Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • ** [[GlueX-Collaboration-May-2024 | May 2024 Meeting]] * [[Hall-D Weekly Meeting | GlueX Biweekly Meetings]]
    10 KB (1,163 words) - 10:53, 18 April 2024
  • May 2022 [[Tracking-5-12-2022|(12)]] May 2021 [[meetings-5-20-2021|(20)]]
    16 KB (1,785 words) - 16:56, 15 April 2023
  • * [[GlueX Software Meeting, May 6, 2024 | May 6, 2024]] * [[GlueX Software Meeting, April 22, 2024 | April 22, 2024]]
    21 KB (1,819 words) - 10:07, 3 May 2024
  • ...of Zoom meetings on the private Wiki] and select the GlueX/Hall D Biweekly Meeting link at the top of the list. == Meeting Agendas and Notes ==
    4 KB (435 words) - 11:27, 1 May 2024
  • == Meeting Time and Place == The meeting will be on Wednesday April 30, 2014 at 11:15am EDT.
    2 KB (249 words) - 10:51, 31 March 2015
  • ** We held our first controls meeting, see [http://www.jlab.org/Hall-D/software/wiki/index.php/Controls Controls * Review of minutes from [[OWG Meeting 13-Apr-2011 | 13-Apr-2011]] meeting
    5 KB (852 words) - 17:54, 31 March 2015
  • ...DB/0007/000784/001/SiPM-Status-200703.pdf Zisis talk] at the collaboration meeting (p 5, 1x1 mm<sup>2</sup> SiPM ...r 2 larger PDE. We have heard that CPTA technology is primitive, and that may be so, but then it should not be difficult to reproduce their performance i
    4 KB (617 words) - 12:39, 14 March 2017
  • # Review minutes from [[April 17, 2007 Software]] meeting # Software/Calorimetry meeting schedule
    3 KB (474 words) - 17:13, 24 February 2017
  • * [[May 2007 PID Workshop]] ** [[Neutral Particle PID May 2007]]
    4 KB (536 words) - 12:39, 14 March 2017
  • # Review minutes from [[May 1, 2007 Software]] meeting We ''may'' have a VRVS connection depending if the equipment is in good working orde
    4 KB (725 words) - 17:13, 24 February 2017
  • This meeting page is retained as an historical record. ...ting in January, 2022 there is a [[Tagged Beam Group Biweekly Meetings|new meeting page]].
    3 KB (435 words) - 06:50, 19 January 2022
  • === [[GlueX Offline Meeting, June 15, 2010|June 15, 2010]] === # Bring up DAQ software release method at an online meeting. -> Elliott
    2 KB (295 words) - 17:51, 29 November 2019
  • ...g/wiki/index.php/Run_Coordination_Meetings:_Fall_2015_Run run coordination meeting pages]) ...sioning. Meanwhile, we may parasitically conduct tagger detector tests. We may also have the beam available, typically during the night, to conduct our ow
    14 KB (2,187 words) - 16:28, 26 November 2018
  • ''<font color=red>Meeting Time: 11:00 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    5 KB (708 words) - 12:38, 14 March 2017
  • ...te? Concept by Regina/JLav Engineers. A supporting (honeycomb-type) frame may be needed to keep the SiPMs against the BCAL; spring loaded pressure action ** Jan 31: At the collaboration meeting the question was raised as to whether Peltier junctions could (should?) be
    6 KB (894 words) - 12:38, 14 March 2017
  • *[[Tracking-5-12-2022| May 12]] May 2021 [[meetings-5-20-2021|(20)]]
    15 KB (1,677 words) - 16:13, 30 March 2023
  • * Winter 2024 Meeting [[GlueX-Collaboration-Feb-2024 |Collaboration Meeting]]
    8 KB (752 words) - 11:10, 17 April 2024
  • * The meeting will be held at 10:00 EST (9:00 CST) #* ''Reviewers'': Two reviewers are in the process of being contacted. There may be a third. The 12 GeV management will send them the terms of reference.
    4 KB (603 words) - 17:00, 24 February 2017
  • The meeting will be at 11:00am in Cebaf Center F324-325. We will attempt an ESNet connection for this meeting using the following number:
    8 KB (1,388 words) - 12:38, 14 March 2017
  • System & Integration Review - 7-9 May 2008 [http://www.jlab.org/Hall-D/software/wiki/index.php/Subsystem_Review R > [[F1TDC-V2 Meetings|F1TDC-V2 Meeting Minutes]]
    10 KB (1,242 words) - 10:59, 20 December 2019
  • The May 2008 Hall D Subsystem Review will cover all aspects of Hall D that have not Current planning is for a 1 1/2 day meeting the week of 7-May, with no parallel sessions. This will be a combined Hall D and Hall B revi
    7 KB (978 words) - 12:39, 14 March 2017
  • == GlueX Collaboration Meeting == May 8, 9 an 10, 2008 at Jefferson Lab
    5 KB (586 words) - 12:40, 14 March 2017
  • * The meeting will be held at 10:30 am ET # [[GlueX-Collaboration-May-2008#Friday May 9, 2008 | Collaboration meeting]] On the schedule we have 1:15 min (what do we want to report? who?)
    3 KB (385 words) - 17:12, 24 February 2017
  • * May 2008 Collaboration Meeting ...ontent in the three attachments below was presented by the Athens group on May 5, 2008.
    4 KB (503 words) - 13:25, 6 December 2017
  • ...ing.ppt my talk on Tagging Near the Endpoint at the May 2008 collaboration meeting], the Hall D tagger acceptance extends up to 11.7 GeV. Right now we are mo ...h each, so the actual standard deviation is more like 4-5 MeV. However we may have trouble proving that we can calibrate the absolute energy in the micro
    9 KB (1,425 words) - 12:39, 14 March 2017
  • * The meeting will be held at 10:30 am ET # Previous minutes: [[May 5, 2008 Calorimetry]]
    1 KB (159 words) - 17:11, 24 February 2017
  • FDC Weekly Meeting Date: May 29, 2008
    15 KB (2,462 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: June 19, 2008 @ 1:30 p.m.
    8 KB (1,388 words) - 17:13, 24 February 2017
  • * [https://april.aps.org/ APS April Meeting], Sacramento, CA and Virtual, 3-6 April 2024 ...vanced Tools for Hadron Spectroscopy (PWA13/ATHOS8)], Williamsburg, VA, 28 May - 1 June 2024
    42 KB (5,494 words) - 09:48, 23 April 2024
  • FDC Weekly Meeting Next Meeting: July 3, 2008 @ 1:30 p.m.
    10 KB (1,617 words) - 17:13, 24 February 2017
  • * The meeting will be held at 10:30 am ET ...Matt indicated that fits to the multiple layers and position determination may not have been used in these studies. In any case, the optimal algorithms to
    7 KB (1,029 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: July 17, 2008 @ 1:30 p.m.
    12 KB (1,986 words) - 17:00, 24 February 2017
  • FDC Weekly Meeting Next Meeting: July 24, 2008 @ 1:30 p.m.
    13 KB (2,200 words) - 17:12, 24 February 2017
  • * The meeting will be held at 10:30 am ET #** Elton: Optimum granuarity for SiPMs may be closer to 4x4 (instead of 6x4). George agreed, indicating simulation of
    8 KB (1,223 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: July 31, 2008 @ 1:30 p.m.
    17 KB (2,825 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: August 14, 2008 @ 1:30 p.m.
    19 KB (3,165 words) - 17:13, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    13 KB (1,745 words) - 12:39, 14 March 2017
  • FDC Weekly Meeting Next Meeting: August 28, 2008 @ 1:30 p.m.
    16 KB (2,702 words) - 17:14, 24 February 2017
  • FDC Weekly Meeting Next Meeting: September 11, 2008 @ 1:30 p.m.
    13 KB (2,115 words) - 17:12, 24 February 2017
  • FDC Weekly Meeting Next Meeting: September 25, 2008 @ 1:30 p.m.
    14 KB (2,272 words) - 17:12, 24 February 2017
  • ...d that when we lift the middle magnet yoke plate off the vacuum chamber we may have difficulties. He recommended foreseeing some jacks to help at the star ...the pair spectrometer vacuum chamber top and bottom plates from iron. This may be cheaper than bolting plates onto the pole and will reduce the pole gap.
    10 KB (1,378 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: October 2, 2008 @ 1:30 p.m.
    17 KB (2,787 words) - 17:14, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    7 KB (948 words) - 12:40, 14 March 2017
  • == GlueX Collaboration Meeting == <font size="+1">May 11, 12 and 13, 2009 at Jefferson Lab CC F326</font>
    8 KB (1,006 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: October 9, 2008 @ 1:30 p.m.
    13 KB (2,198 words) - 16:53, 24 February 2017
  • FDC Weekly Meeting Next Meeting: October 16, 2008 @ 1:30 p.m.
    12 KB (1,907 words) - 16:53, 24 February 2017
  • FDC Weekly Meeting Next Meeting: October 23, 2008 @ 1:30 p.m.
    12 KB (2,060 words) - 17:12, 24 February 2017
  • ...ew of minutes from [[OWG meeting 3-Oct-2008 | 3-Oct-2008]] meeting (29-Oct meeting was canceled) * Report from EPICS collaboration meeting (Padua) and PCaPAC conference (Ljubljana) (see [https://halldweb.jlab.org/d
    5 KB (841 words) - 17:14, 24 February 2017
  • !width="450"| Meeting ...ttp://www.aps.org/meetings/april/index.cfm American Physical Society April Meeting] || Salt Lake City, UT, 2016 April 16-19 || Matthew&nbsp;Shepherd || [https
    14 KB (1,602 words) - 17:13, 24 February 2017
  • =Items for followup from Feb 19 meeting= #* Blake was not available and no simulation meeting this week.
