Pages with the most revisions

From GlueXWiki
Jump to: navigation, search

Showing below up to 500 results in range #101 to #600.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. Level-1 Trigger‏‎ (116 revisions)
  2. RunPeriod-2019-01 Validation‏‎ (116 revisions)
  3. 2022 Data Production‏‎ (115 revisions)
  4. Run Planning Meeting Notes, June 23 - June 29, 2022‏‎ (115 revisions)
  5. GlueX Tutorial 2022‏‎ (115 revisions)
  6. Offline Software News Archive‏‎ (115 revisions)
  7. GlueX-Collaboration-Feb-2013‏‎ (114 revisions)
  8. Offline Monitoring Data Validation‏‎ (113 revisions)
  9. CDC recent run drift times‏‎ (113 revisions)
  10. Eta Decay Width Measurements via Primakoff Effect‏‎ (113 revisions)
  11. Nov 3-5, 2009 Calorimetry‏‎ (113 revisions)
  12. Run Coordination Meetings:Summer2020‏‎ (112 revisions)
  13. Mattione Update 09042013‏‎ (112 revisions)
  14. GlueX-Collaboration-Oct-2012‏‎ (112 revisions)
  15. Run Coordination Meetings: Spring run‏‎ (112 revisions)
  16. GlueX-Collaboration-Feb-2020‏‎ (111 revisions)
  17. Mattione Update 04212014‏‎ (111 revisions)
  18. Fiber Test Stand at JLAB‏‎ (111 revisions)
  19. GlueX-Collaboration-Jun-2013‏‎ (110 revisions)
  20. Private:Trigger Types‏‎ (109 revisions)
  21. Analysis DReaction‏‎ (109 revisions)
  22. Run Planning Meeting Notes, Mar 29-Apr 4, 2018‏‎ (108 revisions)
  23. Studies of the Newport XPS controller by Vanik‏‎ (108 revisions)
  24. GlueX-Collaboration-May-2021‏‎ (107 revisions)
  25. GlueX-Collaboration-Sep-2009‏‎ (107 revisions)
  26. LE algo‏‎ (107 revisions)
  27. GlueX-Collaboration-Jun-2012‏‎ (107 revisions)
  28. GlueX-Collaboration-Oct-2014‏‎ (106 revisions)
  29. Summer 2013 Manpower Contributions‏‎ (106 revisions)
  30. RunPeriod-2018-01 Validation‏‎ (104 revisions)
  31. GlueX-Collaboration-Sep-2011‏‎ (104 revisions)
  32. Offline HOWTO List‏‎ (104 revisions)
  33. Experiment Readiness Review 2020‏‎ (103 revisions)
  34. GlueX-Collaboration-Oct-2019‏‎ (103 revisions)
  35. Run Planning Meeting Notes, Mar 1-Mar 7, 2018‏‎ (103 revisions)
  36. GlueX Physics Quark Model‏‎ (103 revisions)
  37. GlueX-Collaboration-May-2017‏‎ (103 revisions)
  38. Online Major Milestones‏‎ (102 revisions)
  39. Run Planning Meeting Noters, November 9- November 16, 2022‏‎ (102 revisions)
  40. PMT & Divider‏‎ (102 revisions)
  41. RunPeriod-2022-05 Validation‏‎ (101 revisions)
  42. Run Coordination Meetings:Spring2019 Run‏‎ (101 revisions)
  43. Run Planning Meeting Notes, September 17 - 21, 2020‏‎ (101 revisions)
  44. Online task list for 2011‏‎ (101 revisions)
  45. Run Coordination Meetings:Summer2022‏‎ (101 revisions)
  46. Noise studies‏‎ (100 revisions)
  47. Run Planning Meeting Notes, November 24 - November 30, 2022‏‎ (100 revisions)
  48. GlueX-Collaboration-Oct-2017‏‎ (99 revisions)
  49. GlueX-Collaboration-May-2009‏‎ (99 revisions)
  50. Run Coordination Meetings: Fall 2016 Run‏‎ (99 revisions)
  51. Oct 15, 2008 Calorimetry‏‎ (99 revisions)
  52. Run Planning Meeting Notes, January 26 - February 1, 2023‏‎ (99 revisions)
  53. Real Gamma GDH Experiment (REGGE)‏‎ (98 revisions)
  54. GlueX-Collaboration-Feb-2022‏‎ (98 revisions)
  55. Run Planning Meeting Notes, Feb 12-Feb 28, 2018‏‎ (97 revisions)
  56. SRC@GlueX‏‎ (97 revisions)
  57. Run Planning Meeting Notes, August 27-September 2, 2020‏‎ (97 revisions)
  58. GlueX-Collaboration-May-2016‏‎ (97 revisions)
  59. Run Planning Meeting Notes, September 22 - September 28, 2022‏‎ (96 revisions)
