Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • *[[Level-1 Trigger]] <td width=150 bgcolor="#e0e0f0"><font size="+1">[[Meetings]]</font></td>
    10 KB (1,470 words) - 16:57, 28 March 2024
  • * K<sub>L</sub> [https://www.jlab.org/conferences/kl2016/ Workshop] February 1-3, 2016. mini-Proceedings [https://arxiv.org/pdf/1604.02141v1.pdf].
    10 KB (1,163 words) - 10:53, 18 April 2024
  • * <b>Talk 1</b>GlueX-doc-1003 [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument
    4 KB (510 words) - 14:52, 18 August 2023
  • [[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=528&version=1 GlueX Note 528]] . 1.0GeV pi+ particles isotropically in hdgeant and fitting the resulting track
    4 KB (738 words) - 17:13, 24 February 2017
  • ...ched). I've also overlaid the beam spot size in z for both the 2.6 mm and 1.0 mm collimator. I calculate this as (spot size) / ( sqrt(12) * sin( theta spot diameter = 1.9 cm
    5 KB (863 words) - 17:14, 24 February 2017
  • ...Doc 4294]][[https://inspirehep.net/literature?sort=mostrecent&size=25&page=1&q=refersto%3Arecid%3A1798503 Citations]].
    2 KB (295 words) - 08:31, 21 August 2023
  • ...s set to "0", then every trigger is accepted. When the prescale is set to "1", then every other trigger is read. When the prescale is set to "2", then e Slot 0 Slot 1 Slot 2 Slot 3 Slot 4
    16 KB (2,552 words) - 15:46, 1 October 2015
  • ...linearity over the range of photon energies from 137 to 653 MeV (see Table 1). ...0) of 1.5 cm. Each layer of the module to be tested has 96 SciFi's spaced 1.38 mm apart (center-to-center) and the layers are such that they do not pre
    40 KB (6,903 words) - 11:09, 31 March 2015
  • 2334 Sep24 15:07 -1.2cm (nominal center), trigger bit 4. 2335 Sep24 17:33 1.0 Z=-97.8cm (beam closer to South end),
    10 KB (1,209 words) - 06:05, 1 April 2015
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    6 KB (925 words) - 14:54, 19 November 2015
  • ...solution (along wires) ~120 microns; wire resolution ~110 microns (between 1 and 4.5 mm from the wire). ...sure the FDC preamp+cable response function (last plot). The gain is about 1.8mV/fC. When compared with the fADC amplitude it saturates in a different w
    4 KB (617 words) - 19:28, 19 November 2015
  • January 2023 [[Tracking-1-5-2023|(5)]] [[Tracking-1-19-2023|(19)]] September 2022 [[Tracking-9-1-2022|(1)]] [[Tracking-9-15-2022|(15)]]
    16 KB (1,785 words) - 16:56, 15 April 2023
  • * [[GlueX Software Meeting, September 1, 2020 | September 1, 2020]] * [[GlueX Offline Meeting, June 1, 2018|June 1, 2018]]
    21 KB (1,819 words) - 10:07, 3 May 2024
  • D. Lawrence 1/18/07 Finished Converting to Wiki <br> M. Ito 1/5/10 Added HDDS to list of 3rd party software <br>
    22 KB (3,180 words) - 07:16, 30 September 2014
  • * [[March 1, 2023 Calorimeter]] 11:00 am ET * [[February 1, 2023 Calorimeter]] 11:00 am ET
    17 KB (1,332 words) - 12:57, 23 April 2024
  • *[[2022-12-01| December 1]] *[[2021-07-01 | July 1]]
    4 KB (435 words) - 11:27, 1 May 2024
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    2 KB (249 words) - 10:51, 31 March 2015
  • ...495, also as GlueX-doc-239. It looks reasonable to extend this sum from n=1,36 for all readouts in the beam test. Beam spot also plays a role here. ...= \frac{a}{\sqrt{E}} \oplus b</math>, with a being around 5% and b around 1%, consistent among the three analyses, and independent of incident angle. C
    5 KB (723 words) - 10:41, 31 March 2015
  • * [[Media:TAGGER_INTERFACE_DWG_SHT_1.pdf | Tagger interface drawing sheet 1]] * [[Image:Glue X Coil -1 Leak Check.xls.pdf | Leak test of Solenoid Coil #1]]
    997 B (137 words) - 07:21, 5 June 2020
  • <tr><td bgcolor="#e0e0f0">[[Sweep Magnet 1|Sweep Magnet 1]]</td></tr>
    3 KB (477 words) - 10:35, 24 March 2022
  • ...tio of 80:1</u>. The electronic noise on the signal was on the level of 0.1&nbsp;pA. The signal disappeared immediately during beam interruptions, so ...y in Hall B during the current test run at 10&nbsp;nA corresponds to about 1% of the nominal GlueX operating intensity. If the Hall B beam spot on the
    6 KB (1,048 words) - 12:38, 14 March 2017
  • [[Image:Fcal_cw_test-1.jpg|400px|Production Cockroft-Walton Bases]]
    344 B (51 words) - 09:40, 3 July 2012
  • 1:30 PM Wed 27-Apr-2011 CC F326 1:30 PM Wed 25-May-2011 CC F326
    5 KB (852 words) - 17:54, 31 March 2015
  • ...'s measurements. The ratio is approximately 2. Therefore, the expected PDE@1.2V for the C20 is about 8.5/2 = 4.2. Carl measured it to be 4.4 &plusmn; 0. '''Conclusion:''' At the operating point of about 1.2 V above breakdown, the PDE for the C20 (1mm2, 17% fill factor) SiPM is ab
    4 KB (617 words) - 12:39, 14 March 2017
  • 1.) dial:
    3 KB (474 words) - 17:13, 24 February 2017
  • ...s://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=819 BCAL Module 1 Specs]