    5 KB (711 words) - 17:13, 24 February 2017
  • ...ideo present a quick overview of the history of GlueX going from the first meeting in summer 1997 until the present. This is the first of a series of informat ...The plots are based on the production of mesons and baryons, both of which may subsequently decay. The plots discussed are the Chew-Low plot, the Dalitz p
    10 KB (1,511 words) - 14:42, 15 October 2023
  • ...ork with the Hall D group leader to arrange the best time. Middle to late May is currently being considered. Tim is going to draft a charge for the revi ...ed background estimates for the microscope counters. As shown at the last meeting, the updated backgrounds in the fixed array vary from 10% of the signal rat
    7 KB (1,115 words) - 12:39, 14 March 2017
  • FDC Weekly Meeting Next Meeting: April 2, 2009 @ 1:30 p.m.
    9 KB (1,451 words) - 17:13, 24 February 2017
  • =Items for followup from previous meeting= ...formal discussions on various cooling concepts to be presented at the next meeting.[http://www.jlab.org/~huttonc/siPM_layout.ppt cooling}
    7 KB (1,067 words) - 16:52, 24 February 2017
  • FDC Weekly Meeting Next Meeting: April 9, 2009 @ 1:30 p.m.
    9 KB (1,392 words) - 17:13, 24 February 2017
  • =Items for followup from previous meeting(s)= ...ng [http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX-Collaboration-May-2009]
    7 KB (1,076 words) - 17:14, 24 February 2017
  • FDC Weekly Meeting Next Meeting: April 16, 2009 @ 1:30 p.m.
    8 KB (1,362 words) - 17:14, 24 February 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    7 KB (1,131 words) - 17:13, 24 February 2017
  • * [[GlueX TOF Meeting, May 4, 2022|May 4, 2022]] * [[GlueX TOF Meeting, April 6, 2022|April 6, 2022]]
    15 KB (1,378 words) - 11:34, 21 April 2022
  • FDC Weekly Meeting Next Meeting: April 23, 2009 @ 1:30 p.m.
    9 KB (1,520 words) - 17:12, 24 February 2017
  • =Items for followup from previous meeting(s)= ...ollaboration-May-2009]] Suggested list to be refined at next working group meeting
    5 KB (768 words) - 17:12, 24 February 2017
  • FDC Weekly Meeting Next Meeting: May 7, 2009 @ 1:30 p.m. (Note: No meeting next week)
    10 KB (1,597 words) - 17:14, 24 February 2017
  • Friday, May 1, 2009<br> ...p://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavev2a2aDIDaiIt direct meeting link]<br>
    1 KB (182 words) - 12:39, 14 March 2017
  • FDC Weekly Meeting Date: May 7, 2009
    12 KB (1,957 words) - 17:12, 24 February 2017
  • FDC Weekly Meeting Date: May 14, 2009
    11 KB (1,922 words) - 17:13, 24 February 2017
  • =Items for followup from previous meeting= ...tion is nominally 350k more expensive, but assumed $0.4k/SiPM. The balance may change if the SiPMs are more expensive than this initial estimate. Therefor
    4 KB (643 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Date: May 21, 2009
    8 KB (1,406 words) - 17:13, 24 February 2017
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, December 1, 2015#Minutes|minutes from December 1]]
    2 KB (312 words) - 17:08, 13 January 2016
  • FDC Weekly Meeting Date: May 28, 2009
    10 KB (1,597 words) - 17:13, 24 February 2017
  • =Items for followup from previous meeting= ...e produced (over a 1 cm impact position) at the center of the module. This may limit the range of energies deposited in each cell. We requested a 2 GeV, 2
    5 KB (684 words) - 17:05, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    10 KB (1,422 words) - 12:39, 14 March 2017
  • The meeting will be at 2:00 pm in CEBAF Center F326/327. ...ttp://evo.caltech.edu/evoGate/koala.jnlp?meeting=eIe9esvDvBaIanatII direct meeting link]
    4 KB (606 words) - 10:34, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday March 30, 2016 at 11:15am EDT.
    3 KB (415 words) - 11:10, 30 March 2016
  • ...om the time you get occupation of the room if you are the organizer of the meeting.
    3 KB (463 words) - 14:26, 11 January 2022
  • =Items for followup from previous meeting= ...to check and experiment with surface treatment to study reflection losses. May wish to split shipment of prototypes for tests at JLab and USM.
    5 KB (807 words) - 17:13, 24 February 2017
  • =Items for followup from previous meeting(s)= ##* Purchase new FEU-84-3 pmts. This may require starting up an old production line, and there are differing opinion
    6 KB (948 words) - 17:13, 24 February 2017
  • ...ttp://evo.caltech.edu/evoGate/koala.jnlp?meeting=eueneevlv2aua2avIu direct meeting link]<br> ...ht/Start-Counter Meeting, October 16, 2009#Minutes | Minutes from the last meeting]]
    5 KB (799 words) - 07:10, 1 April 2015
  • The meeting will be at 2:00 pm in CEBAF Center F326/7 ...ttp://evo.caltech.edu/evoGate/koala.jnlp?meeting=eBele2vnveasaMaMIB direct meeting link]
    3 KB (482 words) - 23:31, 31 March 2015
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    9 KB (1,147 words) - 12:39, 14 March 2017
  • FDC Weekly Meeting Next Meeting: December 10, 2009 @ 1:30 a.m.
    11 KB (1,796 words) - 16:53, 24 February 2017
  • GlueX Offline Software Meeting<br> ...[[GlueX Offline Meeting, September 20, 2017#Minutes|minutes from the last meeting]] (all)
    7 KB (1,131 words) - 13:21, 5 October 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    9 KB (1,429 words) - 14:05, 21 March 2016
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    8 KB (1,070 words) - 12:40, 14 March 2017
  • FDC Weekly Meeting Next Meeting: January 14, 2010
    11 KB (1,872 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: January 21, 2010
    8 KB (1,282 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: February 4, 2010
    7 KB (1,164 words) - 17:13, 24 February 2017
  • ..."Physics Results from the First GlueX Runs"] <p> '' SURA Board of Trustees Meeting, April 2018''</p> ...eX Experiment"] <p>''American Physical Society Division of Nuclear Physics Meeting, Baltimore, MD - April 2015''</p>
    9 KB (1,307 words) - 14:51, 5 February 2024
  • =Items for followup from previous meeting(s)= #*# Evaluation of proposals ~ May
    6 KB (815 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: February 18, 2010
    9 KB (1,463 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: February 25, 2010
    9 KB (1,562 words) - 17:13, 24 February 2017
  • FDC Weekly Meeting Next Meeting: March 4, 2010
    7 KB (1,200 words) - 17:13, 24 February 2017
  • == GlueX Collaboration Meeting == <font size="+1">May 10, 11 and 12, 2010 at Jefferson Lab</font>
    12 KB (1,580 words) - 12:40, 14 March 2017
  • == Meeting Time and Place == The meeting will be on Monday April 18, 2016 at 11:30am EDT.
    2 KB (230 words) - 12:39, 14 March 2017
  • * Report to GlueX meeting (2010/05/10): [https://halldweb.jlab.org/DocDB/0014/001496/001/SiPM_Test_M * Fraction of recovery to total damage may also be temperature dependent, to check it:
    23 KB (3,430 words) - 12:38, 14 March 2017
  • FDC Weekly Meeting Next Meeting: March 18, 2010
    7 KB (1,129 words) - 17:12, 24 February 2017
  • GlueX Offline Meeting<br> ...ttp://evo.caltech.edu/evoGate/koala.jnlp?meeting=eBele2vnveasaMaMIB direct meeting link]
    6 KB (943 words) - 23:31, 31 March 2015
  • March 25, 2010 FDC meeting ...expected to be compatible if not bigger than 30%. The only procedure that may be considered if possible, is sorting the ASICs before putting them on the
    9 KB (1,384 words) - 17:14, 24 February 2017
  • == PAC36 Meeting== It may turn out that we need more for the physics part.