  60. PrimEx (informal) Calibration & Analysis Meeting‏‎ (95 revisions)
  61. Run Table‏‎ (95 revisions)
  62. BCAL Beam Tests 2012‏‎ (95 revisions)
  63. Spring 2019 DIRC Commissioning‏‎ (95 revisions)
  64. BCAL Reconstruction‏‎ (94 revisions)
  65. SiPM electrical and cooling‏‎ (93 revisions)
  66. GlueX-Collaboration-May-2015‏‎ (93 revisions)
  67. GlueX-Collaboration-Feb-2016‏‎ (93 revisions)
  68. Primer for shift takers DRAFT‏‎ (93 revisions)
  69. Run Planning Meeting Notes, September 3 - 9, 2020‏‎ (93 revisions)
  70. SRC FCAL time/energy calibrations‏‎ (91 revisions)
  71. Follow up on the Hodoscope Fabrication Readiness Review‏‎ (91 revisions)
  72. GlueX-Collaboration-Jan-2010‏‎ (90 revisions)
  73. Run Planning Meeting Notes, Dec 5-Dec 11, 2019‏‎ (89 revisions)
  74. Run Planning Meeting Notes, August 25 - August 31, 2022‏‎ (89 revisions)
  75. May 2008 Subsystem Review‏‎ (89 revisions)
  76. Run Planning Meeting Notes, Nov 1-Nov 8, 2018‏‎ (88 revisions)
  77. Calibration Challenge‏‎ (88 revisions)
  78. Online Design Goals‏‎ (88 revisions)
  79. Theses‏‎ (87 revisions)
  80. Analysis shift‏‎ (87 revisions)
  81. Solenoid Coil Test Weekly meetings‏‎ (87 revisions)
  82. Offline Monitoring Data Validation CPP‏‎ (87 revisions)
  83. GlueX-Collaboration-Oct-2020‏‎ (87 revisions)
  84. GlueX-Collaboration-May-2023‏‎ (87 revisions)
  85. 2012 Software Review‏‎ (87 revisions)
  86. PAC Proposals‏‎ (87 revisions)
  87. GlueX-Collaboration-Jan-2009‏‎ (87 revisions)
  88. Beam Commissioning Plan‏‎ (86 revisions)
  89. SRC/CT Good Run Selection‏‎ (85 revisions)
  90. GlueX Physics Photoproduction‏‎ (85 revisions)
  91. GlueX Physics‏‎ (84 revisions)
  92. Getting Started At GlueX‏‎ (84 revisions)
  93. Run Planning Meeting Notes, September 23 - September 29, 2021‏‎ (84 revisions)
  94. CDC B field‏‎ (84 revisions)
  95. 2020 Data Production‏‎ (84 revisions)
  96. Run Planning Meeting Notes, Apr12-Apr 18, 2018‏‎ (84 revisions)
  97. Preparation for 2021 Run‏‎ (84 revisions)
  98. GlueX-Collaboration-Feb-2018‏‎ (84 revisions)
  99. Beam Test Run Plan‏‎ (83 revisions)
  100. GlueX-Collaboration-Feb-2024‏‎ (83 revisions)
  101. Weekly Technical Meetings‏‎ (82 revisions)
  102. ReactionFilter‏‎ (82 revisions)
  103. Run Planning Meeting Notes, Feb 23- Mar 1, 2017‏‎ (81 revisions)
  104. GlueX PID Bi-Weekly Meetings‏‎ (81 revisions)
  105. GlueX-Collaboration-May-2024‏‎ (81 revisions)
  106. Run Planning Meeting Notes, Jan 25-Jan 31, 2018‏‎ (81 revisions)
  107. Photon Tagger‏‎ (81 revisions)
  108. Repairs made to TAGH scintillator counters over the summer of 2019‏‎ (81 revisions)
  109. Run Wiki‏‎ (80 revisions)
  110. GlueX Tutorial 2018‏‎ (80 revisions)
  111. University of Connecticut Active Collimator Station Tutorial‏‎ (80 revisions)
  112. F425962‏‎ (80 revisions)
  113. RunPeriod-2023-01 Validation‏‎ (79 revisions)
  114. Final test of dividers‏‎ (79 revisions)
  115. SRC-CT Software‏‎ (79 revisions)
  116. GlueX-Collaboration-Sep-2023‏‎ (78 revisions)
  117. Reviews‏‎ (78 revisions)
  118. CDC 216 channels‏‎ (78 revisions)
  119. Analysis Working Group Meetings‏‎ (77 revisions)
  120. CDC 50 50‏‎ (77 revisions)
  121. HOWTO use hdgeant4 as a beam Monte Carlo generator‏‎ (77 revisions)
  122. Online Project List‏‎ (77 revisions)
  123. Posters‏‎ (76 revisions)
  124. FA125 firmware check 2.00D+‏‎ (76 revisions)
  125. GlueX-Collaboration-Feb-2021‏‎ (76 revisions)