    4 KB (536 words) - 12:39, 14 March 2017
  • ...ee ticks used by single factory.</s><ref>This changed appeared in jana 0.6.1</ref> ...w 3rd parties to build using it.</s><ref>This changed appeared in jana 0.6.1</ref>
    17 KB (2,874 words) - 21:04, 29 November 2019
  • ...nergy resolution|Regina stand-alone BCal Monte Carlo simulation]] (ReSAM) [1],
    2 KB (360 words) - 17:00, 24 February 2017
  • # Review minutes from [[May 1, 2007 Software]] meeting 1.) dial:
    4 KB (725 words) - 17:13, 24 February 2017
  • * [[Level-1 Trigger]]
    4 KB (507 words) - 13:09, 8 July 2021
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    3 KB (426 words) - 17:13, 24 February 2017
  • * [[OWG Meeting 1-Jun-2016 | 1-Jun-2016]] * [[OWG Meeting 1-Jul-2015 | 1-Ju1-2015]]
    8 KB (746 words) - 09:18, 5 March 2018
  • ...dered for reducing the amount of material seen by forward-going particles [1,2]. These ideas have recently coalesced into one concrete proposal from th [[Image:radlen-img.gif|thumb|right|Figure 1: Cut view through the axis of the GlueX detector, showing the downstream en
    5 KB (708 words) - 12:40, 14 March 2017
  • May 29, 2007, Calorimetry meeting, 1:00 PM EDT [[Image:ReSAM samfrac 1.gif|thumb|100px|left|'Low Energy MC SF Resolution']]
    4 KB (640 words) - 17:12, 24 February 2017
  • * [[PID Day 1 Notes]]
    6 KB (746 words) - 12:40, 14 March 2017
  • ...parallel to the floor). The counters were 10cm wide and ~40 cm long, and ~1/4" thick. Unfortunately we did not take and pictures of the setup. The
    2 KB (299 words) - 11:33, 31 March 2015
  • The default step size set for materials when AUTO is off is 1 cm. This default is assigned in the hdds-geant TRIG 1
    9 KB (1,354 words) - 13:55, 13 November 2012
  • ...note2.pdf Gluex-doc-827-v3]: sampling fraction fluctuations from 10 MeV to 1 GeV (See Fig. 12 and 13)
    857 B (110 words) - 12:38, 14 March 2017
  • Note that allotted times are very generous. ''Speakers should plan on using 1/2 of the time for a presentation. The remainder can be used for additional ** 12:30 - 1:30: Lunch
    3 KB (335 words) - 12:40, 14 March 2017
  • 1.) dial: ...population of the phase space in the region of &theta;=1<sup>o</sup> and p=1 GeV/c.
    3 KB (443 words) - 12:40, 14 March 2017
  • #** US or Canada: +1 408 740 7256 or #** US or Canada: +1 888 240 2560
    3 KB (435 words) - 06:50, 19 January 2022
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    8 KB (1,292 words) - 16:48, 24 February 2017
  • === [[GlueX Offline Meeting, June 1, 2010|June 1, 2010]] === === [[GlueX Offline Meeting, December 1, 2009|December 1, 2009]] ===
    2 KB (295 words) - 17:51, 29 November 2019
  • 1.) dial:
    6 KB (888 words) - 12:38, 14 March 2017
  • 1.) dial:
    680 B (87 words) - 12:38, 14 March 2017
  • ...ontrol the magnet deformation within limit when the magnet is operating at 1.5 T? **## Yang: Gap will be reduced at 1.8T relative to the 1.5 T operation. Can the gap change be accomodated in the design? Sergei: Pol
    12 KB (2,033 words) - 17:13, 24 February 2017
  • 1.) dial:
    1 KB (136 words) - 12:40, 14 March 2017
  • *# Dec. 7th-8th Electron/Photon beam restoration (1 days) ...ted time: typically, we will do trigger study and take trigger data during 1.5 shift (the second half of the swing shift and during owl shift).
    14 KB (2,187 words) - 16:28, 26 November 2018
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    5 KB (708 words) - 12:38, 14 March 2017
  • ** Dec 1: for Hall D engineering to develop this concept. This will include the conc ** Dec 1: To provide a concept for matching the light guides (LGs) to the trapezoida
    6 KB (894 words) - 12:38, 14 March 2017
  • {| border="1" cellpadding="2" {| border="1" cellpadding="2"
    9 KB (1,235 words) - 12:39, 14 March 2017
  • *[[Tracking-1-19-2023| Jan 5]] *[[Tracking-1-19-2023| Jan 19]]
    15 KB (1,677 words) - 16:13, 30 March 2023
  • ...of December 3. Other arrays and improvements will be tested next. Phase-1 closure report is aimed for before Xmas. The current arrays will not allow
    4 KB (586 words) - 17:12, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (570 words) - 17:00, 24 February 2017
  • ...of December 3. Other arrays and improvements will be tested next. Phase-1 closure report is aimed for before Xmas. The current arrays will not allow
    4 KB (512 words) - 17:14, 24 February 2017
  • 1.) dial:
    957 B (122 words) - 12:38, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (699 words) - 17:05, 24 February 2017
  • 1.) ESNET: 8242553 +1-800-377-8846 : US
    2 KB (333 words) - 17:12, 24 February 2017
  • 1) dial:<br> +1-800-377-8846 : US<BR>
    4 KB (638 words) - 12:39, 14 March 2017
  • ** 1:15 Status of simulation (25) --- Richard ** 1:45 Offline Sofware Status (15) --- David L.
