 14, 2011 (11:30AM), Physics Working Group
  290. February 15, 2024
  291. February 16, 2020
  292. February 16, 2021
  293. February 16, 2023
  294. February 17, 2009 Physics
  295. February 17, 2012 Fab Meeting
  296. February 17, 2022 DIRC
  297. February 17, 2022 KLONG Phase II Design Meeting
  298. February 18, 2011 Design
  299. February 2, 2023
  300. February 2014 Hall-B/Hall-D ClaRA/JANA discussion
  301. February 22, 2024
  302. February 23, 2009 Tracking CDC/FDC
  303. February 23, 2010 Tracking CDC/FDC
  304. February 23, 2023
  305. February 24, 2009 Physics
  306. February 24, 2012 Design Meeting
  307. February 26, 2014 Calibration
  308. February 26, 2020 FCAL 2 Design Meeting
  309. February 26, 2021
  310. February 27, 2020 CPP Design Meeting
  311. February 27, 2024 KLONG CPS Design Meeting
  312. February 28, 2011 (11:30AM), Physics Working Group
  313. February 29, 2024
  314. February 3, 2022 DIRC
  315. February 8, 2013 PID Upgrade
  316. February 8, 2016
  317. February 8, 2024
  318. February 9, 2009 Tracking CDC/FDC
  319. February 9, 2010 Tracking CDC/FDC
  320. February 9, 2015
  321. February 9, 2023
  322. February xx, 2009 Physics
  323. Feedback from Barry Ritchie/ Tue Apr 14
  324. Feedback from Joerg
  325. Fernando's email
  326. Fiber Spectra - Regina
  327. Fiber Test Results K
  328. Fiber Test with SiPM
  329. Fiber Tests at Regina
  330. Fiber lengths
  331. Fiber test stand
  332. Field stability study
  333. File:BillMerzMail
  334. Fill the spreadsheet
  335. Final test of dividers
  336. Finalizing design of the vacuum chamber
  337. First - 50"
  338. First Batch (192 crystals)
  339. First CDC straw alignment offsets
  340. First Level Trigger review layout
  341. First Tests in Hall-D
  342. First effort on raw data tape simulation
  343. First fiber tests
  344. First look at TOF calibration
  345. First look at TOF data from Fall 2014
  346. First look at cross sections from Spring 2017 run
  347. First look at simulated GEMTRD hits
  348. First measurement of near-threshold J/ψ exclusive photoproduction off the proton
  349. First signals
  350. First test
  351. Fixed array: design
  352. Flash talks
  353. Flatness plots and discussion
  354. Flux and luminosity
  355. Follow up on the Hodoscope Fabrication Readiness Review
  356. For the fourth coil
  357. For the second coil
  358. For the third coil
  359. Frame and Engineering
  360. Friday, May 3, 2019
  361. Full Crate Acceptance
  362. G3G4 comparison sim
  363. GCC at JLab, March 2015
  364. Gain Adjustments
  365. Gain Matching
  366. Gamma conversions in forward region
  367. Gams reconstruction
  368. Gas System Control Applications
  369. Gas leak tests
  370. Gas mixture tests
  371. Gcc O2 optimizations
  372. Geant4 Upgrade Meetings
  373. Generic DAQ Task List
  374. Geometries for 2008 DC Review
  375. Getting Started with GlueX Software
  376. Getting Started with the GlueX Analysis Software on the JLab CUE
  377. Getting started with Hall-D Software on the JLab CUE
  378. Git Repositories
  379. Glasgow conceptual design of the GlueX tagger
  380. GlueX-2023-01 data reconstruction
  381. GlueX-Collaboration-Feb-2013
  382. GlueX-Collaboration-Feb-2014
  383. GlueX-Collaboration-Feb-2022
  384. GlueX-Collaboration-Feb-2023
  385. GlueX-Collaboration-Jan-2008
  386. GlueX-Collaboration-May-2008
  387. GlueX-Collaboration-May-2021
  388. GlueX-Collaboration-May-2023
  389. GlueX-Collaboration-May-2024
  390. GlueX-Collaboration-Sep-2022
  391. GlueX-Collaboration-Sep-2023
  392. GlueX-Online-Workshop-2009
  393. GlueX-Online-Workshop-2010
  394. GlueX-related shared accounts on the JLab CUE
  395. GlueX/IHEP Meeting, September 17, 2018
  396. GlueX/IHEP Meeting, September 4, 2018
  397. GlueX/PANDA/EIC Machine Learning Workshop, May 25-29, 2020, Darmstadt, Germany
  398. GlueX/Primex 2008-06-04
  399. GlueX/Primex 2008-06-19
  400. GlueX/Primex 2008-07-09
  401. GlueX/Primex 2008-07-30
  402. GlueX/Primex 2009-03-23
  403. GlueX Analysis Workshop 2013
  404. GlueX Bluejeans Video Conferencing