  126. Mattione Kaon PID Studies phi3(1850)‏‎ (76 revisions)
  127. HDGeant4 Meetings‏‎ (76 revisions)
  128. Run Planning Meeting Notes, March 1 - March 8, 2023‏‎ (76 revisions)
  129. Run Planning Meeting Notes, February 23 - February 28, 2023‏‎ (76 revisions)
  130. HDDM Programmer's Interface‏‎ (76 revisions)
  131. Mattione Update 10312011‏‎ (76 revisions)
  132. RunPeriod-2016-02 Validation‏‎ (75 revisions)
  133. GlueX-Collaboration-Sep-2021‏‎ (75 revisions)
  134. Physics Publications‏‎ (74 revisions)
  135. HallD Online IP Name And Address Conventions‏‎ (74 revisions)
  136. Deprecated: JANA/DANA‏‎ (74 revisions)
  137. Run Planning Meeting Notes, Oct 4-Oct 10, 2018‏‎ (74 revisions)
  138. GlueX Physics Strong Decay Models‏‎ (73 revisions)
  139. Pair Spectrometer‏‎ (73 revisions)
  140. Run Coordination Meetings: Spring 2017 Run‏‎ (73 revisions)
  141. GlueX-Collaboration-Sep-2022‏‎ (73 revisions)
  142. Spring 2017 Analysis Launch Cuts‏‎ (72 revisions)
  143. Kinematic Fitting Workshop 2021‏‎ (72 revisions)
  144. Run Planning Meeting Notes, August 11- August 17, 2022‏‎ (72 revisions)
  145. RunPeriod-2022-08 Validation‏‎ (71 revisions)
  146. GlueX-Collaboration-May-2022‏‎ (71 revisions)
  147. ASIC design optimizations‏‎ (71 revisions)
  148. 2011 Hall B FCAL Beam Test‏‎ (70 revisions)
  149. Run Planning Meeting Notes, February 2 - February 9, 2023‏‎ (70 revisions)
  150. Active Base Radiation Tests‏‎ (70 revisions)
  151. Run Planning Meeting Notes, Mar 12-Mar 18, 2020‏‎ (70 revisions)
  152. Tagged Beam Group Engineering Drawings‏‎ (70 revisions)
  153. Test Setup for SiPMs‏‎ (69 revisions)
  154. Trigger Commissioning‏‎ (69 revisions)
  155. Run Planning Meeting Notes, Jan 30-Feb 05, 2020‏‎ (69 revisions)
  156. CRYTUR‏‎ (69 revisions)
  157. Run Planning Meeting Notes, Sep 28-Oct 3, 2018‏‎ (69 revisions)
  158. Sim-Recon Tagged Releases‏‎ (69 revisions)
  159. Private:UConn test setup‏‎ (68 revisions)
  160. Run Planning Meeting Notes, June 8 - June 15, 2022‏‎ (68 revisions)
  161. Run Planning Meeting Notes, July 07 - July 14, 2022‏‎ (68 revisions)
  162. Offline Monitoring Archived Data‏‎ (67 revisions)
  163. FCAL Insert‏‎ (67 revisions)
  164. Tagger Microscope‏‎ (67 revisions)
  165. GlueX-Collaboration-Feb-2023‏‎ (67 revisions)
  166. RunPeriod-2017-01 Validation‏‎ (67 revisions)
  167. Getting started with GlueX Software‏‎ (67 revisions)
  168. Run Planning Meeting Notes, October 21 - October 27, 2021‏‎ (67 revisions)
  169. 2017-01-recon v2-sims‏‎ (66 revisions)
  170. Specification for 12 GeV electron beam and associated instrumentation‏‎ (66 revisions)
  171. Light Guide Information‏‎ (66 revisions)
  172. DIRC‏‎ (65 revisions)
  173. Trigger and Readout Electronics‏‎ (65 revisions)
  174. CDC 60 40‏‎ (65 revisions)
  175. CDC q vs n‏‎ (65 revisions)
  176. Run Planning Meeting Notes, Feb 16-Feb 22, 2017‏‎ (65 revisions)
  177. GlueX phase 2, 2023-01 data set‏‎ (64 revisions)
  178. Calibration Train‏‎ (64 revisions)
  179. Time-of-Flight‏‎ (64 revisions)
  180. FA125 chip occupancy‏‎ (64 revisions)
  181. Run Planning Meeting Notes, November 30 - December 7, 2022‏‎ (63 revisions)
  182. GlueX-Collaboration-May-2008‏‎ (63 revisions)
  183. Automatic Builds of GlueX Software‏‎ (63 revisions)
  184. Analysis Launch Plugin Requirements‏‎ (63 revisions)
  185. Specification for active photon collimator system‏‎ (63 revisions)