    4 KB (553 words) - 16:44, 24 February 2017
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    3 KB (509 words) - 17:13, 24 February 2017
  • =Items for followup from previous meeting(s)= # [[GlueX-Collaboration-May-2010]]
    3 KB (412 words) - 16:50, 24 February 2017
  • GlueX Offline Meeting<br> ** Meeting URL: http://evo.caltech.edu/evoGate/koala.jnlp?meeting=eleBevvlvDatasaeIl
    4 KB (712 words) - 06:05, 1 April 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    7 KB (1,134 words) - 12:38, 14 March 2017
  • GlueX Offline Meeting<br> Tuesday, May 4, 2010<br>
    5 KB (779 words) - 02:07, 1 April 2015
  • =Items for followup from previous meeting= #* Made prototype light guide with new CNC machine (shown at previous meeting)
    4 KB (649 words) - 16:52, 24 February 2017
  • GlueX Start Counter Meeting<br> ...[GlueX Start Counter Meeting, March 24, 2016#Minutes|minutes from the last meeting]]
    3 KB (502 words) - 14:09, 21 April 2016
  • GlueX Offline Meeting<br> Tuesday, May 18, 2010<br>
    7 KB (1,122 words) - 17:11, 24 February 2017
  • =Items for followup from previous meeting= #* Elton will be absent, so Zisis will run the next meeting,
    7 KB (1,052 words) - 17:12, 24 February 2017
  • #* [[Media:Gasparian GlueX Phys meeting May 24 2010.ppt|Eta Resolutions]] - Ashot
    723 B (95 words) - 17:12, 24 February 2017
  • Friday, May 28, 2010<br> ...ttp://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link]<br>
    5 KB (827 words) - 23:40, 31 March 2015
  • GlueX Offline Meeting<br> ** Meeting URL: http://evo.caltech.edu/evoGate/koala.jnlp?meeting=eleBevvlvDatasaeIl
    8 KB (1,316 words) - 16:44, 24 February 2017
  • ...ttp://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link (good through 8/20)]<br> # [[GlueX PID Meeting, May 28, 2010#Minutes|Minutes from the last meeting]]
    4 KB (670 words) - 00:26, 1 April 2015
  • GlueX Offline Meeting<br> ** Meeting URL: http://evo.caltech.edu/evoGate/koala.jnlp?meeting=eleBevvlvDatasaeIl
    4 KB (593 words) - 06:29, 1 April 2015
  • GlueX Offline Software Meeting<br> ## [[GlueX-Collaboration-May-2016|Collaboration Meeting]] May 9-11, 2016
    7 KB (941 words) - 17:00, 24 February 2017
  • === [[GlueX Offline Meeting, May 18, 2010|May 18, 2010]] === === [[GlueX Offline Meeting, May 4, 2010|May 4, 2010]] ===
    17 KB (2,687 words) - 17:13, 24 February 2017
  • === [[GlueX Offline Meeting, May 4, 2010|May 4, 2010]] === ...ith Eugene to discuss database work.</s><ref>David, Mark and Eugene met on May 18, 2010. We decided to to write Dmitri and let him know about the specific
    16 KB (2,575 words) - 09:24, 16 July 2019
  • ''<font color=red>Meeting Time: 11:00 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    5 KB (755 words) - 17:13, 24 February 2017
  • GlueX Offline Meeting<br> ** Meeting URL: http://evo.caltech.edu/evoGate/koala.jnlp?meeting=eleBevvlvDatasaeIl
    3 KB (470 words) - 11:22, 31 March 2015
  • ...ttp://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvavnaDaiasIa direct meeting link]<ref>This link is good through 8/20</ref><br> # [[GlueX PID Meeting, June 11, 2010#Minutes|Minutes from the last meeting]]
    4 KB (621 words) - 11:35, 31 March 2015
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    12 KB (1,612 words) - 12:38, 14 March 2017
  • No meeting ## Hall D can ask for beam (beam on now), but may be taken away for extraction work
    4 KB (595 words) - 23:00, 6 April 2016
  • ...MCC tuning beam in the Hall. Rebooting solved the problem. More shielding may be required. === 2010 May 4 ===
    15 KB (2,179 words) - 12:39, 14 March 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    9 KB (1,174 words) - 12:39, 14 March 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    9 KB (1,102 words) - 12:40, 14 March 2017
  • =Items for followup from previous meeting= ...s between JLab and Chile. This will be discussed when Hamamatsu visits. We may wish to include Will (USM) in a phone conference while they are here.
    7 KB (1,051 words) - 17:12, 24 February 2017
  • GlueX Offline Software Meeting<br> ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=e8eteDvnveaBaDa9I8 <!--good through Jan. 12-->
    4 KB (601 words) - 16:44, 24 February 2017
  • * [[GlueX Start Counter Meeting, February 1, 2024|February 1, 2024]] * [[GlueX Start Counter Meeting, December 4, 2023|December 4, 2023]]
    13 KB (1,174 words) - 09:06, 23 January 2024
  • ...ailman.jlab.org/pipermail/halld-cal/2010-December/000292.html Elton] and [[May 27, 2010 Calorimetry]].] ## This discussion is mature enough to move to the Thursday December 9 CALWG meeting.
    5 KB (817 words) - 17:12, 24 February 2017
  • * [[May 9, 2013 SiPM Electrical and Cooling]] * [[May 2, 2013 SiPM Electrical and Cooling]]
    4 KB (435 words) - 12:04, 3 May 2013
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, December 1, 2010#Minutes|minutes from the last meeting]]: all
    5 KB (810 words) - 17:04, 24 February 2017
  • * [[GlueX Target Meeting, June 24, 2014|June 24, 2014]] * [[GlueX Target Meeting, May 22, 2014|May 22, 2014]]
    2 KB (173 words) - 12:31, 24 June 2014
  • GlueX Offline Software Meeting<br> #* [[GlueX-Collaboration-Jan-2011|Collaboration Meeting]] Offline Agenda
    5 KB (746 words) - 23:18, 31 March 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    6 KB (936 words) - 17:06, 24 February 2017
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, January 26, 2011#Minutes|minutes from the last meeting]]: all
    7 KB (1,124 words) - 18:23, 31 March 2015
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    10 KB (1,269 words) - 12:39, 14 March 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (833 words) - 17:12, 24 February 2017
  • =GlueX Collaboration Meeting Logistics= The spring 2011 meeting will be held May 9-11 at Indiana University.
    11 KB (1,384 words) - 17:13, 24 February 2017
  • # [[GlueX TOF Meeting, January 21, 2011#Minutes|Minutes from the last meeting]] # Meeting time OK?
    5 KB (732 words) - 17:14, 24 February 2017
  • * [https://www.jlab.org/jluo2023/ 2023 JLUO Annual Meeting], Jefferson Lab, 26-28 June 2023 ...doc-private/DocDB/ShowDocument?docid=5973 Hall D update at JLUO Satellite Meeting], presented by N. Dene Hoffman
    77 KB (10,281 words) - 10:24, 23 April 2024
  • GlueX Offline Software Meeting<br> ...f [[GlueX Offline Meeting, February 23, 2011#Minutes|minutes from the last meeting]]: all
    5 KB (768 words) - 11:36, 31 March 2015
  • ...iew [[GlueX Target Meeting, January 18, 2011#Minutes|minutes from previous meeting]]: all No video conferencing for this meeting
    2 KB (328 words) - 06:35, 1 April 2015
  • # [[GlueX TOF Meeting, March 4, 2011#Minutes|Minutes from the last meeting]] ...ttp://evo.caltech.edu/evoNext/koala.jnlp?meeting=eIe9esvuv2a9atatII direct meeting link] <!-- This link is good through 4/29/2011 -->
    4 KB (656 words) - 17:13, 24 February 2017
  • ...[GlueX Start Counter Meeting, March 10, 2011#Minutes|minutes from previous meeting]]: all ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=M2MvMB2e28DMDs9v9lDM92
    2 KB (314 words) - 20:46, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (771 words) - 17:02, 24 February 2017
  • =Meeting Info= * Review action items from previous meeting
    5 KB (789 words) - 17:08, 24 February 2017
  • ...[GlueX Start Counter Meeting, March 25, 2011#Minutes|minutes from previous meeting]]: all ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvlv8a9asasIa <!--good through June 2-->
    3 KB (416 words) - 23:53, 31 March 2015
  • # Review [[GlueX Target Meeting, March 10, 2011#Minutes|minutes from previous meeting]]: all ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=vsvivIe8eIItIvasatItas
    3 KB (430 words) - 22:43, 31 March 2015
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, April 6, 2011#Minutes|minutes from the last meeting]]: all
    7 KB (1,021 words) - 00:30, 1 April 2015
  • April 28, 2011 FDC meeting # Other: talks at the collaboration meeting
    4 KB (704 words) - 16:48, 24 February 2017
  • Tuesday, May 17, 2011<br> # Review [[GlueX Target Meeting, April 12, 2011#Minutes|minutes from previous meeting]]: all
    4 KB (564 words) - 20:36, 31 March 2015
  • GlueX Offline Software Meeting<br> Wednesday, May 18, 2011<br>
    4 KB (685 words) - 11:34, 31 March 2015
  • =Meeting Info= ...des prepared by David starting with a review of action items from the last meeting. Items discussed:
    6 KB (911 words) - 17:12, 24 February 2017
  • Friday, May 26, 2011<br> # [[GlueX TOF Meeting, April 29, 2011#Minutes|Minutes from the last meeting]]
    3 KB (549 words) - 17:12, 24 February 2017
  • GlueX Offline Software Meeting<br> ...iew of [[GlueX Offline Meeting, May 18, 2011#Minutes|minutes from the last meeting]]: all
    6 KB (1,003 words) - 17:23, 31 March 2015
  • ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin) =Items for followup from previous meeting=
    5 KB (774 words) - 17:00, 24 February 2017
  • ...[GlueX Start Counter Meeting, April 21, 2011#Minutes|minutes from previous meeting]]: all ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eaeDetvlv8a9asasIa <!--good through June 2-->
    4 KB (598 words) - 23:18, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (902 words) - 17:12, 24 February 2017
  • Thursday, May 23, 2011<br> # [[GlueX TOF Meeting, May 27, 2011#Minutes|Minutes from the last meeting]]
    5 KB (810 words) - 17:05, 24 February 2017
  • # Review [[GlueX Target Meeting, May 17, 2011#Minutes|minutes from previous meeting]]: all We spent most of the meeting reviewing various aspects of [https://halldweb.jlab.org/talks/2011-3Q/Hall%
    2 KB (328 words) - 01:50, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    7 KB (1,058 words) - 17:13, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    4 KB (588 words) - 11:33, 31 March 2015
  • ...[[GlueX Start Counter Meeting, June 30, 2011#Minutes|minutes from previous meeting]]: all ** Meeting URL: http://evo.caltech.edu/evoNext/koala.jnlp?meeting=292I2iMeMB9M9nDD9aD9 <!--good through November 3-->
    4 KB (614 words) - 23:47, 31 March 2015
  • =Meeting Info= == Review action items from previous meeting ==
    8 KB (1,351 words) - 16:48, 24 February 2017
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, July 27, 2011#Minutes|minutes from the last meeting]]: all
    4 KB (589 words) - 20:27, 31 March 2015
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, August 24, 2011#Minutes|minutes from the last meeting]]: all
    5 KB (796 words) - 17:12, 24 February 2017
  • GlueX Start Counter Meeting<br> ...lueX Start Counter Meeting, January 28, 2016#Minutes|minutes from the last meeting]]
    4 KB (642 words) - 17:00, 24 February 2017
  • ** GlueX collaboration meeting 6-8 Oct * Minutes from previous meeting [[Controls_Meeting_11-Aug-2011|11-Aug-2011]]
    5 KB (840 words) - 10:35, 31 March 2015
  • * Review of minutes from [[OWG_Meeting_31-Aug-2011 | 31-Aug-2011]] meeting * Talks at the [[GlueX-Collaboration-Sep-2011|collaboration meeting]]
    7 KB (1,102 words) - 01:01, 1 April 2015
  • # [[GlueX TOF Meeting, September 1, 2011#Minutes|Minutes from the last meeting]] ...p://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBvea8aDIDaiIt direct meeting link] <!-- This link is good through 11/24/2011 -->
    6 KB (1,018 words) - 17:12, 24 February 2017
  • =Meeting Info= == Review action items from previous meeting ==
    2 KB (392 words) - 17:01, 24 February 2017
  • GlueX Offline Software Meeting<br> ...f [[GlueX Offline Meeting, September 7, 2011#Minutes|minutes from the last meeting]]: all
    6 KB (853 words) - 13:36, 31 March 2015
  • ** GlueX collaboration meeting 6-8 Oct ** Vardan will talk on "farm manager" at 28-Sep Online meeting
    3 KB (572 words) - 11:03, 31 March 2015
  • * Review of minutes from [[OWG_Meeting_14-Sep-2011 | 14-Sep-2011]] meeting * [[GlueX-Collaboration-Sep-2011 | Online agenda for GlueX collaboration meeting]] - Hovanes, Sasha
    5 KB (869 words) - 18:58, 31 March 2015
  • # [[GlueX TOF Meeting, September 15, 2011#Minutes|Minutes from the last meeting]] ...p://evo.caltech.edu/evoNext/koala.jnlp?meeting=ete8eavBvea8aDIDaiIt direct meeting link] <!-- This link is good through 11/24/2011 -->
    5 KB (753 words) - 17:14, 24 February 2017
  • *[[Beam Test Meeting Mon. May. 28, 2012|Monday May 28]] *[[Beam Test Meeting Mon. May. 21, 2012|Monday May 21]]
    6 KB (865 words) - 12:39, 14 March 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (980 words) - 17:14, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ...bligations. Zisis should be able to put a M.Sc. student on the project in May or June.