    4 KB (618 words) - 17:00, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (603 words) - 17:00, 24 February 2017
  • * 1:00 Data Format & Rates - Ed, Gerard, David Abbott, Elliott * '''1:50 Break'''
    933 B (107 words) - 17:05, 24 February 2017
  • ...ia:Counter_table_2017(b).xlsx|Refined hodoscope counter positions, updated 1/2017]] - Dan Sober ...dia:Counterbounds2017(b).xlsx|Updated hodoscope energy bin bounds, updated 1/2017]] - Dan Sober
    3 KB (433 words) - 21:36, 5 February 2020
  • ...%20OD.pdf|Tagger engineering drawing D000000202-1006-A TUBE ASSY 2.75 CF X 1.25 TUBE OD.pdf]] ..._interfaceD00000-19-00-3001_SHT1.pdf Tagger magnet critical interfaces sht 1], Feb. 23, 2009.
    3 KB (465 words) - 14:44, 23 March 2016
  • * [[collimatorMtgs-1-14-2013|January 14, 2013]] [[file:active_collimator_installed_5mm_hole.jpg|photo 1 of active collimator installed in the 5mm collimator position]]
    6 KB (981 words) - 15:28, 21 July 2020
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    1 KB (148 words) - 12:39, 14 March 2017
  • # choice of photon energy in the range 6 - 12 GeV [1] # duty factor >90% at 500 MHz beam pulse repetition rate [1]
    3 KB (379 words) - 11:38, 8 February 2013
  • <br/>Figure 1. CAD model of the Newport crystal goniometer</td>
    2 KB (238 words) - 11:22, 15 March 2016
  • ...ustbunny.physics.indiana.edu/~dzierba/CDR_Calorimeter/dzierba_cal_rev Talk 1] 8:00 am Alex
    4 KB (522 words) - 12:38, 14 March 2017
  • ...wing proposal from our collaborators at CHESS was discussed at our meeting 1/17/2008. # What minimum size is required? <br><font color="blue"> I would say around 1 mm. Bigger samples (3 to 5 mm) are more convenient to work with.</font>
    3 KB (426 words) - 10:44, 29 November 2011
  • ...irements of the GlueX experiment outlined in the Conceptual Design Report [1] and the expected capabilities of the 12 GeV CEBAF accelerator, as estimate ...nswer to need 1. The essential results from [2] are shown below in Tables 1 and 2. In answer to need 2, the CASA group has developed a set of ''Expect
    9 KB (1,420 words) - 12:38, 14 March 2017
  • ::: - production (1 - 2 night shifts) ::: - production at low luminosity with the FDC switched on (1 - 2 night shifts for both the FDC alignmnent and FCAL MIP triggers)
    2 KB (245 words) - 11:00, 14 December 2015
  • Tuesday, December 1, 2015<br>
    2 KB (371 words) - 17:13, 2 December 2015
  • ....e. the microscope covers the energy range 8.1&lt;E<sub>&gamma;</sub>&lt;9.1 GeV. ...idths were calculated such that the typical rate per counter is limited to 1-4 MHz at 10<sup>8</sup> &gamma;/sec on target.
    3 KB (397 words) - 21:00, 25 January 2017
  • 1.) dial:
    856 B (109 words) - 12:40, 14 March 2017
  • ...he level required to maintain the polarization at the coherent peak within 1% of its value at nominal alignment while running at beam currents ''I<sub>e ...el required to maintain the tagging efficiency at the coherent peak within 1% of its value at nominal alignment while running at ''I<sub>e</sub>'' > 100
    6 KB (960 words) - 18:02, 27 May 2015
  • {| border=1 ...tion by weigth (Web) || align=center | 55% PbO, 38% SiO2, 5% K2O, 1% Na2O
    2 KB (346 words) - 13:59, 9 February 2018
  • ...), pi2(1670), pi1(1600)] [[http://www.jlab.org/Hall-D/software/wiki/images/1/1d/Multi-res_plots.pdf pdf file]] 1.) dial:
    8 KB (1,388 words) - 12:38, 14 March 2017
  • ...[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1003 Talk 1] 10:00 am Curtis ##* Talk 15 1:00pm Eugene
    5 KB (628 words) - 17:13, 24 February 2017
  • ...unter_mounted_to_the_liquid_H2_target_assembly.png|thumb|upright=1.0| Fig. 1: The GlueX Start Counter mounted to the liquid H2 target assembly<ref name=
    3 KB (374 words) - 11:39, 13 September 2023
  • 1. Design, procure and commission all the electronics instrumentation by work > '''ASIC''' - GAS-1 Description, Tests, Status & Plans [https://halldweb.jlab.org/doc-private/D
    10 KB (1,242 words) - 10:59, 20 December 2019
  • Current planning is for a 1 1/2 day meeting the week of 7-May, with no parallel sessions. This will be a ** Dial +1-800-377-8846 : US
    7 KB (978 words) - 12:39, 14 March 2017
  • * The meeting will be held at 1:00 pm ET (11:00 am MST) ** +1-800-377-8846 : US
    4 KB (550 words) - 17:13, 24 February 2017
  • * The meeting will be held at 1:00 pm ET (11:00 am MST) ** +1-800-377-8846 : US
    4 KB (625 words) - 16:51, 24 February 2017
  • * Seems like one day is too short, likely will go with a 1 1/2 day review. ...halldweb.jlab.org/DocDB/0010/001017/001/HallD_Level_1_OverviewV2.pdf level 1 trigger] and send him comments.