  186. DSelector‏‎ (63 revisions)
  187. HOWTO install and run HDGeant4‏‎ (63 revisions)
  188. GlueX Software Setup‏‎ (63 revisions)
  189. MEDCON6 Shutdown Plan‏‎ (63 revisions)
  190. TS front panel connections‏‎ (63 revisions)
  191. Run Planning Meeting Notes, August 18 - August 23, 2022‏‎ (62 revisions)
  192. Fall 2015 Commissioning Plan‏‎ (62 revisions)
  193. Mattione BCAL Segmentation‏‎ (62 revisions)
  194. Calibration-Monitoring‏‎ (62 revisions)
  195. Mattione Study b1pi‏‎ (62 revisions)
  196. DC and PID Review‏‎ (62 revisions)
  197. Online builds 10-apr-2013‏‎ (61 revisions)
  198. Improved timing‏‎ (60 revisions)
  199. Practice Talks‏‎ (60 revisions)
  200. GlueX-II and DIRC ERR‏‎ (60 revisions)
  201. Mattione Particle Classes‏‎ (60 revisions)
  202. Run Planning Meeting Notes, Feb 9-Feb 15, 2017‏‎ (60 revisions)
  203. Run Planning Meeting Notes, January 19 - January 25, 2023‏‎ (60 revisions)
  204. Run Planning Meeting Notes, August 13 -17, 2020‏‎ (60 revisions)
  205. For the second coil‏‎ (60 revisions)
  206. Run Planning Meeting Notes, October 6 - October 12, 2022‏‎ (59 revisions)
  207. PMT tiles missing after restarting data taking‏‎ (59 revisions)
  208. Photon Beam Design Requirements‏‎ (59 revisions)
  209. 12 GeV Trigger/Online Workshop‏‎ (58 revisions)
  210. Run Planning Meeting Notes, September 1 - September 7, 2022‏‎ (58 revisions)
  211. CPP FCAL time/energy calibrations‏‎ (58 revisions)
  212. Readiness Review: Testing of light sensors for Bcal‏‎ (58 revisions)
  213. Hodoscope Fabrication Readiness Review‏‎ (57 revisions)
  214. BCAL Beam Tests‏‎ (57 revisions)
  215. RunPeriod-2021-08 Validation‏‎ (57 revisions)
  216. Run Planning Meeting Notes, Apr 11 - Apr 17, 2019‏‎ (57 revisions)
  217. Detector Rates and Lifetime‏‎ (56 revisions)
  218. GlueX-Collaboration-Jan-2008‏‎ (56 revisions)
  219. Run Planning Meeting Notes, August 3- August 10, 2022‏‎ (56 revisions)
  220. Addressing ERR review recommendations‏‎ (56 revisions)
  221. Collaboration Board‏‎ (56 revisions)
  222. Run Coordination Meetings:Fall2022‏‎ (55 revisions)
  223. CPP Test 2020 - Schedule‏‎ (55 revisions)
  224. Mattione Update 07092012‏‎ (55 revisions)
  225. Recoil proton reconstruction‏‎ (55 revisions)
  226. GlueX Tutorial 2019‏‎ (55 revisions)
  227. Publications‏‎ (55 revisions)
  228. Photon beam pipe‏‎ (55 revisions)
  229. Mattione Kaon PID Studies Y2175‏‎ (55 revisions)
  230. FCAL‏‎ (54 revisions)
  231. Short-Range Correlations and CT‏‎ (54 revisions)
  232. CDC straight straws‏‎ (54 revisions)
  233. Hall Network Specifications‏‎ (53 revisions)
  234. Run Planning Meeting Notes, September 16 - September 23, 2021‏‎ (53 revisions)
  235. SRC/CT Data Reconstruction‏‎ (53 revisions)
  236. OWG Meeting 13-Apr-2011‏‎ (53 revisions)
  237. HOWTO documentation‏‎ (53 revisions)
  238. Tagger Magnetic Field Mapping‏‎ (53 revisions)
  239. Run Planning Meeting Notes, Apr 26-May 2, 2018‏‎ (52 revisions)
  240. Online Action Items‏‎ (52 revisions)
  241. Barrel Calorimeter‏‎ (52 revisions)
  242. Motion Control Applications‏‎ (52 revisions)
  243. CDC algo tuning‏‎ (52 revisions)
  244. Pi0 polarizability Meetings‏‎ (52 revisions)
  245. Experiment Readiness Review 2017‏‎ (52 revisions)
  246. Run Planning Meeting Notes, Mar 2 - Mar 8, 2017‏‎ (52 revisions)
  247. Run Planning Meeting Notes, May 2-May 6, 2018‏‎ (51 revisions)
  248. CDC Construction Details‏‎ (51 revisions)