    4 KB (697 words) - 17:13, 24 February 2017
  • GlueX Start Counter Meeting<br> ...lueX Start Counter Meeting, November 3, 2011#Minutes|minutes from previous meeting]]
    3 KB (554 words) - 04:15, 1 April 2015
  • ** April 3 - May 4: physics beam, installation when possible Slides are from Mike's presentation at ASU group meeting on February 11 2015.
    6 KB (877 words) - 16:30, 6 September 2019
  • ...run and a sampling of the results were shown at the May 2009 collaboration meeting in [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-5-2009/diamonds-5-20
    2 KB (357 words) - 18:06, 29 November 2011
  • ...ampling of the results were presented at the May, 2011 GlueX collaboration meeting in [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-5-2011/diamonds-5-20 .../1Jf_RO_obyyxalbCZqNqvCZDuHHSSfoRSuBLBPRVzqK0/edit Electronic logbook from May, 2011 CHESS run]
    3 KB (435 words) - 18:11, 29 November 2011
  • * [[May 2008 Subsystem Review | Subsystems Review, JLab, May 2008]] * [[Electronics Trigger Meetings|Trigger Meeting Minutes]]
    4 KB (510 words) - 17:24, 30 July 2018
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    10 KB (1,216 words) - 12:38, 14 March 2017
  • == GlueX Collaboration Meeting == <font size="+1">May 21 to 23, 2012 at Jefferson Lab</font>
    10 KB (1,238 words) - 12:38, 14 March 2017
  • # [[GlueX TOF Meeting, December 12, 2011#Minutes|Minutes from the last meeting]] ...p://evo.caltech.edu/evoNext/koala.jnlp?meeting=292I2iMeMn9u9nDM9aD9 direct meeting link] <!-- This link is for 12/10 only -->
    2 KB (240 words) - 23:18, 31 March 2015
  • |width="140" | [[BLTWG Meeting 01/10/2011|January 10, 2011]] |width="140" | [[BLTWG Meeting 01/24/2011|January 24, 2011]]
    5 KB (670 words) - 11:14, 9 January 2012
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=1897 January 26 IT Committee Meeting] (See the last slide on the review.) ===SRP Meeting on May 14, 2012===
    14 KB (1,875 words) - 17:12, 24 February 2017
  • January 19, 2012 FDC meeting ..., but Cody would know this better. Chris just finished testing (during the meeting) 32 flat cables to be used between the translator boards and the TDCs for t
    4 KB (651 words) - 17:51, 19 January 2012
  • ** ''Should coordinate in this meeting with electronics, trigger, DAQ, monitoring and controls efforts'' ** No meeting in two weeks due to collaboration meeting
    5 KB (719 words) - 06:20, 1 April 2015
  • GlueX Offline Software Meeting<br> ...f [[GlueX Offline Meeting, December 14, 2011#Minutes|minutes from the last meeting]]: all
    7 KB (1,072 words) - 00:14, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    6 KB (962 words) - 10:37, 31 March 2015
  • * [[2012 Software Review Planning Meeting: Jan. 20, 2012|Previous Meeting (Jan. 20, 2012)]] ...ainstorming session Rolf organized with all 4 halls on Wed. 1/25/2012. The meeting focused
    4 KB (683 words) - 18:03, 1 February 2012
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    7 KB (930 words) - 16:58, 24 February 2017
  • * [[2012 Software Review Planning Meeting: Feb. 3, 2012|Previous Meeting (Feb. 3, 2012)]] David reminded everyone of what he reported a the the bi-weekly collab. meeting earlier in the week. Specifically, that he spoke briefly with Chip and enco
    3 KB (432 words) - 12:34, 31 March 2015
  • # May 2, 2012 at Jefferson Lab [[GlueX-Upgrade-May-2012|Upgrade Meeting]]
    104 B (10 words) - 10:18, 13 February 2012
  • == GlueX Upgrade Meeting == <font size="+1">May 2, 2012 at Jefferson Lab</font>
    3 KB (441 words) - 17:07, 24 February 2017
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, February 8, 2012#Minutes|minutes from the last meeting]]: all
    6 KB (956 words) - 13:04, 31 March 2015
  • GlueX Start Counter Meeting<br> ...GlueX Start Counter Meeting, January 9, 2014#Minutes|minutes from previous meeting]]
    4 KB (668 words) - 00:43, 1 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday March 21, 2012 at 11:00am EDT.
    3 KB (316 words) - 10:06, 21 March 2012
  • * [[2012 Software Review Planning Meeting: Feb. 24, 2012|Previous Meeting (Feb. 24, 2012)]] *** "Software Review Preparation" meeting today at 3pm in A110 (ReadyTalk participant code 7022780#)
    5 KB (849 words) - 14:25, 31 March 2015
  • * [[2012 Software Review Planning Meeting: Mar. 9, 2012|Previous Meeting (Mar. 9, 2012)]] ** Meeting with all halls and Rolf Ent on 3/14/2012
    7 KB (1,025 words) - 16:54, 24 February 2017
  • At Jefferson Lab, the meeting will be held in room ARC 231 ** Open House May 19, - Volunteers?
    604 B (85 words) - 09:35, 23 March 2012
  • == Meeting Time and Place == The meeting will be on Wednesday April 4, 2012 at 11:00am EDT.
    3 KB (313 words) - 11:09, 4 April 2012
  • GlueX Offline Software Meeting<br> ...w of [[GlueX Offline Meeting, March 21, 2012#Minutes|minutes from the last meeting]]: all
    4 KB (676 words) - 11:36, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday April 18, 2012 at 11:00am EDT.
    3 KB (347 words) - 17:04, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday May 16, 2012 at 11:00am EDT.
    3 KB (348 words) - 11:51, 16 May 2012
  • April 5, 2012 FDC meeting ...rings were installed today and we assembled the first cell right after the meeting. Dave wrote the procedures for the replacement of the O-rings, waiting now
    6 KB (1,063 words) - 18:53, 6 April 2012
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    4 KB (571 words) - 08:51, 25 April 2012
  • # [[2012 Software Review Planning Meeting: Apr. 6, 2012|Previous Meeting (Apr. 6, 2012)]] #* May 14/15 - First draft of presentations for dry run.
    5 KB (684 words) - 16:55, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    4 KB (661 words) - 18:02, 31 March 2015
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, April 4, 2012#Minutes|minutes from the last meeting]]: all
    6 KB (965 words) - 15:57, 31 March 2015
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, April 5, 2012#Minutes|minutes from previous meeting]]
    4 KB (635 words) - 22:50, 31 March 2015
  • # [[2012 Software Review Planning Meeting: Apr. 20, 2012|Previous Meeting (Apr. 20, 2012)]] #* '''May 1 - talk outlines'''
    6 KB (871 words) - 16:58, 24 February 2017
  • # Talks at the [[GlueX-Collaboration-Jun-2012|Collaboration Meeting]] May 21-23.