  405. GlueX Containers Meeting, February 16, 2018
  406. GlueX Containers Meeting, March 2, 2018
  407. GlueX Data Challenge Meeting, February 28, 2014
  408. GlueX Data Challenge Meeting, January 31, 2014
  409. GlueX Data Classes
  410. GlueX Endorsed Experiments
  411. GlueX Implementation of the RCDB
  412. GlueX PID Meeting, April 11, 2019
  413. GlueX PID Meeting, April 18, 2023
  414. GlueX PID Meeting, April 19, 2022
  415. GlueX PID Meeting, April 20, 2021
  416. GlueX PID Meeting, April 23, 2020
  417. GlueX PID Meeting, April 25, 2019
  418. GlueX PID Meeting, April 5, 2022
  419. GlueX PID Meeting, April 9, 2020
  420. GlueX PID Meeting, August 1, 2019
  421. GlueX PID Meeting, August 10, 2021
  422. GlueX PID Meeting, August 11, 2020
  423. GlueX PID Meeting, August 15, 2019
  424. GlueX PID Meeting, August 22, 2022
  425. GlueX PID Meeting, August 24, 2021
  426. GlueX PID Meeting, August 25, 2020
  427. GlueX PID Meeting, August 29, 2019
  428. GlueX PID Meeting, December 1, 2020
  429. GlueX PID Meeting, December 13, 2022
  430. GlueX PID Meeting, December 14, 2021
  431. GlueX PID Meeting, December 20, 2018
  432. GlueX PID Meeting, December 5, 2019
  433. GlueX PID Meeting, December 6, 2018
  434. GlueX PID Meeting, February 22, 2022
  435. GlueX PID Meeting, February 27, 2020
  436. GlueX PID Meeting, February 8, 2022
  437. GlueX PID Meeting, February 9, 2021
  438. GlueX PID Meeting, Febuary 14, 2019
  439. GlueX PID Meeting, January 11, 2022
  440. GlueX PID Meeting, January 12, 2021
  441. GlueX PID Meeting, January 17, 2019
  442. GlueX PID Meeting, January 25, 2022
  443. GlueX PID Meeting, January 26, 2021
  444. GlueX PID Meeting, January 30, 2020
  445. GlueX PID Meeting, January 31, 2019
  446. GlueX PID Meeting, January 31, 2023
  447. GlueX PID Meeting, July 14, 2020
  448. GlueX PID Meeting, July 25, 2022
  449. GlueX PID Meeting, July 28, 2020
  450. GlueX PID Meeting, June 15, 2021
  451. GlueX PID Meeting, June 18, 2020
  452. GlueX PID Meeting, June 19, 2019
  453. GlueX PID Meeting, June 20, 2019
  454. GlueX PID Meeting, June 30, 2020
  455. GlueX PID Meeting, June 4, 2020
  456. GlueX PID Meeting, June 6, 2019
  457. GlueX PID Meeting, March 12, 2020
  458. GlueX PID Meeting, March 14, 2019
  459. GlueX PID Meeting, March 22, 2022
  460. GlueX PID Meeting, March 23, 2021
  461. GlueX PID Meeting, March 28, 2019
  462. GlueX PID Meeting, March 7, 2023
  463. GlueX PID Meeting, March 8, 2022
  464. GlueX PID Meeting, March 9, 2021
  465. GlueX PID Meeting, May 16, 2023
  466. GlueX PID Meeting, May 17, 2022
  467. GlueX PID Meeting, May 18, 2021
  468. GlueX PID Meeting, May 21, 2020
  469. GlueX PID Meeting, May 3, 2022
  470. GlueX PID Meeting, May 4, 2021
  471. GlueX PID Meeting, May 7, 2020
  472. GlueX PID Meeting, May 8, 2019
  473. GlueX PID Meeting, November 16, 2021
  474. GlueX PID Meeting, November 17, 2020
  475. GlueX PID Meeting, November 2, 2021
  476. GlueX PID Meeting, November 21, 2019
  477. GlueX PID Meeting, November 30, 2021
  478. GlueX PID Meeting, November 8, 2018
  479. GlueX PID Meeting, November 8, 2022
  480. GlueX PID Meeting, October, 2022
  481. GlueX PID Meeting, October 10, 2019
  482. GlueX PID Meeting, October 19, 2021
  483. GlueX PID Meeting, October 20, 2020
  484. GlueX PID Meeting, October 24, 2019
  485. GlueX PID Meeting, October 25, 2022
  486. GlueX PID Meeting, October 6, 2020
  487. GlueX PID Meeting, September 12, 2019
  488. GlueX PID Meeting, September 21, 2021
  489. GlueX PID Meeting, September 26, 2019
  490. GlueX Phase III Trigger
  491. GlueX Presentation Acknowledgement APS/GHP 2021
  492. GlueX Project Overviews
  493. GlueX Shifts
  494. GlueX Software Meeting, April 22, 2024
  495. GlueX Software Meeting, August 14, 2023
  496. GlueX Software Meeting, August 28, 2023
  497. GlueX Software Meeting, December 18, 2023
  498. GlueX Software Meeting, December 19, 2022
  499. GlueX Software Meeting, January 30, 2023
  500. GlueX Software Meeting, March 13, 2023

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)