  249. Mini-BCAL Update June 19, 2012‏‎ (51 revisions)
  250. Fall 2019 DIRC Commissioning‏‎ (51 revisions)
  251. Run Planning Meeting Notes, Feb 1-Feb 7, 2018‏‎ (51 revisions)
  252. FADC FPGA Programming Meetings‏‎ (51 revisions)
  253. Final Design‏‎ (51 revisions)
  254. Mapping PS results‏‎ (51 revisions)
  255. RunPeriod-2018-08 Validation‏‎ (51 revisions)
  256. HOWTO get your jobs to run on the Grid‏‎ (51 revisions)
  257. FCAL Fabrication Readiness Review‏‎ (51 revisions)
  258. GlueX Project Overviews‏‎ (51 revisions)
  259. Run Planning Meeting Notes, December 16 - December 22, 2021‏‎ (50 revisions)
  260. BCAL reconstruction 11/28/11‏‎ (50 revisions)
  261. Analysis Shift Meeting Agenda, November 21 - November 27, 2021‏‎ (50 revisions)
  262. Mattione Update 04302014‏‎ (50 revisions)
  263. CDC gain calibrations‏‎ (50 revisions)
  264. Run Planning Meeting Notes, Nov 8-Nov 14, 2018‏‎ (50 revisions)
  265. Charged Pion Polarizability Experiment in Hall-D‏‎ (50 revisions)
  266. March 1, 2017, Production & Analysis Working Group‏‎ (50 revisions)
  267. GlueX Data Classes‏‎ (50 revisions)
  268. Conference Proceedings‏‎ (50 revisions)
  269. Run Coordination Meetings: Fall 2015 Run‏‎ (50 revisions)
  270. Run Coordination Meetings:Fall2021‏‎ (50 revisions)
  271. SRC/CT Calibrations‏‎ (49 revisions)
  272. BLTWG Meeting 12/6/2007‏‎ (49 revisions)
  273. Run Planning Meeting Notes, Jan 23-Jan 29, 2020‏‎ (49 revisions)
  274. Data Monitoring Database‏‎ (49 revisions)
  275. Run Planning Meeting Notes, Mar 28 - Apr 3, 2019‏‎ (49 revisions)
  276. CDC bad channels‏‎ (49 revisions)
  277. SCONS for online‏‎ (48 revisions)
  278. Active Collimator‏‎ (48 revisions)
  279. Mini BCAL for EIC‏‎ (48 revisions)
  280. Raid-to-Silo Transfer Strategy‏‎ (48 revisions)
  281. Run Planning Meeting Notes, April 19-April 25, 2016‏‎ (48 revisions)
  282. Mattione sim-recon Code Documentation‏‎ (48 revisions)
  283. Run Coordination Meetings:Winter2024‏‎ (48 revisions)
  284. Baby BCAL at JLab‏‎ (48 revisions)
  285. Mark's Sandbox‏‎ (48 revisions)
  286. Locking in JANA‏‎ (48 revisions)
  287. Configuration Management‏‎ (47 revisions)
  288. Beam Simulations‏‎ (47 revisions)
  289. Run Planning Meeting Notes, November 4 - November 10, 2021‏‎ (47 revisions)
  290. Trigger Commissioning Meetings‏‎ (47 revisions)
  291. Run Planning Meeting Notes, August 6 - 12, 2020‏‎ (47 revisions)
  292. September 19, 2014 Data Monitoring‏‎ (47 revisions)
  293. Comparison of radiation damage between FLUKA and Geant‏‎ (47 revisions)
  294. Analysis FAQ‏‎ (46 revisions)
  295. CHESS X-ray measurements 11/2006‏‎ (46 revisions)
  296. CDC Fabrication Readiness Review‏‎ (46 revisions)
  297. Planning for 2015 DIRC Review‏‎ (46 revisions)
  298. Tagger Engineering Design‏‎ (46 revisions)
  299. GlueX Physics Review Papers‏‎ (46 revisions)
  300. Mattione Update 09172012‏‎ (46 revisions)
  301. GlueX Physics Exotc Quantum Number Mesons‏‎ (45 revisions)
  302. Run Planning Meeting Notes, Feb 27-Mar 05, 2020‏‎ (45 revisions)
  303. May 7, 2009 Readout‏‎ (45 revisions)
  304. List of FCAL Beamtest Component IDs‏‎ (45 revisions)
  305. Photon Reconstruction in b1pi events 02/10/2012‏‎ (45 revisions)
  306. JEF meeting, April 8, 2022‏‎ (45 revisions)
  307. Meeting with SICCAS‏‎ (45 revisions)
  308. CPP DAQ/Monitoring Test Spring 2022‏‎ (45 revisions)
  309. Run Planning Meeting Notes, Mar 21 - Mar 27, 2019‏‎ (45 revisions)