    696 B (96 words) - 12:16, 30 April 2012
  • == Meeting Time and Place == Monday May 7, 2012 at 11:30pm
    856 B (108 words) - 11:39, 7 May 2012
  • * Review of minutes from [[OWG_Meeting_25-Apr-2012 | 25-Apr-2012]] meeting * [[Media:Network_Monitoring_9-May-2012.pdf|Network monitoring at JLab]] - Bryan Hess
    5 KB (869 words) - 05:07, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    5 KB (849 words) - 23:59, 31 March 2015
  • GlueX Start Counter Meeting<br> Thursday, May 3, 2012<br>
    3 KB (558 words) - 06:35, 1 April 2015
  • # [[2012 Software Review Planning Meeting: Apr. 27, 2012|Previous Meeting (Apr. 27, 2012)]] #* <s>May 1 - talk outlines</s>
    6 KB (823 words) - 17:07, 24 February 2017
  • Thursday, May 10, 2012<br> # Review of [[GlueX TOF Meeting, April 12, 2012#Minutes|last TOF bi-weekly meeting]]
    3 KB (440 words) - 04:25, 1 April 2015
  • # Talks at the [[GlueX-Collaboration-Jun-2012|Collaboration Meeting]] May 21-23.
    680 B (96 words) - 11:52, 16 May 2012
  • GlueX Offline Software Meeting<br> Wednesday, May 16, 2012<br>
    5 KB (829 words) - 17:23, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    7 KB (1,092 words) - 23:59, 31 March 2015
  • GlueX Start Counter Meeting<br> Thursday, May 17, 2012<br>
    2 KB (381 words) - 17:00, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    8 KB (1,048 words) - 12:39, 14 March 2017
  • GlueX Offline Software Meeting<br> Wednesday, May 30, 2012<br>
    3 KB (395 words) - 17:04, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday May 30, 2012 at 11:00am EDT.
    3 KB (327 words) - 07:53, 30 May 2012
  • GlueX Start Counter Meeting<br> Thursday, May 31, 2012<br>
    4 KB (645 words) - 23:47, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    4 KB (667 words) - 16:01, 6 June 2012
  • # Review of [[GlueX TOF Meeting, May 10, 2012#Minutes|last TOF bi-weekly meeting]] #* [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eDeae8vvviavauI9aIID meeting link] <!-- This link is good through 12/11/2012 -->
    823 B (111 words) - 06:05, 1 April 2015
  • GlueX Offline Software Meeting<br> ...iew of [[GlueX Offline Meeting, May 30, 2012#Minutes|minutes from the last meeting]]: all
    3 KB (497 words) - 11:18, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday June 13, 2012 at 11:00am EDT.
    3 KB (323 words) - 09:18, 13 June 2012
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, May 31, 2012#Minutes|minutes from previous meeting]]
    825 B (110 words) - 20:46, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (832 words) - 01:50, 1 April 2015
  • # Review of [[GlueX TOF Meeting, May 10, 2012#Minutes|last TOF bi-weekly meeting]] #* [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eDeae8vvviavauI9aIID meeting link] <!-- This link is good through 12/11/2012 -->
    2 KB (299 words) - 23:03, 31 March 2015
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, May 31, 2012#Minutes|minutes from previous meeting]]
    3 KB (495 words) - 00:14, 1 April 2015
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, June 27, 2012#Minutes|minutes from the last meeting]]: all
    5 KB (747 words) - 17:04, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Monday July 16, 2012 at 1:30pm EDT.
    6 KB (895 words) - 16:58, 24 February 2017
  • # Review of [[GlueX TOF Meeting, June 21, 2012#Minutes|last TOF bi-weekly meeting]] #* [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=eDeae8vvviavauI9aIID meeting link] <!-- This link is good through 12/11/2012 -->
    2 KB (320 words) - 20:23, 31 March 2015
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    3 KB (498 words) - 14:22, 23 July 2012
  • GlueX TOF Meeting<br> # Review of [[GlueX TOF Meeting, July 19, 2012#Minutes|last TOF bi-weekly meeting]]
    3 KB (450 words) - 23:53, 31 March 2015
  • =Meeting Info.= == Meeting Time ==
    3 KB (418 words) - 11:35, 13 September 2012
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    5 KB (824 words) - 12:25, 4 September 2012
  • == Meeting Time and Place == The meeting will be on Monday August 27, 2012 at 1:30pm EDT.
    3 KB (534 words) - 11:26, 29 August 2012
  • GlueX TOF Meeting<br> # Review of [[GlueX TOF Meeting, August 16, 2012#Minutes|last TOF bi-weekly meeting]]
    3 KB (491 words) - 03:23, 1 April 2015
  • GlueX Data Challenge Meeting<br> * [[GlueX Data Challenge Meeting, August 27, 2012#Minutes|Minutes from last time]]
    3 KB (458 words) - 13:33, 12 September 2012
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    7 KB (1,160 words) - 17:04, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    7 KB (1,003 words) - 19:44, 31 March 2015
  • GlueX Offline Software Meeting<br> ...f [[GlueX Offline Meeting, September 5, 2012#Minutes|minutes from the last meeting]]: all
    5 KB (853 words) - 23:03, 31 March 2015
  • =Meeting Info.= == Meeting Time And Location ==
    2 KB (296 words) - 15:30, 14 November 2017
  • ...p://ekiga.org Ekiga] :Linux/Windows:is the product formerly known as Gnome Meeting. *: ''... we did some limited tests during the PID upgrade meeting and this application seemed to interface reasonably well with the conferenc
    5 KB (863 words) - 11:11, 8 January 2013
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    4 KB (598 words) - 15:59, 12 November 2012
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, October 31, 2012#Minutes|minutes from the last meeting]]: all
    7 KB (1,085 words) - 06:45, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    7 KB (1,211 words) - 08:40, 21 November 2012
  • GlueX Start Counter Meeting<br> ...ueX Start Counter Meeting, November 15, 2012#Minutes|minutes from previous meeting]]
    3 KB (488 words) - 14:52, 31 March 2015
  • ...e toll-free access to the gateway phone number (area code 510). The latter may be more useful for those who need a toll free number (including some intern # when asked, dial the meeting code: 8542553# (don't forget the "#" !)
    2 KB (319 words) - 11:01, 15 October 2013
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    4 KB (539 words) - 17:10, 24 February 2017
  • GlueX Data Challenge Meeting<br> # [[GlueX Data Challenge Meeting, December 3, 2012#Minutes|Minutes from last time]]
    6 KB (990 words) - 15:09, 18 December 2012
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    4 KB (573 words) - 18:37, 15 January 2013
  • |width="140"| [[BLTWG Meeting 01/09/2012|January 9, 2012]] |width="140"| [[BLTWG Meeting 01/23/2012|January 23, 2012]]
    5 KB (729 words) - 11:00, 7 January 2013
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    7 KB (1,021 words) - 06:42, 1 April 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    9 KB (1,509 words) - 19:08, 24 February 2016
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (933 words) - 17:11, 24 February 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    9 KB (1,108 words) - 12:38, 14 March 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    10 KB (1,265 words) - 12:39, 14 March 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    10 KB (1,327 words) - 12:38, 14 March 2017
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    3 KB (469 words) - 15:41, 15 February 2013
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, January 23, 2013#Minutes|minutes from the last meeting]]: all
    6 KB (878 words) - 11:15, 31 March 2015
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    3 KB (474 words) - 17:12, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    6 KB (865 words) - 17:13, 24 February 2017
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    2 KB (318 words) - 06:17, 1 April 2015
  • == Meeting Time and Place == ...SeeVogh meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 155025.
    2 KB (330 words) - 17:22, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> # None; this was the first Reconstruction Meeting in 2013
    2 KB (363 words) - 00:08, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (849 words) - 16:29, 26 March 2013
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, February 6, 2013#Minutes|minutes from the last meeting]]: all
    6 KB (908 words) - 06:05, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (767 words) - 15:51, 9 April 2013
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> # '''Mar 7 Meeting'''
    3 KB (450 words) - 15:16, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> # '''Mar 7 Meeting'''
    5 KB (760 words) - 10:31, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (782 words) - 07:29, 8 May 2013
  • == Meeting Time and Place == The meeting will be on Wednesday April 13, 2016 at 11:15am EDT.
    4 KB (455 words) - 17:00, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday May 1, 2013 at 11:15am EDT.
    2 KB (247 words) - 22:03, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    5 KB (830 words) - 17:48, 30 April 2013
  • GlueX Offline Software Meeting<br> Wednesday, May 1, 2013<br>
    4 KB (600 words) - 15:57, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
    4 KB (647 words) - 13:14, 14 May 2013
  • GlueX Start Counter Meeting<br> Thursday, May 2, 2013<br>
    3 KB (408 words) - 23:41, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ...er layers has a radial component. Zisis mentioned that the 2006 beam tests may not have many events in the rear layers sine the tagger energy went up only
    4 KB (668 words) - 12:43, 31 March 2015
  • == Meeting Time and Place == Friday May 3, 2013 at 1:30pm
    660 B (96 words) - 23:40, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Monday May 6, 2013 at 11:30am EDT.
    1 KB (163 words) - 04:15, 1 April 2015
  • GlueX TOF Meeting<br> Thursday, May 9, 2013<br>
    5 KB (854 words) - 16:40, 31 March 2015
  • GlueX Offline Software Meeting<br> Wednesday, May 15, 2013<br>
    5 KB (788 words) - 17:22, 31 March 2015
  • '''This will be a short meeting due to the JLab Run-A-Round''' ** [[GlueX-Collaboration-Jun-2013|Collaboration Meeting]] Schedule
    3 KB (534 words) - 06:45, 1 April 2015
  • == Meeting Time and Place == The meeting will be on Monday May 20, 2013 at 11:30am EDT.