    4 KB (632 words) - 12:40, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    7 KB (1,115 words) - 16:51, 24 February 2017
  • See Dave Doughty's note on the Level 1 trigger design on the GlueX DocDB: [https://halldweb.jlab.org/DocDB/0010/00
    2 KB (254 words) - 12:40, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    3 KB (498 words) - 16:58, 24 February 2017
  • JANA (>=0.4.1) comes with a command-line utility called ''jgeomread'' that can used ...into multiple values using a delimiter (''e.g. for attributes like X_Y_Z="1 2 3"'')
    15 KB (2,369 words) - 08:50, 5 June 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    3 KB (385 words) - 17:12, 24 February 2017
  • [[Image:scale_em_rate.jpg|thumb|right|Fig. 1. Scale factor for the EM background rate as function of the ...threshold of generated bremsstrahlung photons. The scale factor equals to 1 at E_gamma = 0.12 GeV,
    6 KB (956 words) - 14:47, 14 April 2022
  • ...[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1043 Level 1 Trigger Simulation] ...m_Review_May08/Final_Talks/W7-HallD%20System%20&%20Infrastructure%20Review-1.ppt Electronics]
    3 KB (472 words) - 12:40, 14 March 2017
  • * [[Software and Computing Review 7]] (Feb 1,2) * [[Experimental Readiness Review]] JLab, July 1-2, 2014
    4 KB (465 words) - 12:27, 3 January 2024
  • - Discussing without Bill the protective covers: aluminum 1/8" thick. Eugene asked why they are so thick so we can't use iron source. L
    4 KB (603 words) - 16:15, 2 November 2011
  • ...MeV (new value). The immediate demand is to satisfy the requirement of 0.1% absolute energy calibration for the Primex experiment. More generally, it ...on absolute polarization determination''' - changed from 2% (old value) to 1% (new value). The 2% value was based on having only the spectral shape ana
    9 KB (1,425 words) - 12:39, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    1 KB (159 words) - 17:11, 24 February 2017
  • Next Meeting: June 5, 2008 @ 1:30 p.m. - IUCF provided a report of the results of the Phase 1 wire winding.
    15 KB (2,462 words) - 17:13, 24 February 2017
  • * Z = -1 cm, 0 cm, 1 cm, (3 cm) * Y = -1 cm, 0 cm, 1 cm, (3 cm)
    1 KB (235 words) - 04:25, 1 April 2015
  • ** Area of the output of the WC (1.2 cm2) reduces the readout by 4cm2/1.2cm2 = 3.3. inner 111.6 cm2 24 SiPM (circle) 1.13cm2 27.1 cm2 0.24
    4 KB (565 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    2 KB (336 words) - 17:13, 24 February 2017
  • Next Meeting: June 19, 2008 @ 1:30 p.m. - Bill found a precision straight edge 1.5 m long for $750. We can
    8 KB (1,388 words) - 17:13, 24 February 2017
  • Monday June 16, 2008 at 1:30pm 1.) ESNET: 8542553
    2 KB (349 words) - 17:07, 24 February 2017
  • Next Meeting: June 26, 2008 @ 1:30 p.m. - Bill found a precision straight edge 1.5 m long for $750. We can
    10 KB (1,577 words) - 17:13, 24 February 2017
  • * [https://inspirehep.net/conferences?sort=dateasc&size=25&page=1&start_date=upcoming&subject=experiment-nucl INSPIRE List of Conferences] ...Tools for Hadron Spectroscopy (PWA13/ATHOS8)], Williamsburg, VA, 28 May - 1 June 2024
    42 KB (5,494 words) - 09:48, 23 April 2024
  • Next Meeting: July 3, 2008 @ 1:30 p.m. - Bill found a precision straight edge 1.5 m long for $750. We can
    10 KB (1,617 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    7 KB (1,029 words) - 17:13, 24 February 2017
  • Tuesday July 8, 2008 at 1:00pm 1.) ESNET: 8542553
    1 KB (142 words) - 12:38, 14 March 2017
  • Next Meeting: July 10, 2008 @ 1:30 p.m. - Elke has signed the paperwork for the continuation of the Phase 1
    9 KB (1,575 words) - 17:13, 24 February 2017
  • Monday July 14, 2008 at 1:30pm 1.) ESNET: 8542553<br/>
    1 KB (174 words) - 17:05, 24 February 2017
  • Next Meeting: July 17, 2008 @ 1:30 p.m. the new granite table that should arrive on August 1.
    12 KB (1,986 words) - 17:00, 24 February 2017
  • Next Meeting: July 24, 2008 @ 1:30 p.m. - The granite table that we ordered will be arriving August 1. Another
    13 KB (2,200 words) - 17:12, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    8 KB (1,223 words) - 12:38, 14 March 2017
  • Monday July 28, 2008 at 1:30pm 1.) ESNET: 8542553<br/>
    534 B (75 words) - 17:10, 24 February 2017
  • Next Meeting: July 31, 2008 @ 1:30 p.m. - Cathode delivery date is expected within roughly 1 to 2 weeks.