  310. Spring 2016 Recon Checklist‏‎ (45 revisions)
  311. Possible Meeting Topics‏‎ (45 revisions)
  312. HOWTO use AmpTools on the JLab farm GPUs‏‎ (45 revisions)
  313. Results with the active collimator in the Hall B photon beam‏‎ (45 revisions)
  314. KPP November 30, 2014‏‎ (44 revisions)
  315. GlueX PAC 2010‏‎ (44 revisions)
  316. Run Planning Meeting Notes, Mar 9 - Mar 15, 2017‏‎ (44 revisions)
  317. 2013 Software Review‏‎ (44 revisions)
  318. Resolutions‏‎ (44 revisions)
  319. Solenoid Controls Redesign‏‎ (44 revisions)
  320. Run Planning Meeting Notes, March 15 - March 22, 2023‏‎ (44 revisions)
  321. Run Coordination Meetings:Summer Fall2022‏‎ (44 revisions)
  322. Slow controls‏‎ (44 revisions)
  323. CPP Design Meetings‏‎ (44 revisions)
  324. Run Planning Meeting Notes, September 10 - 16, 2020‏‎ (44 revisions)
  325. DIRC Software Overview‏‎ (44 revisions)
  326. FA125 Data Format July 7, 2015‏‎ (44 revisions)
  327. Simulations‏‎ (44 revisions)
  328. CDC Hit Generation‏‎ (44 revisions)
  329. Run Planning Meeting Notes, October 26 - November 2, 2022‏‎ (43 revisions)
  330. Run Planning Meeting Notes, Feb 28 - Mar 6, 2019‏‎ (43 revisions)
  331. FCAL Installation‏‎ (43 revisions)
  332. Basic formalism for X-ray monochromator resolution‏‎ (43 revisions)
  333. Email Lists‏‎ (43 revisions)
  334. Microscope Fabrication Readiness Review‏‎ (43 revisions)
  335. CDC prototype drift times‏‎ (43 revisions)
  336. CDC transfer func attempt‏‎ (43 revisions)
  337. Bill's to do list‏‎ (43 revisions)
  338. How to Setup Visual Studio Code for the ifarm‏‎ (43 revisions)
  339. BLTWG Meeting 11/25/2013‏‎ (42 revisions)
  340. Mattione Kaon PID Studies h2Prime(2600)‏‎ (42 revisions)
  341. CDC events‏‎ (42 revisions)
  342. Commissioning Calibration Data‏‎ (42 revisions)
  343. FCAL energy calibration‏‎ (42 revisions)
  344. Hall D Package Manager‏‎ (42 revisions)
  345. Event Analyzer‏‎ (42 revisions)
  346. Run Planning Meeting Notes, October 14 - October 20, 2021‏‎ (42 revisions)
  347. Optical link connections‏‎ (42 revisions)
  348. Photon Beam Polarimetry‏‎ (42 revisions)
  349. Run Planning Meeting Notes, Dec 5-Dec 11, 2018‏‎ (42 revisions)
  350. FA125 Data Format June 23, 2015‏‎ (41 revisions)
  351. CPP and NPP Experiment Configuration‏‎ (41 revisions)
  352. CDC prototype more on timing 3‏‎ (41 revisions)
  353. Mattione Update 08212013‏‎ (41 revisions)
  354. Offline Monitoring Incoming Data‏‎ (41 revisions)
  355. ADC data‏‎ (41 revisions)
  356. Run Planning Meeting Notes, Feb 15-Feb 21, 2018‏‎ (41 revisions)
  357. CDC travel plans‏‎ (41 revisions)
  358. BCAL hadronic efficiencies‏‎ (41 revisions)
  359. Neutral Particle PID May 2007‏‎ (40 revisions)
  360. Monitoring System Requirements‏‎ (40 revisions)
  361. 2023 Data Production‏‎ (40 revisions)
  362. Run Planning Meeting Notes, Nov 14-Nov 21, 2018‏‎ (40 revisions)
  363. FDC Fabrication Readiness Review‏‎ (40 revisions)
  364. Action Items‏‎ (40 revisions)
  365. First look at TOF calibration‏‎ (40 revisions)
  366. Run Coordination Meetings:Fall2018 Run‏‎ (40 revisions)
  367. Apr 15, 2010 Calorimetry‏‎ (39 revisions)
  368. CDC 06 02 2008‏‎ (39 revisions)
  369. Run Planning Meeting Notes, Apr 4 - Apr 10, 2019‏‎ (39 revisions)
  370. CDC time spikes‏‎ (39 revisions)
  371. PrimEx-eta Short Term Run Plan‏‎ (39 revisions)
  372. Crystals‏‎ (39 revisions)
  373. OWG Meeting 3-Aug-2011‏‎ (39 revisions)