    1 KB (136 words) - 17:12, 24 February 2017
  • GlueX Start Counter Meeting<br> Thursday, May 16, 2013<br>
    3 KB (388 words) - 06:05, 1 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday May 15, 2013 at 11:15am EDT.
    2 KB (245 words) - 09:49, 15 May 2013
  • == Meeting Time and Place == Friday, May 10, 2013 at 1:30 PM
    2 KB (217 words) - 17:12, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> # Talk at the Collaboration Meeting
    3 KB (484 words) - 10:34, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday May 29, 2013 at 11:15am EDT.
    2 KB (239 words) - 10:24, 31 March 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    6 KB (993 words) - 17:13, 24 February 2017
  • == Meeting Time and Place == Wednesday May 22, 2013 at 11:00am
    3 KB (536 words) - 19:47, 23 May 2013
  • GlueX TOF Meeting<br> Thursday, May 23, 2013<br>
    7 KB (1,072 words) - 06:22, 1 April 2015
  • == Meeting Time and Place == Friday, May 24, 2013 at 1:30 PM
    4 KB (541 words) - 20:36, 31 March 2015
  • GlueX Offline Software Meeting<br> ...iew of [[GlueX Offline Meeting, May 15, 2013#Minutes|minutes from the last meeting]]: all
    4 KB (680 words) - 17:22, 31 March 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    4 KB (607 words) - 17:13, 24 February 2017
  • GlueX TOF Meeting<br> # Review of [[GlueX TOF Meeting, May 23, 2013#Minutes|last TOF bi-weekly meeting]]
    5 KB (839 words) - 18:02, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday June 26, 2013 at 11:15am EDT.
    2 KB (244 words) - 10:43, 26 June 2013
  • * [[GlueX Tutorial 2022]] May 23, 2022 at Jefferson Lab ...-private/index.php/May_2019_Workshop_on_Comparison_of_Data_and_Monte_Carlo May 2019 Workshop on Comparison of Data and Monte Carlo]
    1 KB (146 words) - 10:38, 8 March 2023
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, May 16, 2013#Minutes|minutes from previous meeting]]
    3 KB (544 words) - 20:53, 31 March 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    9 KB (1,361 words) - 17:11, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday July 24, 2013 at 11:15am EDT.
    6 KB (901 words) - 17:04, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (852 words) - 17:07, 24 February 2017
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, July 24, 2013#Minutes|minutes from the last meeting]]: all
    4 KB (681 words) - 17:30, 31 March 2015
  • GlueX Offline Software Meeting<br> ...w of [[GlueX Offline Meeting, August 7, 2013#Minutes|minutes from the last meeting]]: all
    5 KB (825 words) - 11:10, 31 March 2015
  • ..._Software_Meeting,_July_18,_2022#Minutes|Minutes of the July 18th Software Meeting]] are available ...eX_Software_Meeting,_June_6,_2022#Minutes|Minutes of the June 6th Software Meeting]] are available
    13 KB (1,688 words) - 18:52, 31 January 2024
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, August 1, 2013#Minutes|last TOF bi-weekly meeting]]
    3 KB (516 words) - 23:41, 31 March 2015
  • GlueX Start Counter Meeting<br> ...GlueX Start Counter Meeting, August 22, 2013#Minutes|minutes from previous meeting]]
    5 KB (833 words) - 00:14, 1 April 2015
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    5 KB (827 words) - 06:39, 1 April 2015
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (710 words) - 17:13, 24 February 2017
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, August 29, 2013#Minutes|meeting on August 29]]
    5 KB (792 words) - 06:17, 1 April 2015
  • # In the "join a meeting" box enter the Hall D code: 3421244 Example (from the May 2008 meeting):
    3 KB (433 words) - 17:13, 24 February 2017
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ...uss and prioritize the Reconstruction Issues and prepare for Collaboration Meeting:
    3 KB (374 words) - 11:03, 31 March 2015
  • GlueX Offline Software Meeting<br> ...f [[GlueX Offline Meeting, September 4, 2013#Minutes|minutes from the last meeting]]: all
    6 KB (1,000 words) - 20:36, 31 March 2015
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, September 12, 2013#Minutes|meeting on September 12]]
    5 KB (771 words) - 23:41, 31 March 2015
  • GlueX Start Counter Meeting<br> ...eX Start Counter Meeting, September 19, 2013#Minutes|minutes from previous meeting]]
    3 KB (433 words) - 20:46, 31 March 2015
  • Software Review Planning Meeting ...ks at the 12-Gev Software Review, but that we would most likely not have a meeting this week.
    4 KB (538 words) - 11:21, 28 October 2013
  • == Meeting Time and Place == The meeting will be on Wednesday March 1, 2017 at 11:15am EDT.
    3 KB (328 words) - 07:33, 15 March 2017
  • * Review of minutes from [[OWG_Meeting_23-Oct-2013 | 23-Oct-2013]] meeting ==Next Meeting==
    4 KB (703 words) - 06:58, 1 April 2015
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, October 16, 2013#Minutes|minutes from the last meeting]]: all
    5 KB (793 words) - 17:04, 24 February 2017
  • Software Review Planning Meeting ...sics Division Software Review Preparation Meeting Oct, 28, 2013|All Hall]] Meeting
    4 KB (568 words) - 17:13, 24 February 2017
  • == Meeting General Agenda == ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227.
    22 KB (3,414 words) - 16:27, 26 November 2018
  • |width="140"| [[BLTWG Meeting 01/05/2015|January 5, 2015]] |width="140"| [[BLTWG Meeting 01/19/2015|January 19, 2015]]
    4 KB (435 words) - 17:13, 24 February 2017
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, October 30, 2013#Minutes|minutes from the last meeting]]: all
    6 KB (957 words) - 17:00, 24 February 2017
  • ...ficially adopted by the Hall D Online group on 4-Dec-2013. Present at the meeting were: Elliott W, Bryan M, Curtis M, Dave L, Mark I, Elton S, Graham H, Sea # Detector groups may use detector system specfic accounts for operations that might otherwise in
    9 KB (1,461 words) - 17:13, 24 February 2017
  • * Review of minutes from [[OWG_Meeting_20-Nov-2013 | 20-Nov-2013]] meeting ==Next Meeting==
    7 KB (1,064 words) - 06:33, 1 April 2015
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, November 07, 2013#Minutes|meeting on November 7]]
    2 KB (372 words) - 14:25, 31 March 2015
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    4 KB (683 words) - 11:35, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday March 16, 2016 at 11:15am EDT.
    3 KB (419 words) - 12:38, 14 March 2017
  • GlueX Offline Software Meeting<br> ...f [[GlueX Offline Meeting, November 13, 2013#Minutes|minutes from the last meeting]]: all
    8 KB (1,232 words) - 14:54, 25 September 2018
  • == GlueX Collaboration Meeting == <font size="+1">May 9 to 11, 2016 at Jefferson Lab</font>
    10 KB (1,283 words) - 12:38, 14 March 2017
  • |width="140"| [[BLTWG Meeting 01/07/2013|January 7, 2013]] |width="140"| [[BLTWG Meeting 01/21/2013|January 21, 2013]]
    5 KB (749 words) - 12:22, 8 January 2014
  • == GlueX Collaboration Meeting == <font size="+1">May 12 to 14, 2014 at Jefferson Lab</font>
    10 KB (1,231 words) - 12:38, 14 March 2017
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (738 words) - 17:12, 24 February 2017
  • GlueX Offline Software Meeting<br> ## [[GlueX-Collaboration-Feb-2014|Collaboration Meeting Agenda, February 20-22]]
    7 KB (1,149 words) - 11:34, 31 March 2015
  • * [[OWG Meeting 15-Jan-2014 | Previous Meeting (15-Jan-2014)]] * [[Spring_2014_Online_Data_Challenge| Online Data Challenge May 2014]]
    4 KB (697 words) - 01:50, 1 April 2015
  • ...t color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> # Announcements: David reported on Eugene's clarifications during the Hall-D meeting (Feb 5) on 6 FTE losses and the possible impact on Hall-D activities.
    3 KB (396 words) - 20:12, 7 February 2014
  • * Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] * GlueX collaboration meeting (Hovanes)
    3 KB (499 words) - 12:07, 10 February 2014
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, January 22, 2014#Minutes|minutes from the last meeting]]: all
    6 KB (897 words) - 11:33, 31 March 2015
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    4 KB (655 words) - 16:54, 24 February 2017
  • = Previous Meeting = * [[OWG Meeting 29-Jan-2014 | Previous Meeting (29-Jan-2014)]]
    3 KB (382 words) - 04:01, 1 April 2015
  • GlueX Data Challenge Meeting<br> Find a recording of this meeting [https://halldweb.jlab.org/talks/2014-1Q/data_challenge_2014-02-14/index.ht
    5 KB (853 words) - 15:50, 31 March 2015
  • == Meeting Time and Place == At Jefferson Lab, the meeting will be held in F326
    4 KB (577 words) - 18:27, 26 February 2014
  • GlueX Data Challenge Meeting<br> #* Running jobs at NU Sean - [https://halldweb.jlab.org/wiki/images/f/f8/DC2-Meeting-sdobbs-20140228.pdf slides]
    5 KB (836 words) - 11:10, 31 March 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    6 KB (892 words) - 17:13, 24 February 2017
  • GlueX Start Counter Meeting<br> ...lueX Start Counter Meeting, November 5, 2015#Minutes|minutes from the last meeting]]
    2 KB (347 words) - 15:48, 3 December 2015
  • GlueX Data Challenge Meeting<br> # Review of [[GlueX Data Challenge Meeting, February 28, 2014#Minutes|minutes from last time]]
    6 KB (951 words) - 10:52, 31 March 2015
  • GlueX Data Challenge Meeting<br> ...use the <i>phone information</i> from below. The main drawback is that you may not be able to connect via a browser using a linux computer.