    17 KB (2,825 words) - 17:13, 24 February 2017
  • The meeting will be at 1:00pm in Cebaf Center F326. 1.) dial:
    4 KB (649 words) - 12:38, 14 March 2017
  • Next Meeting: August 7, 2008 @ 1:30 p.m. - Cathode delivery date is expected within roughly 1 week. Roger
    16 KB (2,632 words) - 17:13, 24 February 2017
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    2 KB (219 words) - 19:25, 12 November 2015
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    8 KB (1,237 words) - 12:40, 14 March 2017
  • ...would have at most 4 weeks of possible beam with 12 GeV priority including 1 week or more with beam only during owl and night shifts, if the accelerator
    4 KB (652 words) - 19:15, 1 December 2015
  • Next Meeting: August 14, 2008 @ 1:30 p.m. support ring. The table is 4 ft (w) x 6 ft (h) x 1 ft (d) and weighs
    19 KB (3,165 words) - 17:13, 24 February 2017
  • Monday August 11, 2008 at 1:30pm 1.) ESNET: 8542553<br/>
    784 B (106 words) - 12:39, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    6 KB (808 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    8 KB (1,135 words) - 17:12, 24 February 2017
  • Next Meeting: August 28, 2008 @ 1:30 p.m. 1 week until they show up (roughly).
    16 KB (2,702 words) - 17:14, 24 February 2017
  • Next Meeting: September 4, 2008 @ 1:30 p.m. 1. mechanical issues, including physical test of handling, tolerances
    18 KB (2,870 words) - 17:13, 24 February 2017
  • Next Meeting: September 11, 2008 @ 1:30 p.m. delivery in about 1 week.
    13 KB (2,115 words) - 17:12, 24 February 2017
  • ...C charge at the input of the ASIC for <5% linearity and below 270 fC for <1%). It was suggested that for the lower voltage settings the noise relative
    5 KB (797 words) - 16:54, 24 February 2017
  • Next Meeting: September 25, 2008 @ 1:30 p.m. be on the prototype wire winding from Phase 1. Elke will provide DSC
    14 KB (2,272 words) - 17:12, 24 February 2017
  • <td valign="top">+1-800-377-8846 : US <br>+1-888-276-7715 : Canada <br>+1-302-709-8424 : International *1:00-2:30--- [http://www.jlab.org/~fklein/fixed_array_Nov08.ppt Fixed Array
    10 KB (1,378 words) - 12:38, 14 March 2017
  • Next Meeting: October 2, 2008 @ 1:30 p.m. Bill used a punch to make a roughly 1-in diameter hole in one of our
    17 KB (2,787 words) - 17:14, 24 February 2017
  • #* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-9-2008/Hall_D_PS_9.1.3.doc pair spec. from collab meeting] |1 || Introduction || Richard || 1
    4 KB (496 words) - 12:40, 14 March 2017
  • <font size="+1">May 11, 12 and 13, 2009 at Jefferson Lab CC F326</font> ** +1-800-377-8846 : US
    8 KB (1,006 words) - 12:38, 14 March 2017
  • Next Meeting: October 9, 2008 @ 1:30 p.m. Bill used a punch to make a roughly 1-in diameter hole in one of our
    13 KB (2,198 words) - 16:53, 24 February 2017
  • ...ntinual development) was about $ 0.3M (last year), $0.6M (this year), and $1.1M (next year). The funding for the current year is being used to order the # Estimate for machining the ends of four modules at a time was about 1 week.
    19 KB (3,007 words) - 17:13, 24 February 2017
  • Next Meeting: October 16, 2008 @ 1:30 p.m. in about 1 month.
    12 KB (1,907 words) - 16:53, 24 February 2017
  • Next Meeting: October 23, 2008 @ 1:30 p.m. 1 week.
    12 KB (2,060 words) - 17:12, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    2 KB (244 words) - 17:12, 24 February 2017
  • Wed 12-Nov-2008 1:30pm CC L207
    5 KB (841 words) - 17:14, 24 February 2017
  • 1.) ESNET: +1-800-377-8846 : US
    1 KB (141 words) - 12:38, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    6 KB (892 words) - 17:14, 24 February 2017
  • 1.) dial:
    2 KB (297 words) - 17:13, 24 February 2017
  • ...r '''scp''' with the username and password that are posted in EEL126 ''(10/1/2015 actually, not for a very long time DL)'', or by copying the data files ...ny of the plots generated take the mean, RMS, or max Δ of all points in a 1 inch section of a single horizontal scan. They therefore do not actually re
    9 KB (1,530 words) - 15:49, 1 October 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (719 words) - 17:08, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (576 words) - 17:14, 24 February 2017
  • ...the responsibility of the person making the tag though to ensure at least 1 person ''does'' actually do this.
    6 KB (981 words) - 06:50, 23 November 2022
  • Next Meeting: January 15, 2009 @ 1:30 p.m.