  374. JEF meeting, October 13, 2023‏‎ (39 revisions)
  375. Mattione Kaon PID Studies‏‎ (39 revisions)
  376. Photon flux for GlueX empty target runs‏‎ (39 revisions)
  377. Monte Carlo simulation of the CHESS C1 beamline‏‎ (39 revisions)
  378. Aug 20, 2009 Calorimetry‏‎ (38 revisions)
  379. Mattione Kaon PID Studies eta1Prime(2300)‏‎ (38 revisions)
  380. C++11 in Hall D Online‏‎ (38 revisions)
  381. CDC tilted detectors‏‎ (38 revisions)
  382. GlueX-2023-01 data reconstruction‏‎ (38 revisions)
  383. SRC/CT Detector Calibration‏‎ (38 revisions)
  384. Polycom Equipment‏‎ (38 revisions)
  385. FCAL2 Crates‏‎ (38 revisions)
  386. HOWTO use the GlueX Singularity Container‏‎ (38 revisions)
  387. ASIC meeting June 14, 2010‏‎ (38 revisions)
  388. Calorimeter Review‏‎ (38 revisions)
  389. PrimEx-eta phase3 FCAL time/energy calibrations‏‎ (38 revisions)
  390. FDC‏‎ (38 revisions)
  391. Detector Alignment‏‎ (37 revisions)
  392. Minutes-9-27-2012‏‎ (37 revisions)
  393. Analysis Shift Meeting Agenda, November 14 - November 20, 2021‏‎ (37 revisions)
  394. Barrel Calorimeter Shift‏‎ (37 revisions)
  395. Online Data Challenge 2013 List of Issues‏‎ (37 revisions)
  396. Design of an asymmetric monochromator‏‎ (37 revisions)
  397. GlueX Offline Meeting, March 23, 2010‏‎ (37 revisions)
  398. Alarm System for EPICS‏‎ (37 revisions)
  399. DAQ test computer‏‎ (37 revisions)
  400. Run Planning Meeting Notes, November 18 - November 24, 2021‏‎ (37 revisions)
  401. Private:SiPM timing measurements‏‎ (37 revisions)
  402. BCAL reconstruction 01/16/2012‏‎ (36 revisions)
  403. FCAL Reconstruction in b1pi events 03/14/2012‏‎ (36 revisions)
  404. PID Progress‏‎ (36 revisions)
  405. Run Planning Meeting Notes, September 8 - September 14, 2022‏‎ (36 revisions)
  406. Silicon Photomultiplier Performance‏‎ (36 revisions)
  407. HOWTO generate Bethe-Heitler pairs in the GlueX target‏‎ (36 revisions)
  408. Run Planning Meeting Notes, Oct 11-Oct 17, 2018‏‎ (36 revisions)
  409. CDC 12 12 2007‏‎ (36 revisions)
  410. Particle Gun Collection‏‎ (36 revisions)
  411. Start Counter Operations‏‎ (36 revisions)
  412. Installing CSS‏‎ (36 revisions)
  413. Run Planning Meeting Notes, December 9 - December 15, 2021‏‎ (36 revisions)
  414. Jun 22, 2011 Replacement Solenoid‏‎ (36 revisions)
  415. CDC signal integration new‏‎ (36 revisions)
  416. Investigations and Repairs‏‎ (36 revisions)
  417. January 4, 2008 Calorimetry‏‎ (36 revisions)
  418. BLTWG Meeting 10/2/2008‏‎ (35 revisions)
  419. Fall 2019 Commissioning Meetings‏‎ (35 revisions)
  420. PID study proposal‏‎ (35 revisions)
  421. Run Planning Meeting Notes, December 2 - December 8, 2021‏‎ (35 revisions)
  422. BCAL Beam Tests 2006 - Analysis‏‎ (35 revisions)
  423. Start Counter Calibration Procedures‏‎ (35 revisions)
  424. Solenoid Current Studies‏‎ (35 revisions)
  425. Run Planning Meeting Noters, November 2- November 9, 2022‏‎ (35 revisions)
  426. Photon Reconstruction in b1pi events 04/25/2012‏‎ (35 revisions)
  427. Scripts for Installing GlueX Software‏‎ (35 revisions)
  428. Analysis DParticleCombo‏‎ (35 revisions)
  429. Level 1 Trigger‏‎ (35 revisions)
  430. Beam Time and Physics Proposals‏‎ (34 revisions)
  431. August 29, 2016, Analysis Working Group‏‎ (34 revisions)
  432. DIRC Software Tasks‏‎ (34 revisions)
  433. March 23, 2023, Patch panels and cables‏‎ (34 revisions)
  434. Goals for Spring 2014 Data Challenge‏‎ (34 revisions)