    9 KB (1,461 words) - 17:00, 24 February 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    7 KB (1,106 words) - 17:13, 24 February 2017
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    6 KB (908 words) - 12:38, 27 March 2014
  • GlueX Offline Software Meeting<br> ...of [[GlueX Offline Meeting, February 5, 2014#Minutes|minutes from the last meeting]]: all
    7 KB (1,087 words) - 21:45, 31 March 2015
  • GlueX Data Challenge Meeting<br> # Review of [[GlueX Data Challenge Meeting, March 14, 2014#Minutes|minutes from last time]]
    7 KB (1,057 words) - 16:55, 24 February 2017
  • ...use the <i>phone information</i> from below. The main drawback is that you may not be able to connect via a browser using a linux computer. The first time that you connect to a bluejeans meeting, you will be prompted to install an application for your web browser. Versi
    5 KB (860 words) - 17:00, 24 February 2017
  • GlueX Calibration Meeting<br> ...use the <i>phone information</i> from below. The main drawback is that you may not be able to connect via a browser using a linux computer.
    6 KB (934 words) - 17:13, 24 February 2017
  • == Meeting Information == GlueX Data Challenge Meeting<br>
    6 KB (879 words) - 11:00, 31 March 2015
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (750 words) - 09:28, 11 April 2014
  • == Meeting Time and Place == The meeting will be on Monday April 7, 2014 at 11:30am EDT.
    3 KB (432 words) - 17:13, 24 February 2017
  • ...use the <i>phone information</i> from below. The main drawback is that you may not be able to connect via a browser using a linux computer. The first time that you connect to a bluejeans meeting, you will be prompted to install an application for your web browser. Versi
    3 KB (394 words) - 17:13, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday April 2, 2014 at 11:15am EDT.
    2 KB (270 words) - 11:10, 31 March 2015
  • GlueX Start Counter Meeting<br> ...[GlueX Start Counter Meeting, March 20, 2014#Minutes|minutes from previous meeting]]
    2 KB (386 words) - 17:30, 31 March 2015
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    5 KB (710 words) - 20:00, 16 April 2014
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 462509408. # [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14
    4 KB (536 words) - 06:26, 1 April 2015
  • GlueX Time-of-Flight Meeting<br> # [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14
    1 KB (162 words) - 02:24, 1 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday April 16, 2014 at 11:15am EDT.
    3 KB (302 words) - 11:33, 31 March 2015
  • ...use the <i>phone information</i> from below. The main drawback is that you may not be able to connect via a browser using a linux computer. The first time that you connect to a bluejeans meeting, you will be prompted to install an application for your web browser. Versi
    4 KB (484 words) - 11:14, 3 July 2020
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (866 words) - 13:49, 24 April 2014
  • == Meeting Time and Place == The meeting will be on Monday April 21, 2014 at 11:30am EDT.
    3 KB (463 words) - 16:54, 24 February 2017
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, April 2, 2014#Minutes|minutes from the last meeting]]: all
    10 KB (1,598 words) - 18:44, 31 March 2015
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, April 3, 2014#Minutes|minutes from previous meeting]]
    5 KB (859 words) - 22:25, 31 March 2015
  • ''<font color=red>Meeting Time: 11:00 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (892 words) - 12:40, 21 April 2016
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    2 KB (227 words) - 13:30, 23 April 2014
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 120390084. # [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14
    4 KB (652 words) - 06:29, 1 April 2015
  • GlueX Time-of-Flight Meeting<br> # [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14
    3 KB (491 words) - 23:53, 31 March 2015
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    896 B (116 words) - 13:02, 2 May 2014
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (752 words) - 20:31, 8 May 2014
  • GlueX Offline Software Meeting<br> ...w of [[GlueX Offline Meeting, April 16, 2014#Minutes|minutes from the last meeting]]: all
    9 KB (1,371 words) - 00:26, 1 April 2015
  • # [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14
    1 KB (186 words) - 17:13, 24 February 2017
  • ...supervising the filling of the shift schedule. <del>Undergraduate students may not be assigned shifts without prior approval of the PDL.</del> By assigni ...ration maintained by the Collaboration Board (CB) '''at each collaboration meeting'''. Shifts will be assigned in <del>4 day</del> blocks to all member instit
    9 KB (1,414 words) - 12:02, 2 May 2014
  • ...supervising the filling of the shift schedule. <del>Undergraduate students may not be assigned shifts without prior approval of the PDL.</del> By assigni ...ration maintained by the Collaboration Board (CB) '''at each collaboration meeting'''.
    5 KB (842 words) - 18:21, 2 May 2014
  • == Meeting Time and Place == The meeting will be on Monday May 7, 2014 at 11:30am EDT.
    1 KB (217 words) - 17:12, 24 February 2017
  • GlueX Start Counter Meeting<br> Thursday, May 1, 2014<br>
    3 KB (477 words) - 06:26, 1 April 2015
  • GlueX Calibration Meeting<br> Wednesday, May 7, 2014<br>
    2 KB (383 words) - 18:20, 7 May 2014
  • GlueX Time-of-Flight Meeting<br> Thursday, May 8, 2014<br>
    1 KB (186 words) - 19:44, 31 March 2015
  • ...lor=green>ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)</font> =Items for followup from previous meeting(s)=
    5 KB (739 words) - 01:50, 23 May 2014
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    787 B (106 words) - 10:20, 9 May 2014
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=1489 GlueX Doc 1429]]. It may be useful to reproduce this study with the latest reconstruction. The following channels were suggested at the May 2014 collaboration meeting (see [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2500 d
    4 KB (588 words) - 17:14, 24 February 2017
  • GlueX Calibration Meeting<br> Wednesday, May 21, 2014<br>
    3 KB (506 words) - 18:55, 21 May 2014
  • GlueX Time-of-Flight Meeting<br> Thursday, May 22, 2014<br>
    3 KB (447 words) - 03:38, 1 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday May 28, 2014 at 11:15am EDT.
    2 KB (288 words) - 11:29, 31 March 2015
  • GlueX Offline Software Meeting<br> Wednesday, May 28, 2014<br>
    4 KB (636 words) - 06:42, 1 April 2015
  • GlueX Start Counter Meeting<br> Thursday, May 29, 2014<br>
    4 KB (715 words) - 07:03, 1 April 2015
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, May 22, 2014#Minutes|meeting on May 22]]
    4 KB (672 words) - 00:30, 1 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday June 11, 2014 at 11:15am EDT.
    2 KB (306 words) - 11:34, 31 March 2015
  • GlueX Offline Software Meeting<br> ...iew of [[GlueX Offline Meeting, May 28, 2014#Minutes|minutes from the last meeting]] (all)
    5 KB (736 words) - 22:43, 31 March 2015
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, May 29, 2014#Minutes|minutes from previous meeting]]
    5 KB (787 words) - 20:23, 31 March 2015
  • == Meeting Time and Place == The meeting will be on Wednesday June 25, 2014 at 11:15am EDT.
    2 KB (310 words) - 11:32, 31 March 2015
  • GlueX Offline Software Meeting<br> ...ew of [[GlueX Offline Meeting, June 11, 2014#Minutes|minutes from the last meeting]] (all)
    4 KB (705 words) - 05:58, 1 April 2015
  • GlueX Start Counter Meeting<br> ...[[GlueX Start Counter Meeting, June 12, 2014#Minutes|minutes from previous meeting]]
    3 KB (492 words) - 00:48, 1 April 2015
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, July 17, 2014#Minutes|July 17 Meeting]]
    7 KB (622 words) - 00:14, 1 April 2015
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, July 9, 2014#Minutes|minutes from July 9]] (all)
    5 KB (864 words) - 20:46, 31 March 2015
  • =Meeting Info.= == Meeting Time And Location ==
    4 KB (515 words) - 12:38, 14 March 2017
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    5 KB (839 words) - 13:39, 31 July 2014
  • GlueX Time-of-Flight Meeting<br> ## Meeting schedule clarification
    5 KB (864 words) - 06:17, 1 April 2015
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    10 KB (1,640 words) - 23:37, 31 March 2015
  • ''<font color=red>Meeting Time: 11:00 a.m. Eastern</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    5 KB (805 words) - 06:53, 15 August 2014
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    9 KB (1,171 words) - 12:38, 14 March 2017
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    10 KB (1,447 words) - 17:12, 24 February 2017
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    3 KB (526 words) - 19:44, 31 March 2015
  • ''<font color=red>Meeting Time: 11:30 a.m. Eastern (until switch from DST and then return to 11:00am) ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    7 KB (1,077 words) - 18:12, 25 September 2014
  • GlueX Offline Software Meeting<br> # [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]]
    7 KB (1,120 words) - 06:17, 1 April 2015
  • * [[Possible Meeting Topics]] ...groups for compatibility with the overall control system. Such components may need to be modified to be compatible. Systems used only by experts need no
    6 KB (847 words) - 22:22, 31 March 2015
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    9 KB (1,130 words) - 12:38, 14 March 2017
  • == GlueX Collaboration Meeting == ...been set up to allow people to identify what needs to be presented at the meeting. It has been roughly broken out by working group with suggestions for topic
    10 KB (1,251 words) - 12:40, 14 March 2017
  • ''<font color=red>Meeting Time: 11:30 a.m. Eastern (until switch from DST and then return to 11:00am) ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (982 words) - 06:35, 1 April 2015
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, September 17, 2014#Minutes|minutes from September 17]] (all)
    6 KB (887 words) - 06:22, 1 April 2015
  • =Meeting time and location= ...g [https://cc.jlab.org/bluejeans BlueJeans Video/Audio conferencing]. Our meeting ID number is '''370588741'''.
    2 KB (248 words) - 14:47, 20 October 2014
  • GlueX Calibration Meeting<br> Wednesday, May 4, 2016<br>
    6 KB (944 words) - 17:13, 24 February 2017
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, May 25, 2016#Minutes|minutes from May 25]] (all)
    7 KB (999 words) - 10:12, 9 June 2016
  • =Meeting time and location= ...g [https://cc.jlab.org/bluejeans BlueJeans Video/Audio conferencing]. Our meeting ID number is '''370588741'''.