    7 KB (1,169 words) - 17:12, 24 February 2017
  • * [[Media:Jlab_VXSTriggerProtocol-1.pdf|JLAB VXS TRIGGER PROTOCOL DOCUMENT - APRIL 2013]] * [[Media:TriggerMeetingNotes_1June2012.pdf|1-June-2012]]
    8 KB (778 words) - 16:55, 5 June 2014
  • ...eX Start Counter Meeting, October 1, 2015#Minutes|minutes from the October 1 meeting]]
    2 KB (366 words) - 13:25, 9 November 2015
  • 1.) Unpack the source and create a build directory next to it as suggested by ...ve a symbolic link: /usr/bin/cmake that points to /Applications/CMake\ 3.4.1.app/Contents/bin/cmake''
    6 KB (1,054 words) - 18:39, 22 December 2015
  • ** Dial: 1 888 240 2560 (US or Canada only)
    2 KB (357 words) - 17:14, 16 November 2015
  • ::: - production (1 - 2 night shifts) ::: - production at low luminosity with the FDC switched on (1 - 2 night shifts for both the FDC alignmnent and FCAL MIP triggers)
    3 KB (412 words) - 19:44, 25 February 2016
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (557 words) - 17:04, 24 February 2017
  • * +1-800-377-8846 : US * +1-888-276-7715 : Canada
    5 KB (818 words) - 16:44, 24 February 2017
  • Next Meeting: February 5, 2009 @ 1:30 p.m. 1 month. Roger is aware of this and will start on the board redesign
    9 KB (1,429 words) - 17:13, 24 February 2017
  • ...ultiplier-modules/part-h6152-70.php# H6152-70 Assembly] Assembly for R5505 1" pmt ...ultiplier-modules/part-h8409-70.php# H8409-70 Assembly] Assembly for R7761 1.5" pmt
    4 KB (503 words) - 16:53, 24 February 2017
  • {| border="1" cellpadding="2" valign="top" style="text-align: center;" {| border="1" cellpadding="2" valign="top" style="text-align: center;"
    14 KB (1,602 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (740 words) - 16:54, 24 February 2017
  • * Twelve light guides arrived from Plastic Craft on Friday April 1, 2011. They correspond to the light guides that form the inner twelve locat ...eb.com/search/DataSheet.aspx?MatGUID=a5e93a1f1fff43bcbac5b6ca51b8981f&ckck=1 MatWeb] regarding the material used in their light guide. As far as transmi
    8 KB (1,267 words) - 17:13, 24 February 2017
  • <math>E_{gen} = (\frac{ E_{rec} - B }{A})^{\frac{1}{1+\alpha}} </math> [[Image:H31 1 sum nCellLT5.png|400px]]
    3 KB (480 words) - 12:40, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (711 words) - 17:13, 24 February 2017
  • # [https://halldweb.jlab.org/DocDB/0012/001222/001/photonSource.pdf Version 1 installation schedule] - ''Jim'' # [http://gryphn.phys.uconn.edu/halld/diamonds/BNLdev-1-2009/smedley-2-2009.pptx Progress at BNL in laser ablation of diamonds] - '
    4 KB (714 words) - 12:39, 14 March 2017
  • 1:30 PM Wed 4-Mar-2009 CC F326 1.) dial:
    3 KB (508 words) - 17:14, 24 February 2017
  • Monday March 09 2009 at 1:30pm 1.) ESNET: 8542553<br/>
    1 KB (145 words) - 17:14, 24 February 2017
  • ....org/doc-private/DocDB/ShowDocument?docid=4901 The GlueX Experiment: (part 1) A short History of GlueX] ====Lecture 1: Fermion Anti-fermion Systems====
    10 KB (1,511 words) - 14:42, 15 October 2023
  • 1. ESNET: 85-42553 (85-HALLD) 1. Planning for the INT workshop in November (Curtis, Adam, Jo).
    3 KB (421 words) - 17:12, 24 February 2017
  • <math>f(x,a,\mu,\sigma,b)= a \cdot \exp\left(-\frac{1}{2} \left( \frac{(\lambda-\mu)}{\sigma}+\exp^{-(\lambda-\mu)/\sigma} \right <math>I_{scaled} = I \times 0.25 exp{\left(-\frac{1}{2}\frac{(\lambda-400nm)^{2}}{(80nm)^{2}}\right) } </math>
    6 KB (904 words) - 17:13, 24 February 2017
  • * [[May 1, 2012 Readout]] * [[Nov 1, 2011 Readout]]
    4 KB (375 words) - 21:03, 6 August 2013
  • ...his extension, the fixed array counters would have substantially more than 1% background at the low-energy end. This extension has not been implemented
    7 KB (1,115 words) - 12:39, 14 March 2017
  • Next Meeting: April 2, 2009 @ 1:30 p.m.
    9 KB (1,451 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    7 KB (1,067 words) - 16:52, 24 February 2017
  • #* +1-866-740-1260 : US and Canada
    1 KB (148 words) - 09:15, 28 March 2013
  • Next Meeting: April 9, 2009 @ 1:30 p.m. order will have 7 sets of 2 micron Cu boards and 1 set of 5 micron Cu
    9 KB (1,392 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    7 KB (1,076 words) - 17:14, 24 February 2017
  • Next Meeting: April 16, 2009 @ 1:30 p.m. of May. The final order will have 7 sets of 2 micron Cu boards and 1
    8 KB (1,362 words) - 17:14, 24 February 2017
  • #* Dial: 1 888 240 2560 (US or Canada only) .... There have been some obscure errors that have shown up, but so far only 1 job has had an error that he has been unable to reproduce. First results a
    7 KB (1,131 words) - 17:13, 24 February 2017
  • * [[Media:TGT- Target Cell Cross Section.pdf | Target Drawing 1/30/14]]
    680 B (91 words) - 12:40, 14 March 2017
  • * [[GlueX TOF Meeting, December 1, 2021|December 1, 2021]] * [[GlueX TOF Meeting, July 1, 2020|July 1, 2020]]
    15 KB (1,378 words) - 11:34, 21 April 2022
  • Next Meeting: April 23, 2009 @ 1:30 p.m. It should be back and reinstalled in about 1 week. No other news from
    9 KB (1,520 words) - 17:12, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (768 words) - 17:12, 24 February 2017
  • {| border="1" {| border="1"
    4 KB (593 words) - 10:25, 24 April 2017
  • == Sweep Magnet #1 (primary sweeping magnet collimator cave) == Image:PDV2.JPG|end view 1
    1 KB (207 words) - 12:38, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (564 words) - 17:13, 24 February 2017
  • Next Meeting: May 7, 2009 @ 1:30 p.m. (Note: No meeting next week) It should be back and reinstalled in about 1 week.