  435. Long term items‏‎ (34 revisions)
  436. Broadband Tagger Hodoscope‏‎ (34 revisions)
  437. Gams reconstruction‏‎ (34 revisions)
  438. BLTWG Meeting 03/14/2016‏‎ (34 revisions)
  439. Minutes-3-31-2016‏‎ (34 revisions)
  440. 2017 mcsmear Workplan‏‎ (34 revisions)
  441. Apr 29, 2010 Calorimetry‏‎ (34 revisions)
  442. Constants to Review‏‎ (34 revisions)
  443. PS acceptance and luminosity determination‏‎ (34 revisions)
  444. Dec 17, 2008 BCAL Construction‏‎ (34 revisions)
  445. Testing High Granularity Hodoscope‏‎ (34 revisions)
  446. Statement of Work for the 100% engineering drawings‏‎ (34 revisions)
  447. Run Planning Meeting Notes, Apr 19-Apr 25, 2018‏‎ (33 revisions)
  448. Run Planning Meeting Notes, Mar 04-Mar 11, 2020‏‎ (33 revisions)
  449. January 19, 2022 Calorimeter‏‎ (33 revisions)
  450. BLTWG Meeting 02/12/2009‏‎ (33 revisions)
  451. CDC prototype runs at CMU‏‎ (33 revisions)
  452. VME Controllers‏‎ (33 revisions)
  453. CDC garfield calcs‏‎ (33 revisions)
  454. 2007-11-14‏‎ (33 revisions)
  455. HOWTO Execute a Launch using NERSC‏‎ (33 revisions)
  456. CDC run 1280 bad events‏‎ (33 revisions)
  457. June 11, 2013 Solenoid Meeting‏‎ (33 revisions)
  458. June 17, 2009 Software‏‎ (32 revisions)
  459. StatusTable‏‎ (32 revisions)
  460. UNCW‏‎ (32 revisions)
  461. Field Bus and Controller Specifications‏‎ (32 revisions)
  462. Detector Material Budget in the Forward Direction‏‎ (32 revisions)
  463. August 13, 2014 Calibration‏‎ (32 revisions)
  464. Policies for Using Online Directories and Accounts‏‎ (32 revisions)
  465. Preparations for ERR Discussion June 20‏‎ (32 revisions)
  466. 2014-08-20‏‎ (32 revisions)
  467. OWG meeting 19-Jul-2007‏‎ (32 revisions)
  468. FCAL Backgrounds‏‎ (32 revisions)
  469. Journal Club‏‎ (32 revisions)
  470. Setup and tests‏‎ (32 revisions)
  471. Operating the Start Counter EPICS GUI (CSS-Work Space)‏‎ (32 revisions)
  472. Photon Beam Commissioning Discussion July 23, 2014‏‎ (32 revisions)
  473. Analysis Overview‏‎ (32 revisions)
  474. Visual inspection‏‎ (32 revisions)
  475. Run Planning Meeting Notes, November 11 - November 17, 2021‏‎ (32 revisions)
  476. April 20-21, 2020 DIRC‏‎ (32 revisions)
  477. Guide to roll-your-own python hddm transforms‏‎ (32 revisions)
  478. SWIF Analysis Jobs‏‎ (32 revisions)
  479. Kuraray Fibre Tests‏‎ (31 revisions)
  480. June 17, 2010 Readout‏‎ (31 revisions)
  481. Minutes-8-30-2012‏‎ (31 revisions)
  482. JEF meeting, March 3, 2023‏‎ (31 revisions)
  483. BLTWG Meeting 03/31/2014‏‎ (31 revisions)
  484. PWO Crystals‏‎ (31 revisions)
  485. New fADC with cosmics‏‎ (31 revisions)
  486. Oct 27, 2008 Calorimetry‏‎ (31 revisions)
  487. Sweep magnet 2‏‎ (31 revisions)
  488. GlueX-Related Google Groups‏‎ (31 revisions)
  489. June 14, 2016, Analysis Working Group‏‎ (31 revisions)
  490. PS Rate Monitor‏‎ (31 revisions)
  491. JLab Eta Factory‏‎ (31 revisions)
  492. December 3, 2014 Calibration‏‎ (31 revisions)
  493. December 21, 2007 Calorimetry‏‎ (31 revisions)
  494. CPP-NPP Target‏‎ (30 revisions)
  495. GlueX Offline Meeting, December 11, 2013‏‎ (30 revisions)
  496. JEF meeting, February 18, 2022‏‎ (30 revisions)
  497. CDC prototype more on timing‏‎ (30 revisions)
  498. GlueX Offline Meeting, November 14, 2012‏‎ (30 revisions)
  499. PS electronics test‏‎ (30 revisions)
  500. Hodoscope Prototype Development‏‎ (30 revisions)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)