    3 KB (443 words) - 16:07, 31 March 2015
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, October 29, 2014#Minutes|minutes from October 29]] (all)
    4 KB (681 words) - 20:17, 31 March 2015
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    7 KB (1,204 words) - 12:38, 14 March 2017
  • ''<font color=red>Meeting Time: 11:00 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    8 KB (1,186 words) - 17:22, 31 March 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    7 KB (1,081 words) - 17:13, 24 February 2017
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, November 12, 2014#Minutes|minutes from November 12]] (all)
    6 KB (935 words) - 17:04, 24 February 2017
  • ''<font color=red>Meeting Time: 11:00 a.m. EDT</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    5 KB (745 words) - 13:31, 12 December 2014
  • Meeting time and location= ...g [https://cc.jlab.org/bluejeans BlueJeans Video/Audio conferencing]. Our meeting ID number is '''370588741'''.
    3 KB (502 words) - 06:10, 1 April 2015
  • # The committee may be smaller than usual, so splitting may result in too few reviewers per session. #* bi-weekly meeting
    5 KB (780 words) - 09:13, 19 January 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    6 KB (828 words) - 17:10, 24 February 2017
  • |width="140"| [[BLTWG Meeting 01/06/2014|January 6, 2014]] |width="140"| [[BLTWG Meeting 01/21/2014|January 21, 2014]]
    7 KB (1,061 words) - 17:14, 24 February 2017
  • GlueX Time-of-Flight Meeting<br> * The BlueJeans Meeting number is 350 531 998.
    2 KB (360 words) - 00:26, 1 April 2015
  • GlueX Software Review Meeting<br> * The BlueJeans meeting number is 968 592 007 .
    4 KB (649 words) - 14:06, 13 January 2015
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    11 KB (1,791 words) - 23:31, 31 March 2015
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227. *Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
    16 KB (2,495 words) - 10:00, 19 March 2015
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    5 KB (883 words) - 13:44, 30 January 2015
  • GlueX Time-of-Flight Meeting<br> * The BlueJeans Meeting number is 350 531 998.
    2 KB (363 words) - 04:01, 1 April 2015
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 120390084. ''*note: you'll be muted when first connected to the meeting. press *4 to unmute''
    6 KB (955 words) - 05:58, 1 April 2015
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227. == Collaboration Meeting ==
    1 KB (170 words) - 14:28, 18 February 2016
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    9 KB (1,402 words) - 14:46, 31 March 2015
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    8 KB (1,197 words) - 12:39, 14 March 2017
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, March 4, 2015#Minutes|minutes from March 4]] (all)
    6 KB (932 words) - 10:54, 1 April 2015
  • GlueX Start Counter Meeting<br> ...lueX Start Counter Meeting, March 5, 2015#Minutes|minutes from the March 5 meeting]]
    2 KB (263 words) - 14:40, 20 March 2015
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, March 18, 2015#Minutes|minutes from March 18]]
    3 KB (391 words) - 20:23, 1 April 2015
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 120390084. #*# ''detector groups may use detector system specfic accounts for operations that might otherwise in
    4 KB (641 words) - 16:12, 25 March 2015
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (912 words) - 18:39, 9 April 2015
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    3 KB (504 words) - 16:50, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday April 1, 2015 at 11:15am EDT.
    3 KB (324 words) - 16:54, 24 February 2017
  • == GlueX Collaboration Meeting == <font size="+1">May 11 to 13, 2015 at Jefferson Lab</font>
    9 KB (1,156 words) - 12:38, 14 March 2017
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 120390084. # '''[[GlueX-Collaboration-May-2015|Collaboration Meeting]]'''
    5 KB (731 words) - 17:07, 8 April 2015
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (848 words) - 16:55, 24 February 2017
  • # [[GlueX-Collaboration-May-2015|Collaboration Meeting]]
    1,007 B (142 words) - 11:45, 13 April 2015
  • GlueX Offline Software Meeting<br> # [[GlueX-Collaboration-May-2015|Collaboration Meeting]]
    4 KB (670 words) - 20:21, 15 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday April 15, 2015 at 11:15am EDT.
    3 KB (326 words) - 16:52, 24 February 2017
  • GlueX Start Counter Meeting<br> # [[GlueX-Collaboration-May-2015|Collaboration Meeting]]
    2 KB (246 words) - 14:06, 16 April 2015
  • GlueX Calibration Meeting<br> ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 630804895.
    9 KB (1,411 words) - 23:05, 22 April 2015
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (991 words) - 18:09, 7 May 2015
  • # [[GlueX-Collaboration-May-2015|Collaboration Meeting schedule]]
    2 KB (312 words) - 16:02, 27 April 2015
  • == Meeting Time and Place == The meeting will be on Wednesday April 29, 2015 at 11:15am EDT.
    3 KB (386 words) - 11:31, 29 April 2015
  • GlueX Start Counter Meeting<br> # [[GlueX-Collaboration-May-2015|Collaboration Meeting]]
    3 KB (443 words) - 16:00, 28 April 2015
  • GlueX Calibration Meeting<br> Wednesday, May 6, 2015<br>
    7 KB (1,098 words) - 17:12, 24 February 2017
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    4 KB (620 words) - 18:46, 7 May 2015
  • GlueX Time-of-Flight Meeting<br> Tuesday, May 5, 2015<br>
    3 KB (559 words) - 13:35, 20 May 2015
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 660743227. == Collaboration Meeting ==
    2 KB (211 words) - 11:20, 11 May 2015
  • Meeting time and location= ...g [https://cc.jlab.org/bluejeans BlueJeans Video/Audio conferencing]. Our meeting ID number is '''370588741'''.
    4 KB (635 words) - 09:14, 20 May 2015
  • GlueX Time-of-Flight Meeting<br> Tuesday, May 19, 2015<br>
    3 KB (489 words) - 12:40, 21 May 2015
  • GlueX Calibration Meeting<br> Wednesday, May 20, 2015<br>
    8 KB (1,328 words) - 11:20, 27 May 2015
  • GlueX Start Counter Meeting<br> Thursday, May 21, 2015<br>
    2 KB (298 words) - 17:05, 24 February 2017
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (928 words) - 17:11, 24 February 2017
  • == Meeting Time and Place == The meeting will be on Wednesday May 27, 2015 at 11:15am EDT.
    2 KB (272 words) - 11:49, 27 May 2015
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    920 B (125 words) - 16:29, 27 May 2015
  • GlueX Offline Software Meeting<br> Wednesday, May 27, 2015<br>
    6 KB (880 words) - 17:22, 1 June 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    5 KB (702 words) - 12:27, 3 June 2015
  • == Meeting Time and Place == The meeting will be on Wednesday June 10, 2015 at 11:15am EDT.
    3 KB (330 words) - 14:06, 10 June 2015
  • GlueX Offline Software Meeting<br> # Review of [[GlueX Offline Meeting, May 27, 2015#Minutes|minutes from May 27]] (all)
    5 KB (746 words) - 16:58, 24 February 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    5 KB (866 words) - 12:19, 17 June 2015
  • =Meeting Info.= == Meeting Time And Location ==
    2 KB (285 words) - 14:12, 7 November 2017
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, May 19, 2015#Minutes|minutes from May 19]]
    4 KB (561 words) - 16:46, 1 July 2015
  • ''<font color=red>Meeting Time: </font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    6 KB (817 words) - 17:11, 24 February 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    8 KB (1,280 words) - 17:34, 14 July 2015
  • GlueX Start Counter Meeting<br> ...[GlueX Start Counter Meeting, May 21, 2015#Minutes|minutes from the May 21 meeting]]
    4 KB (559 words) - 12:03, 15 July 2015
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    5 KB (754 words) - 12:40, 14 March 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    11 KB (1,662 words) - 17:13, 24 February 2017
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    7 KB (1,150 words) - 15:29, 30 July 2015
  • ''<font color=red>Meeting Time: 11:00 a.m. EDT</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    7 KB (1,050 words) - 12:40, 14 March 2017
  • Meeting time and location= ...g [https://cc.jlab.org/bluejeans BlueJeans Video/Audio conferencing]. Our meeting ID number is '''370588741'''. Click "Expand" for more details.
    3 KB (406 words) - 16:58, 29 July 2015
  • GlueX Time-of-Flight Meeting<br> # Review of [[GlueX TOF Meeting, July 14, 2015#Minutes|minutes from July 14]]
    3 KB (440 words) - 17:13, 24 February 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    6 KB (937 words) - 17:12, 24 February 2017
  • == Meeting Information == GlueX PID Upgrade Meeting<br>
    6 KB (853 words) - 07:35, 3 August 2015
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    4 KB (623 words) - 17:07, 24 February 2017
  • ''<font color=red>Meeting Time: </font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    4 KB (655 words) - 16:54, 24 February 2017
  • ''<font color=red>Meeting Time: 11 a.m.</font>'' ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 907185247.
    7 KB (1,035 words) - 17:05, 24 February 2017
  • GlueX Offline Software Meeting<br> ## Offline Monitoring (Kei) [links from last week's calibration meeting]
    10 KB (1,591 words) - 21:24, 22 August 2015
  • August 20, 2015 Drift Chamber meeting ...rg/wiki/index.php/Connect_to_Bluejeans_Meetings Instructions for Bluejeans meeting connection]
    2 KB (319 words) - 17:12, 24 February 2017
  • GlueX Calibration Meeting<br> You can connect using [https://bluejeans.com/630804895 BlueJeans] using the meeting number 630 804 895 . &nbsp;&nbsp;&nbsp;&nbsp;&nbsp; (Click "Expand" to the
    6 KB (867 words) - 16:51, 24 February 2017
  • ...o to the IP Address: 199.48.152.152 ([http://bjn.vc bjn.vc]) and enter the meeting ID: 120390084. = Previous Meeting =
    3 KB (413 words) - 17:14, 24 February 2017

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)