    10 KB (1,597 words) - 17:14, 24 February 2017
  • 1) Go to the directory where you want the source code to go. Checkout the sof 1) Run the MakeDSelector program to make a DSelector for your TTree. Run it
    13 KB (1,891 words) - 13:17, 14 April 2022
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    8 KB (1,180 words) - 17:13, 24 February 2017
  • Friday, May 1, 2009<br>
    1 KB (182 words) - 12:39, 14 March 2017
  • Wednesday May 6 2009 at 1:00pm 1.) ESNET: 8542553<br/>
    927 B (135 words) - 17:13, 24 February 2017
  • Next Meeting: May 14, 2009 @ 1:30 p.m.
    12 KB (1,957 words) - 17:12, 24 February 2017
  • Next Meeting: May 21, 2009 @ 1:30 p.m. they had sat for about 1.5 months. The table was cleaned off and then
    11 KB (1,922 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (643 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    3 KB (438 words) - 17:13, 24 February 2017
  • Next Meeting: May 28, 2009 @ 1:30 p.m.
    8 KB (1,406 words) - 17:13, 24 February 2017
  • ...ss sections and the beam asymmetry have been obtained from threshold up to 1.5 GeV of beam energy. The two resonances S11(1535) and Δ(1700) are expecte ...gular distributions are also presented, from which it is concluded that JP=1-, 2-, or 3+.
    6 KB (829 words) - 12:39, 14 March 2017
  • Tuesday May 26 2009 at 1:00pm 1.) ESNET: 8542553<br/>
    3 KB (579 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    3 KB (504 words) - 17:13, 24 February 2017
  • ...iew of [[GlueX TOF Meeting, December 1, 2015#Minutes|minutes from December 1]] ...iew of [[GlueX TOF Meeting, December 1, 2015#Minutes|minutes from December 1]] ===
    2 KB (312 words) - 17:08, 13 January 2016
  • Next Meeting: June 4, 2009 @ 1:30 p.m. - Due to the shortage of cathodes from Allflex (delivery should be 1
    10 KB (1,597 words) - 17:13, 24 February 2017
  • ** &sigma; is dependent on amount of information: # hits USED (= 1/2 of total # hits: reject largest dE/dx hits to remove Landau tail) ** &sigma; is dependent on amount of information: # hits USED (= 1/2 of total # hits: reject largest dE/dx hits to remove Landau tail)
    2 KB (315 words) - 15:57, 14 December 2011
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (684 words) - 17:05, 24 February 2017
  • '''<font color=red>Teleconference Time: 1:30 p.m. EST</font>''' ##* Note: The GEANT threshold is currently very low, about 1 MeV in the Pb/fiber matrix. This way, different thresholds can be applied a
    3 KB (458 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    6 KB (886 words) - 17:10, 24 February 2017
  • ** Magnet forces: 5 kG == 1 Atm, scales as square of B field. ** Coil center located 1/3 of the way along the long axis of our test area.
    14 KB (2,160 words) - 13:17, 8 May 2013
  • 1.) ESNET: 8542553<br/> +1-800-377-8846 : US<br/>
    4 KB (605 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (571 words) - 17:11, 24 February 2017
  • {| border="1" | solenoid_1500_20081112-1
    29 KB (4,257 words) - 14:11, 1 June 2018
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    2 KB (219 words) - 17:12, 24 February 2017
  • <font size="+1">September 10, 11 and 12, 2009 at Carnegie Mellon University</font> <td>[http://www.ichotelsgroup.com/h/d/hi/1/en/hotel/pitsp Holiday Inn Select]</td>
    10 KB (1,422 words) - 12:39, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    901 B (118 words) - 17:05, 24 February 2017
  • #* Dial: 1 888 240 2560 (US or Canada only)
    2 KB (228 words) - 15:53, 7 June 2016
  • .... They tried two different trigger counters, one 4&nbsp;cm wide, the other 1&nbsp;cm wide. With the narrow trigger counter they were able to achieve a r
    1 KB (218 words) - 07:10, 1 April 2015
  • Monday October 5 2009 at 1:30pm 1.) ESNET: 8542553<br/>
    638 B (91 words) - 12:38, 14 March 2017
  • {| border="1" | 1.6GHz
    3 KB (526 words) - 14:32, 31 March 2020
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    2 KB (298 words) - 17:12, 24 February 2017
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    1 KB (169 words) - 20:28, 24 March 2016
  • '''Room:''' '''<font size="+1">CC F326-327</font>''' '''Time:''' 1:30pm-2:30pm
    4 KB (667 words) - 21:52, 23 March 2016
  • {| border="1"
    818 B (121 words) - 14:26, 19 January 2018
  • ** Dial: 1 888 240 2560 (US or Canada only)
    1 KB (155 words) - 16:38, 27 March 2016
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    3 KB (415 words) - 11:10, 30 March 2016
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (507 words) - 16:51, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (610 words) - 12:38, 14 March 2017
  • ...f RAID 6 storage would run about $1,200 for the bare bone these days plus $1,800 for 6 2TB disks leading to a total of about $3,000. '''Checking the CDC Geometry''': Beni reports that 1 mm of plastic has been added to the inside of the CDC for structural reason
    4 KB (630 words) - 11:25, 31 March 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (575 words) - 17:11, 24 February 2017
  • ...However, a number of these are carried by the quarks themselves. In table 1 are given the quantum numbers of the three lightest quarks.<br> <td>u</td><td>1/3</td><td>2/3</td><td>1/2</td><td>0</td><td>1/2</td><td>+1/2</td>
    20 KB (3,637 words) - 10:47, 15 August 2019
  • <math> 8 \otimes 8 = 27 \oplus 10 \oplus 10 \oplus 8 \oplus 8 \oplus 1</math> <math> 1 \otimes 1 = 1</math>
    16 KB (2,745 words) - 22:25, 10 October 2011
  • ...p>, 2<sup>++</sup>, 3<sup>--</sup>, 3<sup>+-</sup>, 3<sup>++</sup>, .... (1) </center><br> 0<sup>--</sup>, 0<sup>+-</sup>, 1<sup>-+</sup>, 2<sup>+-</sup>, 3<sup>-+</sup>, .... (2)
    12 KB (2,141 words) - 11:13, 15 August 2019
  • '''Room:''' '''<font size="+1">CC F326-327</font>''' '''Time:''' 1:30pm-2:30pm
    5 KB (855 words) - 09:04, 3 December 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    7 KB (1,006 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (807 words) - 17:13, 24 February 2017
  • 1:30 pm EDT<br>
    1 KB (200 words) - 04:25, 1 April 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    6 KB (948 words) - 17:13, 24 February 2017
  • '''Non-standard time!''' The meeting will be at 1:30 pm in CEBAF Center F326/327
    3 KB (495 words) - 02:51, 1 April 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    991 B (131 words) - 17:12, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (761 words) - 17:13, 24 February 2017
  • 1:30 PM Wed 11-Nov-2009 CC F326 1:30 PM Wed 9-Dec-2009
    3 KB (408 words) - 17:13, 24 February 2017
  • Next Meeting: November 5, 2009 @ 1:30 a.m. resistors were mounted in Phase 1 stuffing before winding and were
    6 KB (991 words) - 17:13, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    6 KB (926 words) - 17:13, 24 February 2017
  • ...GeV/c<sup>2</sup> meson is produced which subsequently decays into a b<sub>1</sub> and &pi;. (Note: The plots on this page were made using rev. 5911 of ...rue distributions. There already exists a configuration file for the b<sub>1</sub>&pi; reaction for genr8 in the following location within the HAll-D so
    70 KB (10,360 words) - 17:40, 4 June 2013
  • ...y 2019, the UConn group replaced the remaining 7 bundles making up columns 1..42 with new upgraded bundles, made from fibers with higher photon yield ac ...with column 3 going into the first ADC/TDC channel, followed by columns 2,1, and after that 6,5,4, and so on. This pattern is taken care of in the tran
    17 KB (2,662 words) - 08:33, 21 September 2023
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    5 KB (667 words) - 17:04, 24 February 2017
  • ...stream of the dipole and rescaling the field there by some factor of order 1 such that the two focal planes cross in the region of the microscope. Now
    4 KB (578 words) - 17:10, 24 February 2017
  • <font size="+1">February 18 to 20, 2016 at Jefferson Lab</font> #* US or Canada: +1 408 740 7256 or
    9 KB (1,147 words) - 12:39, 14 March 2017
  • ...ob(), for ''true'' &pi;<sup>0</sup>'s it should be flat, uniform from 0 to 1.
    4 KB (540 words) - 12:39, 14 March 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (563 words) - 17:02, 24 February 2017
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    4 KB (543 words) - 16:51, 24 February 2017
  • Next Meeting: December 10, 2009 @ 1:30 a.m. 1. Causes and potential fixes for the production packages were discussed
    11 KB (1,796 words) - 16:53, 24 February 2017
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    962 B (133 words) - 17:12, 24 February 2017
  • #* Dial: 1 888 240 2560 (US or Canada only) ** Mark I. has tagged [https://github.com/JeffersonLab/sim-recon/releases/tag/1.10.0 a new version of sim-recon]
    9 KB (1,429 words) - 14:05, 21 March 2016
  • # Review [[GlueX Offline Meeting, December 1, 2009#Minutes|minutes from last meeting]]: all We reviewed the [[GlueX Offline Meeting, December 1, 2009#Minutes|minutes]] from last time. Elliott suggested that the coding c
    4 KB (658 words) - 11:36, 31 March 2015
  • ** +1-800-377-8846 : US ** +1-888-276-7715 : Canada
    2 KB (215 words) - 17:13, 24 February 2017
  • #* US or Canada: +1 408 740 7256 or #* US or Canada: +1 888 240 2560
    1,010 B (137 words) - 17:59, 10 March 2016

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)